GEM

Indian Army DRIVE BELT STARTER MOTOR PINION WHEEL SPACER KIT HOSE ASY Tender 2025

Bid Publish Date

27-Nov-2025, 4:48 pm

Bid End Date

08-Dec-2025, 5:00 pm

Progress

Issue27-Nov-2025, 4:48 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

5

Category

DRIVE BELT

Bid Type

Two Packet Bid

Categories 10

Tender Overview

The opportunity is issued by the Indian Army (Department Of Military Affairs) for a bundle of automotive drivetrain and hose assembly components, including DRIVE BELT, STARTER MOTOR, PINION, WHEEL SPACER KIT, HOSE ASY. The tender notes a flexible quantity clause allowing up to 25% variation at contract award and during the contract, at contracted rates. Delivery period rules reference the last date of the original delivery order with adjustments for extended periods. Location details are not disclosed, and no estimated value or EMD amounts are provided. This tender requires bidders to anticipate potential scope changes and align with the buyer’s option clause while maintaining compliance with procurement procedures.

Technical Specifications & Requirements

  • Product categories: DRIVE BELT, STARTER MOTOR, PINION, WHEEL SPACER KIT, HOSE ASSEMBLY
  • BOQ entries: 5 items; all items listed as N/A (no quantitative data provided)
  • No explicit technical specifications, standards, or performance metrics stated in the available data
  • No delivery location, installation requirements, or warranty details specified
  • The tender text emphasizes the right to modify quantity up to 25% and to adjust delivery timelines based on the option clause
  • Implicit need for standard government procurement compliance and alternative scopes as per contractual negotiations

Terms, Conditions & Eligibility

  • Key clause: Purchaser may increase/decrease quantity up to 25% of bid quantity at contract placement and during currency at contracted rates
  • Delivery period adjustments are computed as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days unless original delivery period exceeds
  • If exercised, extended delivery time may still be bounded by the original delivery period; bidders must comply with these terms
  • No explicit EMD amount, payment terms, or mandatory experience/turnover criteria provided in the data
  • Documentation requirements are not enumerated in the terms; standard bidder submissions (GST, PAN, experience certificates, financial statements, etc.) are typically expected in such procurements but are not explicitly listed here

Key Specifications

  • Product/service names and categories: DRIVE BELT, STARTER MOTOR, PINION, WHEEL SPACER KIT, HOSE ASSEMBLY

  • Quantities/volumes: not disclosed; 5 BOQ items listed as N/A

  • Estimated value/EMD: not provided in tender data

  • Experience requirements: not specified in data; typically bidders need automotive components supply experience

  • Quality/standards: not specified; no IS/ISO/ISI references given in data

  • Delivery/installation: no explicit schedule; option clause governs quantity and delivery timing

  • Warranty/AMC: not specified in tender data

Terms & Conditions

  • 25% quantity variation permitted at contract and during currency

  • Delivery timelines adjust based on increased quantity with minimum 30 days

  • No explicit EMD, value, or detailed technical specs provided

Important Clauses

Delivery & Quantity Flexibility

Purchaser may adjust quantity by up to 25% at contract award and during currency; delivery period recalculated accordingly with a minimum extension of 30 days.

Option Clause Implementation

Original delivery period governs extended deliveries; calculated time formula applies unless original period is under 30 days.

Compliance With Bid Terms

Bidders must comply with the option clause and all non-specified terms as applicable to DRVE BELT and related components procurement.

Bidder Eligibility

  • Experience in supplying automotive drivetrain components (drive belts, starters, pinions, spacers, hoses)

  • Financial capabilities to handle contract scale (as evidenced by financial statements)

  • Ability to meet delivery deadlines and adjust to quantity changes per option clause

Past Similar Tenders (Historical Results)

5 found

Indian Army Hyd Hose, Fan Belt, Oil Pipe Tender Procurement 2025 in India with 25% quantity option

Indian Army

UDHAMPUR, JAMMU & KASHMIR

Posted: 31 October 2025
Closed: 10 November 2025
GEM

WHEEL CYL ASSY,CYL ASSY HEAD BRAKE MASTER,WIPER MOTOR,STARTER SOLEMOID,AIR FILTER ASSY,BOLT TEE HEA

Indian Army

GURDASPUR, PUNJAB

Posted: 3 August 2025
Closed: 13 August 2025
GEM

Self Starter Assy,Fan Belt,Hose Pipe Small,Oil Seal,Stopper Cable

Indian Army

SONITPUR, ASSAM

Posted: 8 February 2025
Closed: 10 March 2025
GEM

Self Starter Assy,Fuel Filter,Air Filter,Fan Belt,Oil Filter,Hose Pipe

Indian Army

DARJEELING, WEST BENGAL

Posted: 25 January 2025
Closed: 15 February 2025
GEM

STARTER MOTOR ASSY,HOSE PIPE,PISTON RING SET,FAN BELT,CYLINDER HEAD GASKET,AIR FILTER,FUEL FEED PUM

Indian Army

DARJEELING, WEST BENGAL

Posted: 16 July 2025
Closed: 26 July 2025
GEM

Bill of Quantities (BOQ) 5 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 DRIVE BELT SSL 1 pieces team2@63 15
2 STARTER MOTOR SSL 1 pieces team2@63 15
3 PINION SSL 1 pieces team2@63 15
4 WHEEL SPACER KIT SSL 1 pieces team2@63 15
5 HOSE ASSY SSL 1 pieces team2@63 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience Certificates for similar vehicle/components supplies

4

Financial Statements (last 3 years) or solvency certificate

5

EMD/Security Deposit payment proof (as per organization norms)

6

Technical Bid/Technical Compliance statement

7

OEM Authorization/Manufacturer’s Authorization Letter (if bidding on behalf of OEM)

8

Any prior contract performance certificates or reference letters

Frequently Asked Questions

Key insights about ARUNACHAL PRADESH tender market

How to bid for Indian Army drive belt starter motor tender in 2025

Bidders should prepare standard documents (GST, PAN, experience certificates, financials) and submit a Technical Bid with compliance for automotive components. The tender allows up to 25% quantity variation and requires readiness for delivery timeline adjustments per the option clause.

What documents are required for Indian Army vehicle parts tender 2025

Essential documents typically include: GST certificate, PAN card, experience certificates for similar supplies, last 3 years financial statements, EMD proof, technical compliance, and OEM authorization if bidding for an OEM. Ensure submission with the bid.

What are the technical specifications for drive belt and hose assemblies

The current data lists the categories as DRIVE BELT, STARTER MOTOR, PINION, WHEEL SPACER KIT, HOSE ASSEMBLY but provides no explicit specifications. Bidder should prepare to demonstrate compatibility with standard automotive drivetrain requirements and be ready to supply OEM specifications if requested.

When is the delivery timeline for quantity adjustments in Army tender

Delivery adjustments follow the option clause: the extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; this applies during contract currency if quantity changes are exercised.

What is the EMD requirement for this Indian Army procurement

The tender data does not specify an EMD amount. Bidders should consult the official tender documents or contact the procuring authority to confirm the exact EMD or security deposit required for bid submission.

What is required to prove eligibility for Army vehicle parts supply

Eligibility typically requires demonstrable experience in automotive parts supply, financial stability evidenced by statements, GST compliance, and potential OEM authorization; ensure readiness to meet the option clause and delivery terms when challenged.

How to prepare for quantity fluctuation up to 25 percent

Plan for scalable production or sourcing, ensure supplier capacity to ramp up or down, and price contracts at fixed rates to accommodate the 25% variation; maintain inventory buffers and flexible logistics to meet adjusted timelines.

Similar Tenders

5 found

Front Hub Shaft RH,Kit Pad Assy Front,Assy Oil Filter,Assy Fuel Filter,Wheel Cyl Assy,Brake Pad Set

Indian Army

📍 SONITPUR, ASSAM

Est: ₹49,955
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Indian Army Bathinda Procurement AC BELT HOSE SUCTION BULB WIPER BLADE GLASS BACK WINDOW 2025

Indian Army

📍 BATHINDA, PUNJAB

Est: ₹35,000
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM

Hose Assy,Door Regulator Assy LH,Roller Brg,Fuel Pump Motor,Lock Washer,Driven Plate for Clutch,Spa

Indian Army

📍 Pathankot, PUNJAB

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

CROSS ASSY,OIL SEAL,SA WATER PUMP,ASSY PULL CABLE,OIL SEAL,ABOSRVER ASSY FRONT SHOCK,STATER MOTOR 2

Indian Army

📍 AGRA, UTTAR PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Indian Army Accelerator Cable & Mechanical Spare Parts Tender Ranchi Jharkhand 2025

Indian Army

📍 RANCHI, JHARKHAND

Est: ₹23,000
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM