TenderDekho Logo
Get OEM Verified in 20 Days Apply
GEM

Indian Army Solar Field Electrification 3 KVA Tender Jammu 2026 - IS 550/IS0 Specifications & Govt Supply Terms

Bid Publish Date

08-Jun-2026, 11:50 am

Bid End Date

29-Jun-2026, 12:00 pm

Progress

Issue08-Jun-2026, 11:50 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

12

Bid Type

Two Packet Bid

Categories 1

Tender Overview

The Indian Army, Department Of Military Affairs, issues a tender for Solar Field Electrification at a 3 KVA capacity in Jammu, Jammu & Kashmir (180001). The scope covers Supply, Installation, Testing and Commissioning of solar field equipment, with mandatory detailed design drawings approval before fabrication. The bid accommodates quantity flexibilities (up to 25% increase) and requires precise scheduling based on delivery periods linked to original orders. A unique feature is the drawing approval workflow that can extend delivery timelines if approvals are delayed, without LD penalties. The package emphasises OEM or OEM-certified resources for installation and commissioning and mandates specific vendor code creation documentation.

Key differentiators include the option clause on quantity, the requirement for Detailed Design Drawings within 7 days of award, and a fixed process for drawing modifications within 7 days of submission. The procurement is tailored for government compliance and ensures alignment with central/state govt procurement practices, ensuring that the successful bidder can operate under military standards and integration with existing solar infrastructure.

Technical Specifications & Requirements

  • No technical specifications are provided in the tender text.
  • Scope: Supply, Installation, Testing and Commissioning of solar field equipment for a 3 KVA system.
  • Drawings: Detailed Design Drawings to be approved by the buyer within 7 days of contract award; modifications to be provided in 7 days if required.
  • Experience: Bidder or its OEM must have 3 years of regular manufacture/supply to Central/State Govt Organizations or PSUs.
  • Installation/Commissioning: Must be performed by OEM or OEM-certified resources or OEM-authorised resellers.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25% at contract time and during currency, with delivery periods recalculated accordingly.
  • Payment/Delivery: Delivery period starts from last date of original delivery order; extended period adjustments apply; LD not applied for buyer-delays in drawing approval.
  • Documentation for Vendor Code Creation: Copy of PAN, GSTIN, Cancelled Cheque, and EFT Mandate copy.
  • Turnover/Experience: Minimum 3 years Govt/PSU supply experience; annual turnover requirement stated but numeric value not provided in the excerpt.
  • Installation/Training: Conducted by OEM or OEM-certified personnel or authorised reseller.
  • Scope of Supply: Bid price must include all costs for supply, installation, testing and commissioning.
  • Warranty/Support: Not explicitly specified in the excerpt; crucial to confirm during bid stage.

Key Specifications

  • Product/Service: Solar Field Electrification for 3 KVA system (Supply, Installation, Testing, Commissioning)

  • Delivery/Timeline: Drawing approval within 7 days; modification list within 7 days; delivery timeline adjustable if approvals delayed

  • Experience: 3 years of regular manufacture/supply to Central/State Govt Organizations or PSUs

  • Installation: Performed by OEM-certified resource or OEM-authorised reseller

  • Scope: Include all cost components in bid price (Supply, Installation, Testing, Commissioning)

Terms & Conditions

  • Option Clause: Up to 25% quantity variation with adjusted delivery period

  • Mandatory design drawings approval before fabrication

  • 3 years govt/PSU experience required; OEM or OEM-certified installation

Important Clauses

Payment Terms

Delivery periods adjusted if drawings approval is delayed; LD not applied for buyer delay in drawing approvals

Delivery Schedule

Original delivery period; additional time formula (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days

Penalties/Liquidated Damages

LD applicability is waived for buyer delays in drawing approvals; standard penalties not specified in excerpt

Bidder Eligibility

  • 3 years of government/PSU supply experience with relevant product category

  • OEM or OEM-certified resource for installation and testing

  • Financial viability evidenced by turnover documentation (exact value not provided in excerpt)

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Solar Field Electrification 3 KVA

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9435325.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Government Tender Published for Supply and Construction of Solar Hybrid Plant 3.5 KVA in UDHAMPUR, JAMMU AND KASHMIR

IHQ of MoD (Army)-(OSCC)

UDHAMPUR, JAMMU AND KASHMIR

Posted: 25 December 2025
Closed: 31 December 2025
EPROCURE

Indian Army Field Electrification Solar Light 30W Tender Jammu 2025 – ISI/ OEM Authorized, Akhnoor, 30W Solar Light

Indian Army

JAMMU, JAMMU & KASHMIR

Posted: 11 December 2025
Closed: 22 December 2025
GEM

Provn of Qty 07 Fd Electrification (5 kVA Solar Hybrid) (2630)

Indian Army

Posted: 13 November 2024
Closed: 4 December 2024
GEM

SUPPLY AND INSTALLATION OF 5 KVA SOLAR

Indian Army

PITHORAGARH, UTTARAKHAND

Posted: 20 December 2024
Closed: 10 January 2025
GEM

Portable Field Electrification Solar Set 10kW

Indian Army

AMRITSAR, PUNJAB

Posted: 18 May 2025
Closed: 9 June 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate duly certified by Bank

5

Evidence of 3 years govt/PSU supply experience (contracts/agreements)

6

Documentation proving OEM-certified installation capability or OEM authorization

7

Any prior relevant project references for central/state govt procurement

8

Draft Detailed Design Drawings submitted within 7 days of award (and buyer approvals)

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

What documents are required for the solar field tender in Jammu?

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and evidence of 3 years govt/PSU supply experience. OEM authorization or OEM-certified installation capacity is mandatory, along with Detailed Design Drawings within 7 days of award and approval status from the buyer.

How does the 25% quantity option clause affect delivery in this tender?

The purchaser may increase/decrease bid quantity up to 25%, with delivery period recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. If original period is under 30 days, the period equals the original duration.

What installation qualifications are required for the solar project in Jammu?

Installation must be carried out by OEM or OEM-certified resources, or OEM authorised resellers. This ensures compatibility with 3 KVA solar equipment and aligns with central govt procurement standards for performance and warranty support.

What is expected in the Detailed Design Drawings for approval?

Successful bidders must submit Detailed Design Drawings within 7 days of award. The buyer will approve or provide a modification list within 7 days; any delay relays to adjusted timelines with no LD for buyer-caused delays.

What is the experience requirement for bidders in this procurement?

Bidder or its OEM must have 3 years of regular manufacture and supply to Central/State Govt Organizations or PSUs, with contract copies submitted as proof for each year of activity.

What scope is included in the bid price for this tender in Jammu?

Bid price must cover Supply, Installation, Testing, and Commissioning of the 3 KVA solar field equipment, including all related components, labor, and incidental charges as per buyer’s terms.

Are there any penalties for delays due to design approvals in this tender?

The clause waives LD for delays arising from buyer delays in drawing approvals; otherwise, penalties, if any, are governed by standard contract terms and must be clarified during bidding.

What is the geographic scope for this solar tender?

Location specified is Jammu, Jammu & Kashmir (PIN 180001). The procurement is aimed at government deployment within this region for solar field electrification at 3 KVA capacity.

Similar Tenders

5 found
Urgent

Indian Army Solar Electrification Project 35 KVA Tender Jammu & Kashmir 2026 IS 550 Compliant

Indian Army

📍 RAJAURI, JAMMU & KASHMIR

EMD: ₹2.0 L
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM

Off - Grid Solar Photovoltaic (PV) Power Plant (V2)

Directorate Of Sheep Husbandry Jammu Division

📍 DODA, JAMMU & KASHMIR

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Bids are Invited For Supply and Construction of Solar Hybrid 150 KW in LEH LADAKH, LADAKH

IHQ of MoD (Army)-(OSCC)

📍 LEH LADAKH, LADAKH

EMD: ₹9.2 L
⏰ Deadline: 3 weeks left
🛒 Type: Works
View EPROCURE
Urgent

Lithium ion solar battery

Development Commissioner (micro Small & Medium Enterprises)

📍 ROHTAK, HARYANA

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM

Lithium ion solar battery

Railtel Corporation Of India Limited

📍 WEST DELHI, DELHI

EMD: ₹6.9 L
Est: ₹3.5 Cr
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM