12F ADSS Cable,Tension Assembly Set,Suspension Assembly Set,Demountable Pulley,Adjustable Cable Sto
Indian Army
WEST KAMENG, ARUNACHAL PRADESH
Bid Publish Date
27-Jun-2026, 7:14 pm
Bid End Date
18-Jul-2026, 11:00 am
EMD
₹18,88,000
Location
Progress
Quantity
12652
Category
12 Core ADSS Optical Fiber Cable
Bid Type
Two Packet Bid
Controller General Of Defence Accounts invites bids for a comprehensive procurement package spanning 12 Core ADSS Optical Fiber Cable, 7 Mtrs GI Tubular Poles, 9 Mtrs GI Tubular Poles, Tension & Suspension Assemblies, Demountable/Adjustment hardware, OFC Joint Enclosures, ROW charges, and laying/termination components for overhead networks in SONITPUR, ASSAM. The bid requires an EMD of ₹1,888,000 and submission of a complete Data Sheet with the bid. A key commercial clause permits up to 25% quantity variation during contract execution, with adjusted delivery timelines. Experience criteria mandate supply to government entities for at least 3 years and OEM installation responsibility remains with the vendor. GST clarity is bidder responsibility; GST applicable as per actual rates. The plan emphasizes OEM-led installation, testing, and training where applicable. The BOQ includes 19 items, indicating a sizable, multi-component deployment scope.
12 Core ADSS Optical Fiber Cable
GI Tubular Poles: 7 meters and 9 meters for overhead installation
Tension Assembly Set, Suspension Assembly Set, Demountable Pulley, Adjustable Cable Storage Bracket
OFC Joint Enclosures, Fiber Termination Box, Patch Cord, Pigtail
R.O.W charges included; lay of GI Pipe 2 inch diameter
OTDR, Splicing Machine, Optical Power Meter, MUX STM-1 with 120 Km SFP Module
Splicing and termination equipment to support 12F ADSS overhead installation
Delivery terms allow up to 25% variation; minimum delivery extension 30 days
EMD of ₹1,888,000; submission with bid and payment terms as per GOI norms
Experience: 3 years govt/PSU supply; OEM installation responsibility
Data Sheet alignment mandatory; not-obsolete product requirement; GST responsibility on bidder
GST payment/reimbursement as per actuals or applicable rate; bidder bears GST calculation; no fixed rate guarantee by CGDA.
Option to increase quantity up to 25%; additional time formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Not explicitly specified; delivery extension is allowed via option clause with calculated timeframe; ensure contract terms provide LD if delays occur.
3+ years of regular govt/PSU supply of similar ADSS/fiber/OFC equipment
Not under liquidation, bankruptcy, or court receivership
GSTIN active; PAN provided; EFT mandate with bank certification
OEM authorization for installation/commissioning where applicable
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
12 Core ADSS Optical Fiber Cable , 7 Mtrs GI Tubular Poles for Overhead , 9 Mtrs GI Tubular Poles for Overhead , Tension Assembly Set , Suspension Assembly Set , Demountable Pulley , Adjustable Cable Storage Bracket , OFC Joint Enclosure , Erection of GI Tubular Poles alonwith Fixation of Accessories , Laying of 12F ADSS Cable Overhead on the Poles , Patch Cord , Pigtail , OTDR , Splicing Machine , Optical Power Meter , Multiplexer STM 1 MUX with 120 Km SFP Module , Laying of GI Pipe 2 inch 50 mm Diameter , Fiber Termination Box , ROW Charges
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
WEST KAMENG, ARUNACHAL PRADESH
Indian Army
PUNE, MAHARASHTRA
Bharat Heavy Electricals Limited (bhel)
Indian Army
SOUTH GOA, GOA
Indian Army
JODHPUR, RAJASTHAN
Tender Results
Loading results...
12 Core ADSS Optical Fiber Cable
12 Core ADSS Optical Fiber Cable
7 Mtrs GI Tubular Poles for Overhead
7 Mtrs GI Tubular Poles for Overhead
9 Mtrs GI Tubular Poles for Overhead
9 Mtrs GI Tubular Poles for Overhead
Tension Assembly Set
Tension Assembly Set
Suspension Assembly Set
Suspension Assembly Set
Demountable Pulley
Demountable Pulley
Adjustable Cable Storage Bracket
Adjustable Cable Storage Bracket
OFC Joint Enclosure
OFC Joint Enclosure
Erection of GI Tubular Poles alonwith Fixation of Accessories
Erection of GI Tubular Poles alonwith Fixation of Accessories
Laying of 12F ADSS Cable Overhead on the Poles
Laying of 12F ADSS Cable Overhead on the Poles
Patch Cord
Patch Cord
Pigtail
Pigtail
OTDR
OTDR
Splicing Machine
Splicing Machine
Optical Power Meter
Optical Power Meter
Multiplexer STM 1 MUX with 120 Km SFP Module
Multiplexer STM 1 MUX with 120 Km SFP Module
Laying of GI Pipe 2 inch 50 mm Diameter
Laying of GI Pipe 2 inch 50 mm Diameter
Fiber Termination Box
Fiber Termination Box
ROW Charges
ROW Charges
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 12 Core ADSS Optical Fiber Cable | 12 Core ADSS Optical Fiber Cable | 133 | km | ankit980 | 270 | |
| 2 | 7 Mtrs GI Tubular Poles for Overhead | 7 Mtrs GI Tubular Poles for Overhead | 2,550 | nos | ankit980 | 270 | |
| 3 | 9 Mtrs GI Tubular Poles for Overhead | 9 Mtrs GI Tubular Poles for Overhead | 1,100 | nos | ankit980 | 270 | |
| 4 | Tension Assembly Set | Tension Assembly Set | 1,168 | set | ankit980 | 270 | |
| 5 | Suspension Assembly Set | Suspension Assembly Set | 2,482 | set | ankit980 | 270 | |
| 6 | Demountable Pulley | Demountable Pulley | 100 | nos | ankit980 | 270 | |
| 7 | Adjustable Cable Storage Bracket | Adjustable Cable Storage Bracket | 365 | nos | ankit980 | 270 | |
| 8 | OFC Joint Enclosure | OFC Joint Enclosure | 55 | nos | ankit980 | 270 | |
| 9 | Erection of GI Tubular Poles alonwith Fixation of Accessories | Erection of GI Tubular Poles alonwith Fixation of Accessories | 3,650 | nos | ankit980 | 270 | |
| 10 | Laying of 12F ADSS Cable Overhead on the Poles | Laying of 12F ADSS Cable Overhead on the Poles | 108 | km | ankit980 | 270 | |
| 11 | Patch Cord | Patch Cord | 200 | nos | ankit980 | 270 | |
| 12 | Pigtail | Pigtail | 200 | nos | ankit980 | 270 | |
| 13 | OTDR | OTDR | 8 | nos | ankit980 | 270 | |
| 14 | Splicing Machine | Splicing Machine | 8 | nos | ankit980 | 270 | |
| 15 | Optical Power Meter | Optical Power Meter | 8 | nos | ankit980 | 270 | |
| 16 | Multiplexer STM 1 MUX with 120 Km SFP Module | Multiplexer STM 1 MUX with 120 Km SFP Module | 4 | nos | ankit980 | 270 | |
| 17 | Laying of GI Pipe 2 inch 50 mm Diameter | Laying of GI Pipe 2 inch 50 mm Diameter | 500 | mtrs | ankit980 | 270 | |
| 18 | Fiber Termination Box | Fiber Termination Box | 12 | nos | ankit980 | 270 | |
| 19 | ROW Charges | ROW Charges | 1 | job | ankit980 | 270 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Data Sheet of offered products uploaded
Experience certificates showing 3+ years govt/PSU supply
Contracts/PO copies for similar products to central/state govt
OEM authorization or CE from OEM for installation/commissioning
Bidders must register, upload the Data Sheet, and submit PAN, GSTIN, cancelled cheque, EFT mandate, and EMD ₹1,888,000. Ensure 3+ years government supply experience and OEM installation capability. Follow the 25% quantity variation clause and provide contracts from govt bodies as evidence.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by Bank, OEM authorization for installation, Data Sheet of offered products, and govt/PSU contract copies showing 3+ years of similar supply to demonstrate eligibility.
Key items include 12 Core ADSS Optical Fiber Cable, 7m and 9m GI Tubular Poles, Tension/Suspension Assemblies, Demountable Pulleys, ODCs, Patch Cords, Pigtails, OTDR, Splicing Machine, Optical Power Meter, and MUX STM-1 with 120 Km SFP Module; data sheets must align with offerings.
Delivery timing starts after the last delivery order date; quantity may vary by up to 25% with a calculated extra time: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; extended period allowed during contract currency.
Eligibility requires at least 3 years of regular govt/PSU supply in similar categories, primary product value meeting contract criteria, and evidence via contract copies; manufacturer or authorized reseller must demonstrate capabilities.
Bidders must determine applicable GST; CGDA will reimburse if rates are applicable and within the quoted GST percentage; the bidder bears responsibility for accurate GST computation.
Installation/commissioning/training, if any, must be performed by the OEM or OEM-authorized personnel; ensure data sheets and OEM certifications align with installation scope requested by CGDA.
EMD required is ₹1,888,000; submit via the specified secure payment method with bid submission, ensuring that the EMD is valid through bid opening and aligns with online/offline procurement norms.
Hindustan Aeronautics Limited (hal)
📍 BANGALORE, KARNATAKA
Indian Army
📍 KARGIL, JAMMU & KASHMIR
Indian Navy
📍 KHORDHA, ODISHA
Indian Navy
📍 MUMBAI, MAHARASHTRA
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
📍 GORAKHPUR, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS