Indian Army Throttle Cable, Seal Oil, Oil Filter, Fan Belt, Hydraulic Hose Procurement Lalitpur Uttar Pradesh 2026
Indian Army
LALITPUR, UTTAR PRADESH
Bid Publish Date
04-Jul-2026, 8:06 pm
Bid End Date
14-Jul-2026, 9:00 pm
Location
Progress
Quantity
9
Category
THROTTLE CABLE
Bid Type
Single Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a multi‑item procurement package in Lalitpur, Uttar Pradesh for components including throttle cable, tube, fan belt, temperature sensor, hydraulic hose, seal oil, and turbocharger. The BOQ outlines 7 items with unspecified quantities, signaling a framework purchase with potential variation. The buyer reserves up to 25% quantity flex during contract execution and up to 25% additional quantity at contracted rates. A delivery timeline is tied to the last date of the original delivery order, with adjustments if quantities change. An advance sample approval is required within 5 days of contract award, failing which delivery periods may be revised. This tender emphasizes sample conformity and post‑award bulk execution under approved specifications.
No explicit technical specifications are published. Key tender mechanics include:
Critical terms and bidder requirements include:
Product/service names: throttle cable, tube, fan belt, temperature sensor, hydraulic hose, seal oil, turbocharger
Quantity: not disclosed in data; 7 items in BOQ with N/A quantities
Estimated value: not disclosed
Delivery location: Lalitpur, Uttar Pradesh 284122
Standards/certifications: not specified in tender data
Warranty/AMC: not specified
Testing/quality: not specified
Quantity variation up to 25% during contract and currency
Advance sample approval required within 5 days of award
Delivery period adjustments if sample approval delayed
Bulk supply to follow approved samples with modification lists
No liquidated damages provision stated without delay due to buyer actions
Not specified in data; bidders should anticipate standard government terms and confirm with the buyer during final bid
Delivery period linked to last date of original order; extended time calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Liquidated damages not explicitly defined; delays attributed to buyer approvals may freeze LD applicability per sample approval clause
Experience in supplying automotive/industrial components similar to throttle cables, hoses, sensors or turbochargers
Demonstrated ability to meet framework purchase terms with quantity variation
Financial capacity to manage contract scope and potential bulk quantities
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
THROTTLE CABLE , TUBE , FAN BELT , TEMP SENSOR , HYDROLIC HOSE , SEAL OIL , TURBOCHARGER
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
LALITPUR, UTTAR PRADESH
Indian Army
Indian Army
Indian Army
RAJAURI, JAMMU & KASHMIR
Indian Army
TINSUKIA, ASSAM
Tender Results
Loading results...
THROTTLE CABLE
THROTTLE CABLE
TUBE
TUBE
FAN BELT
FAN BELT
TEMP SENSOR
TEMP SENSOR
HYDROLIC HOSE
HYDROLIC HOSE
SEAL OIL
SEAL OIL
TURBOCHARGER
TURBOCHARGER
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | THROTTLE CABLE | THROTTLE CABLE | 1 | pieces | rajeshwar1985 | 15 | |
| 2 | TUBE | TUBE | 1 | pieces | rajeshwar1985 | 15 | |
| 3 | FAN BELT | FAN BELT | 1 | meter | rajeshwar1985 | 15 | |
| 4 | TEMP SENSOR | TEMP SENSOR | 1 | pieces | rajeshwar1985 | 15 | |
| 5 | HYDROLIC HOSE | HYDROLIC HOSE | 2 | pieces | rajeshwar1985 | 15 | |
| 6 | SEAL OIL | SEAL OIL | 2 | pieces | rajeshwar1985 | 15 | |
| 7 | TURBOCHARGER | TURBOCHARGER | 1 | pieces | rajeshwar1985 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar procurements
Financial statements demonstrating financial capacity
Earnest Money Deposit (EMD) documents or equivalent bid security
Technical bid documents confirming compliance with terms
OEM authorizations or authorized distributor letters
Any specific sample conformity certificates if required by the Buyer
Key insights about UTTAR PRADESH tender market
Bidders should prepare GST, PAN, financial statements, and experience certificates, plus OEM authorizations. Submit EMD as per buyer guidance and provide technical bid documents addressing product categories: throttle cable, tubes, belts, sensors, hoses, oils, turbochargers. Ensure sample submission within five days of award and be ready for quantity variation up to 25%.
Required documents include GST certificate, PAN, experience certificates for similar supply, financial statements, EMD documentation, technical bid, and OEM authorization letters. Additional supplier declarations may be requested to confirm capability for bulk manufacturing and adherence to approved samples.
The tender data lists product categories only; no explicit specifications are provided. Bidders should rely on the advance sample and modification list process, ensuring final bulk supplies conform to the approved sample. Confirm any OEM or brand requirements during bid submission.
An advance sample must be submitted within 5 days of contract award. The buyer will approve or provide modification requirements within five days; delays may trigger a refixed delivery period and could affect scheduling and acceptance of bulk supply.
The purchaser may increase or decrease order quantity up to 25% at contract time and during the currency. Delivery timelines adjust according to the formula (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.
The terms emphasize sample approval delays affecting delivery timelines but do not specify explicit LD values. If buyer approval delays occur, the delivery period may be refixed without LD, provided the contract terms are followed and approvals are completed within the stipulated 5‑day window.
Delivery location is Lalitpur, Uttar Pradesh 284122. The scope covers seven item categories: throttle cable, tube, fan belt, temp sensor, hydraulic hose, seal oil, and turbocharger, with no disclosed quantities in the BOQ, indicating a framework purchase with potential bulk following approved samples.
Bidders must produce an advance sample within 5 days, obtain Buyer approval or modification instructions within 5 days, and ensure bulk production adheres to the approved sample. If the sample is deemed non‑conforming, the Buyer may require new samples or terminate the contract.
Indian Army
📍 MATHURA, UTTAR PRADESH
Indian Army
📍 WEST KAMENG, ARUNACHAL PRADESH
Indian Army
📍 DARJEELING, WEST BENGAL
Indian Army
📍 KARGIL, JAMMU & KASHMIR
Indian Army
📍 SRINAGAR, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS