Item no1,Item no2,Item no3,Item no4,Item no5,Item no6
Airports Authority Of India
Bid Publish Date
07-Feb-2026, 9:47 am
Bid End Date
28-Feb-2026, 9:00 am
Location
Progress
Quantity
5
Category
GEAR BOX ITEM NO. 1
Bid Type
Two Packet Bid
The opportunity is a proprietary gear box purchase by Visvesvaraya Iron And Steel Plant (a unit under Steel Authority of India Limited) located in Shimoga, Karnataka. The scope covers ** ELECON MAKE WORM GEAR BOX** across three items: Item No.1 (3.54” size, 70/1 ratio, 3 units), Item No.2 (3.54” size, 15/1 ratio, 1 unit), Item No.3 (1-3/4” size, 20/1 ratio, 1 unit). Delivery is required within 60 days from order; packing must be damage-free; delivery is on freight paid on door delivery to VISL STORES, BHADRAVATHI. The clause confirms this is a proprietary purchase by ELECON ENGINEERING COMPANY LIMITED, with test & guarantee certificates and supplier evaluation based on performance. The procurement emphasizes direct supply and vendor certification. Unique terms include quantity variation up to 25% and door-delivery terms for GST ITC alignment.
Gear Box: ELECON MAKE WORM GEAR BOX
Item No.1: Size 3.54”, Ratio 70/1, Quantity 3 NOS, Serial No. 1050232
Item No.2: Size 3.54”, Ratio 15/1, Quantity 1 NOS, Serial No. 1066670
Item No.3: Size 1-3/4”, Ratio 20/1, Quantity 1 NOS, Serial No. 1070003
Delivery: 60 days from order date; VISL STORES, BHADRAVATHI, freight on door delivery
Certificate: Test & Guarantee certificates to be furnished with supply
Packing: Damage-free packing required; packaging integrity to be verified at delivery
Compliance: Proprietary purchase; supplier must be ELECON authorized for supply
Proprietary purchase of ELECON gear boxes; verify supplier authorization
Delivery within 60 days from order; door delivery to VISL STORES, Bhadravathi
Test & Guarantee certificate required with every supply; damage-free packing mandatory
Quantity variation allowed up to 25% during contract; extended delivery period rules apply
GST ITC mechanics: disclose outward supplies in Form GSTR-1; ITC impact disclosed in Form GSTR-2A/2B
Door delivery to VISL STORES, BHADRAVATHI; freight paid by purchaser; delivery within 60 days from order date
Supply must include Test & Guarantee Certificate; warranty period not explicitly stated in data
Purchaser may increase or decrease order quantity up to 25% of bid quantity; same rates apply; extended period rules apply
Proprietary purchase eligibility for ELECON gear box supply
Authorized distributor or OEM-level supplier for ELECON worm gear boxes
Capability to provide Test & Guarantee Certificates with delivery
Demonstrated delivery performance within 60 days for similar equipment
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Airports Authority Of India
Sashastra Seema Bal (ssb)
WEST DELHI, DELHI
Kamarajar Port Limited
CHENNAI, TAMIL NADU
Damodar Valley Corporation
Airports Authority Of India
MALAPPURAM, KERALA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar gear box supply
Financial statements / turnover evidence
Emd/Security deposit document (if applicable in terms)
Technical bid documents demonstrating ELECON worm gear box specifications
OEM authorization or supplier authorization for ELECON gear boxes
Test & Guarantee certificates to accompany delivery
Delivery acceptance certificates and packing guarantee
Any GST compliance documentation as required by VISL
Key insights about KARNATAKA tender market
Bidders must be authorized for ELECON worm gear boxes and submit a technical bid with Test & Guarantee certificates. Provide GST, PAN, turnover proof, and experience certificates. Deliver within 60 days of order to VISL stores, Bhadravathi; include door-delivery packing at no damage.
Submit GST certificate, PAN card, vendor experience certificates for similar gear boxes, financial statements, and OEM authorizations. Include Test & Guarantee certificates for each gear box item and packing guarantee. Provide delivery schedule confirming 60-day timeline from order date.
Item 1: 3.54” size, 70/1 ratio, 3 NOS; Item 2: 3.54” size, 15/1 ratio, 1 NOS; Item 3: 1-3/4” size, 20/1 ratio, 1 NOS. All are ELECON make worm gear boxes with required serial numbers and must include Test & Guarantee certificates.
Delivery must be completed within 60 days from order date; packing must be damage-free. Freight is on door delivery to VISL STORES, BHADRAVATHI, ensuring safe transit and minimal risk of damage in transit.
GST ITC depends on outward supplies being auto-populated in GSTR-2A/2B; if not, VISL may deduct the tax component from future bills. Vendors must disclose GSTR-1 outward supplies to enable ITC realization.
Only authorized ELECON ENGINEERING COMPANY LIMITED suppliers may participate; the tender specifies proprietary purchase. Ensure proper OEM authorization and ability to furnish Test & Guarantee certificates along with delivery.
Evaluation is based on supplier Test & Guarantee Certificates, ability to deliver within 60 days, damage-free packing, and conformity to the proprietary purchase terms; delivery performance and packing quality directly impact the final acceptance.
National Fertilizers Limited (nfl)
📍 GUNA, MADHYA PRADESH
Rourkela Steel Plant
📍 SUNDERGARH, ODISHA
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS