Brake pad front,Brake pad rear,Suspension bush kit,Spider bearing,Pressure plate,Release bearing,Fr
Indian Army
BARAMULLA, JAMMU & KASHMIR
Bid Publish Date
13-Jun-2026, 7:34 pm
Bid End Date
23-Jun-2026, 8:00 pm
Location
Progress
Quantity
26
Category
Suspension Bush Kit
Bid Type
Two Packet Bid
Organization: Indian Army (Department Of Military Affairs) in Baramulla, Jammu & Kashmir 193101. Procures a wide range of automotive spares including Suspension Bush Kit, Bush Spring Shackle, Oil Seal, Wheel Bearing Rear, Release Bearing, ECM, Injector, Gear Leaver Assy, Steering Hose Pipe, Crown Wheel Bearing Set, Bearing for TATA, Vane Pump for ALS, Pump Over Hauling Kit Set, High Pressure Pipe, Water Pump, Fuel Filter Assy, Oil Filter, Brake Shoes Assembly, Rear Hand Brake Cable and related items. Tender includes 21 BOQ items and an option clause allowing up to 25% quantity variation with contracted rates; sampling requirement includes advance sample within 48 hours post-technical bid opening. GST rules apply per bidder’s status; MSE purchase preference is available to eligible manufacturers, with price-midelity conditions for price matching. This procurement emphasizes availability of various automotive sub-systems under a unified Tamil service context.
Product/service names: suspension bush kit, wheel bearing rear, fuel/oil filters, water pump, hand brake components, pump assemblies, vanes, and related automotive spares
Quantities: 21-item BOQ with unspecified unit quantities
Estimated value: Not disclosed
Experience: Prior supply of automotive spare parts to defense or government organizations preferred
Quality/standards: Not explicitly listed; bidders should reference standard automotive tolerances and OEM compatibility
Option clause permits +/-25% quantity change at contracted rates
Advance sample required within 48 hours after technical bid opening
GST payable by bidder; reimbursement per actuals or lower rate
MSE purchase preference available to eligible manufacturers
Bidders must provide undertaking on financial standing (no liquidation/bankruptcy)
GST handling and reimbursement rules; no specific upfront payment details disclosed
Delivery period starts after original last delivery order date; additional time computed by (increased quantity / original quantity) × original period with a minimum of 30 days
Not explicitly detailed in data; contract may include LDs as per standard government terms
Bidder must not be in liquidation or bankruptcy; provide an undertaking
Manufacturers may claim MSE preference with documentary evidence
GST registration active; meet financial and technical bid requirements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Suspension Bush Kit , Bush Spring Shackle , Oil Seal , Wheel Bearing Rear , Release Bearing , ECM , Injector , Big End Bearing Cell Set , Gear Leaver Assy , Steering Hose Pipe , Crown Wheel Bearing Set , Bearing for TATA , Vane Pump for ALS , Pump Over Hauling Kit Set , High Pressure Pipe , Water Pump , Fuel Filter Assy , Oil Filter , Brake Shoes Assy Rear , Hand Brake Cable
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
SRINAGAR, JAMMU & KASHMIR
Indian Army
BUDGAM, JAMMU & KASHMIR
Indian Army
Indian Army
AGRA, UTTAR PRADESH
Tender Results
Loading results...
Suspension Bush Kit
Suspension Bush Kit
Bush Spring Shackle
Bush Spring Shackle
Oil Seal
Oil Seal
Wheel Bearing Rear
Wheel Bearing Rear
Release Bearing
Release Bearing
ECM
ECM
Injector
Injector
Big End Bearing Cell Set
Big End Bearing Cell Set
Gear Leaver Assy
Gear Leaver Assy
Steering Hose Pipe
Steering Hose Pipe
Crown Wheel Bearing Set
Crown Wheel Bearing Set
Bearing for TATA
Bearing
Vane Pump for ALS
Vane Pump
Pump Over Hauling Kit Set
Pump Over Hauling Kit Set
High Pressure Pipe
High Pressure Pipe
Water Pump
Water Pump
Suspension Bush Kit
Suspension Bush Kit
Fuel Filter Assy
Fuel Filter Assy
Oil Filter
Oil Filter
Brake Shoes Assy Rear
Brake Shoes Assy Rear
Hand Brake Cable
Hand Brake Cable
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Suspension Bush Kit | Suspension Bush Kit | 2 | nos | buyerfy2021.220 | 15 | |
| 2 | Bush Spring Shackle | Bush Spring Shackle | 2 | nos | buyerfy2021.220 | 15 | |
| 3 | Oil Seal | Oil Seal | 1 | nos | buyerfy2021.220 | 15 | |
| 4 | Wheel Bearing Rear | Wheel Bearing Rear | 1 | nos | buyerfy2021.220 | 15 | |
| 5 | Release Bearing | Release Bearing | 1 | nos | buyerfy2021.220 | 15 | |
| 6 | ECM | ECM | 1 | nos | buyerfy2021.220 | 15 | |
| 7 | Injector | Injector | 4 | nos | buyerfy2021.220 | 15 | |
| 8 | Big End Bearing Cell Set | Big End Bearing Cell Set | 1 | nos | buyerfy2021.220 | 15 | |
| 9 | Gear Leaver Assy | Gear Leaver Assy | 1 | nos | buyerfy2021.220 | 15 | |
| 10 | Steering Hose Pipe | Steering Hose Pipe | 1 | nos | buyerfy2021.220 | 15 | |
| 11 | Crown Wheel Bearing Set | Crown Wheel Bearing Set | 1 | nos | buyerfy2021.220 | 15 | |
| 12 | Bearing for TATA | Bearing | 1 | nos | buyerfy2021.220 | 15 | |
| 13 | Vane Pump for ALS | Vane Pump | 1 | nos | buyerfy2021.220 | 15 | |
| 14 | Pump Over Hauling Kit Set | Pump Over Hauling Kit Set | 1 | nos | buyerfy2021.220 | 15 | |
| 15 | High Pressure Pipe | High Pressure Pipe | 1 | nos | buyerfy2021.220 | 15 | |
| 16 | Water Pump | Water Pump | 1 | nos | buyerfy2021.220 | 15 | |
| 17 | Suspension Bush Kit | Suspension Bush Kit | 1 | nos | buyerfy2021.220 | 15 | |
| 18 | Fuel Filter Assy | Fuel Filter Assy | 1 | nos | buyerfy2021.220 | 15 | |
| 19 | Oil Filter | Oil Filter | 1 | nos | buyerfy2021.220 | 15 | |
| 20 | Brake Shoes Assy Rear | Brake Shoes Assy Rear | 1 | nos | buyerfy2021.220 | 15 | |
| 21 | Hand Brake Cable | Hand Brake Cable | 1 | nos | buyerfy2021.220 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar automotive spare parts supply
Financial statements to demonstrate financial standing
EMD/Security deposit documentation (as applicable by purchaser)
Technical bid documents showing compliance (advance sample plan, manufacturing capability)
OEM authorization or Manufacturer proof if claiming MSE preference
Any prior contractual performance certificates
Key insights about JAMMU AND KASHMIR tender market
Bidders must register, submit GST, PAN, and financial documents, provide advance samples within 48 hours of technical bid opening, and demonstrate manufacturing capability for 21 listed items. Ensure eligibility for MSE preference if applicable and comply with the 25% quantity variation clause. Include OEM authorizations where required.
Submit GST certificate, PAN card, experience certificates for similar defense spares, financial statements, EMD/Security deposit, technical bid with advance sample plan, OEM authorizations if claiming manufacturer status, and any prior performance certificates. Ensure all documents align with terms and conditions.
Delivery starts after the original delivery order date; quantity may increase by up to 25% with proportional time extension, minimum 30 days. Extended delivery duration may be applied; bidders should plan to meet original plus possible added orders without delay.
Tender data does not list explicit IS/IEC standards; bidders should ensure OEM compatibility and refer to any standard defense procurement guidelines. If claiming MSE preferences, provide documentary evidence per policy and verify item-specific compliance with other supplier requirements.
At least one quantity of every contracted item must be provided as an advance sample within 48 hours after technical bid opening. Failure to provide samples may lead to bid rejection; ensure logistics and approvals are ready for rapid sample submission.
Bidders must determine applicable GST; the purchaser will reimburse as actuals or the lower of applicable rates, not exceeding the quoted GST percentage. Include GST details in the bid and ensure compliance with local tax regulations.
Manufacturers may receive MSE preference if eligible under the policy; traders are excluded. Submit documentary evidence showing status as a manufacturer and qualification to qualify under MSE orders for the 20% contract share to eligible bidders.
If quantity changes by up to 25%, the delivery period adjusts proportionally using (increased quantity / original quantity) × original delivery period, with a minimum of 30 days. The buyer can extend delivery time within contract norms while exercising the option.
Indian Army
📍 LEH, JAMMU & KASHMIR
Indian Army
📍 LEH, JAMMU & KASHMIR
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Border Security Force (bsf)
📍 EAST KHASI HILLS, MEGHALAYA
Indian Army
📍 PUNE, MAHARASHTRA
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS