Title1,Title2,Title3,Title4,Title5
Directorate Of Oil Seeds Development
HYDERABAD, TELANGANA
Bid Publish Date
15-Jun-2026, 11:28 am
Bid End Date
25-Jun-2026, 12:00 pm
Location
Progress
Quantity
202
Category
Title1
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, seeks an ISO 9001 certified supplier for equipment under a 2026 procurement tender. The delivery location is 119 Aslt Engr Regt, C/o 56 AapO, Patiala Cantt, Punjab 914119. Estimated value and EMD amounts are not disclosed in the provided data. A key differentiator is the option to adjust order quantity by up to 25% during and after contract award, with delivery timelines tied to the original period and extended quantities. The buyer requires Detailed Design Drawings approval within 5 days of contract award, with modification lists provided within 5 days if needed. This tender emphasizes adherence to ISO 9001 and a formal design-approval process prior to fabrication. The scope includes on-site delivery and potential commissioning at the specified Patiala address, under a framework that allows flexible quantities and tightened design control. Unique aspects include the option clause for quantity variation and the requirement for pre-fabrication drawings approval. Prospective bidders should prepare for a design-review phase immediately after award and align production timelines to the approval outcomes. The absence of project-specific item details suggests a broader supply category under the Army’s procurement umbrella, with emphasis on quality management systems and engineering documentation.
ISO 9001 certification mandatory for bidder or OEM
Delivery address: 119 Aslt Engr Regt, Patiala Cantt, Punjab 914119
Detailed Design Drawings to be submitted within 5 days of award
Buyer to approve or list modifications within 5 days
Quantity adjustment right up to 25% with corresponding delivery-time calculations
Original delivery period minimum 30 days for added quantity
Delay in drawings approval shifts delivery period without LD
EMD amount not disclosed; follow standard government bid procedures
25% quantity variation rights exercisable by buyer with contracted rates
ISO 9001 certification required for bidder or OEM
5-day design drawing submission and 5-day modification/approval cycle
Quantity may be increased/decreased by 25%; additional time calculated with minimum 30 days; potential extension to original delivery period during option exercise.
Submit Detailed Design Drawings within 5 days of award; buyer approves or issues modification list within 5 days; delays shift delivery without LD.
Provide PAN, GSTIN, Cancelled Cheque, and EFT Mandate for vendor code creation.
ISO 9001 certification holder or OEM-specified supplier
Ability to deliver to Patiala Cantt, Punjab
Compliance with design-drawing approval timelines (5 days submission, 5 days response)
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Title1 , Title2 , Title3 , Title4 , Title5
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Directorate Of Oil Seeds Development
HYDERABAD, TELANGANA
Employees Provident Fund Organisation (epfo)
CHENNAI, TAMIL NADU
Indian Army
WEST DELHI, DELHI
State Bank Of India (sbi)
KAMRUP, ASSAM
Central Public Works Department (cpwd)
VISAKHAPATNAM, ANDHRA PRADESH
Tender Results
Loading results...
Title1
Pulling rope 18mm dia minimum capacity 15 ton and above
Title2
Bridge open rope 30mm dia with capacity 70000kgs
Title3
Bridge open rope 32 mm dia with capacity 70000kgs
Title4
Nk Fastemers for bridge open rope 30 and 32 mm dia
Title5
NK Towing attachment assy
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Title1 | Pulling rope 18mm dia minimum capacity 15 ton and above | 90 | nos | varun1995 | 15 | |
| 2 | Title2 | Bridge open rope 30mm dia with capacity 70000kgs | 40 | nos | varun1995 | 15 | |
| 3 | Title3 | Bridge open rope 32 mm dia with capacity 70000kgs | 40 | nos | varun1995 | 15 | |
| 4 | Title4 | Nk Fastemers for bridge open rope 30 and 32 mm dia | 16 | nos | varun1995 | 15 | |
| 5 | Title5 | NK Towing attachment assy | 16 | nos | varun1995 | 15 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate (bank-certified)
ISO 9001 certification document (for bidder or OEM)
Design Drawings (initial submission within 5 days of award)
Any OEM authorization if bidding on behalf of supplier
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate for vendor code creation. Ensure ISO 9001 certification is held by you or the OEM. Prepare Detailed Design Drawings within 5 days of award and respond to modification lists within 5 days.
Required documents include PAN card copy, GSTIN copy, cancelled cheque, EFT Mandate, and ISO 9001 certification. If bidding on behalf of an OEM, provide OEM authorization. Pre-award drawings submissions are mandatory within 5 days of award.
Submit Detailed Design Drawings within 5 days of award. The buyer will approve or issue a complete modification list within another 5 days. If there is a delay in approval, the delivery period is adjusted without liquidated damages for the delay period.
The purchaser may increase or decrease the quantity by up to 25% of the bid quantity at contract placement and during the currency. Delivery time for additional quantity is calculated as (Additional/Original) × Original delivery period, with a minimum of 30 days.
Delivery and installation are to be at 119 Aslt Engr Regt, C/o 56 AapO, Patiala Cantt, Punjab 914119. Completion is tied to approved drawings; delays in drawing approvals may shift the delivery timeline without LD.
Bidders must have ISO 9001 certification either directly or via the OEM of the offered products. This requirement ensures a formal quality management system is in place before delivery and installation.
Key emphasis includes ISO 9001 compliance, a 5-day design-drawings submission window, a 5-day approval/modification period, and a quantity variation clause up to 25% with corresponding delivery-time adjustments.
Payment terms are defined by standard buyer terms; EMD details are not disclosed here. Ensure all required documents are submitted, drawings are approved timely, and delivery aligns with the extended schedule if quantity changes occur.
State Bank Of India (sbi)
📍 HYDERABAD, TELANGANA
Western Railway
📍 RATLAM, MADHYA PRADESH
Indian Army
📍 KOLKATA, WEST BENGAL
Indian Army
📍 JALPAIGURI, WEST BENGAL
N/a
📍 KANPUR NAGAR, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS