Brake booster,Spool valve,Wiper blade,Wiper motor,Steering gear box,Hand brake assy,Engine mtg pad
Indian Army
SOUTH WEST DELHI, DELHI
Bid Publish Date
15-Jul-2026, 9:25 am
Bid End Date
25-Jul-2026, 10:00 am
Location
Progress
Quantity
8
Category
MIRROR ASSY
Bid Type
Two Packet Bid
The Indian Army (Department Of Military Affairs) seeks supply, installation, testing, commissioning of vehicle spare parts and related training. Items span MIRROR ASSY, BRAKE PAD, BONNET CABLE, CARBURATOR, CHAIN SPROCKET SET, REAR BRAKE SHOE, and CLUTCH BOOSTER, across 7 items in the BOQ. The contract includes complete scope from procurement to statutory clearances where applicable, with delivery conditions tied to original and extended periods. The bidder must address vendor code creation requirements including PAN, GST, cancelled cheque, and EFT mandate, as part of pre-award documentation. The buyer reserves the right to adjust quantities by up to 25% at contract placement and during the currency of the contract, with delivery time recalculated accordingly, minimum 30 days. The scope emphasizes end-to-end implementation (SITC) and operator training to ensure operational readiness.
Product categories: MIRROR ASSEMBLY, BRAKE PAD, BONNET CABLE, CARBURATOR, CHAIN SPROCKET SET, REAR BRAKE SHOE, CLUTCH BOOSTER
Scope: Supply, Installation, Testing, Commissioning (SITC) and operator training
Delivery flexibility: quantity may increase by up to 25% at contract and during currency
Delivery timeline: minimum extension time 30 days when quantity increases; extension calculations based on (Increased quantity ÷ Original quantity) × Original delivery period
Documentation: PAN, GST, cancelled cheque, EFT mandate; turnover evidence for bidder and OEM
Option Clause allows up to 25% quantity increase at contract and during currency
SITC scope includes training and any statutory clearances if required
Bidder and OEM turnover data required for last three financial years
Not explicitly stated in available data; refer to detailed Terms document for EMD, payment milestones, and penalties
Delivery starts from the last date of the original delivery order; extended delivery time applies with minimum 30 days; quantity increases trigger recalculated timelines
Not specified in current data; check buyer terms for LD rates and performance bonds
Must satisfy bidder turnover criteria for last three financial years
Must provide OEM turnover data as required
Must submit PAN, GST, bank EFT mandate, and cancelled cheque with bid
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
MIRROR ASSY , BRAKE PAD , BONNET CABLE , CARBURATOR , CHAIN SPROCKET SET , REAR BRAKE SHOE , CLUTCH BOOSTER
Pre-Bid Date
23-07-2026 09:00:00
Pre-Bid Venue
ADRESS: 7001 EME BN (266 FD WKSP COY), MATHURA (UP)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
MATHURA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | MATHURA | MATHURA | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
SOUTH WEST DELHI, DELHI
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
ANANTHNAG, JAMMU & KASHMIR
Indian Army
KAMRUP, ASSAM
Indian Army
KANGRA, HIMACHAL PRADESH
Tender Results
Loading results...
MIRROR ASSY
MIRROR ASSY
BRAKE PAD
BRAKE PAD
BONNET CABLE
BONNET CABLE
CARBURATOR
CARBURATOR
CHAIN SPROCKET SET
CHAIN SPROCKET SET
REAR BRAKE SHOE
REAR BRAKE SHOE
CLUTCH BOOSTER
CLUTCH BOOSTER
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | MIRROR ASSY | MIRROR ASSY | 1 | nos | moregem | 15 | |
| 2 | BRAKE PAD | BRAKE PAD | 2 | nos | moregem | 15 | |
| 3 | BONNET CABLE | BONNET CABLE | 1 | nos | moregem | 15 | |
| 4 | CARBURATOR | CARBURATOR | 1 | nos | moregem | 15 | |
| 5 | CHAIN SPROCKET SET | CHAIN SPROCKET SET | 1 | nos | moregem | 15 | |
| 6 | REAR BRAKE SHOE | REAR BRAKE SHOE | 1 | nos | moregem | 15 | |
| 7 | CLUTCH BOOSTER | CLUTCH BOOSTER | 1 | nos | moregem | 15 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by Bank
Audited Balance Sheets for last 3 years or CA/ Cost Accountant turnover certificate
OEM authorization/certification (if applicable)
Documentation evidencing turnover for bidder and OEM
Any bidder/vendor code creation documents required by the buyer
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate along with turnover certificates for bidder and OEM for the last three financial years. The scope includes SITC and operator training; quantites may vary up to 25%. Review the tender terms for delivery timelines and payment terms.
Submit PAN Card, GSTIN, cancelled cheque, and EFT Mandate certified by bank. Also provide turnover evidence for bidder and OEM as per turnover criteria; ensure all documents are uploaded with the bid to satisfy eligibility and prevent rejection.
The buyer may increase quantity up to 25% at contract and during the currency. Delivery period extends using: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; if original is less than 30 days, use the original period.
The procurement covers MIRROR ASSEMBLY, BRAKE PAD, BONNET CABLE, CARBURATOR, CHAIN SPROCKET SET, REAR BRAKE SHOE, and CLUTCH BOOSTER. The contract requires SITC and operator training, plus any necessary statutory clearances.
Bidders must show minimum average annual turnover for the last three financial years, with certified audited balance sheets or CA/Cost Accountant certificates. If newly established, use completed years post-incorporation for turnover calculations.
No explicit product-specific IS/ISO standards are listed in the available data. Vendors should verify if the buyer requires OEM certifications or approvals and ensure documentation supports compliance during bid submission.
Scope includes Supply, Installation, Testing, Commissioning of GOODS and Training of operators, with any required statutory clearances. The bidding price must cover all costs for SITC and training without hidden charges.
Any up to 25% quantity adjustment will trigger revised delivery timelines based on the proportionate extension rule. Ensure plan and schedule alignment with the extended delivery period to avoid penalties or contract risk.
Indian Army
📍 RAJAURI, JAMMU & KASHMIR
Indian Army
📍 NASHIK, MAHARASHTRA
Indian Army
📍 EAST SIKKIM, SIKKIM
Indian Army
📍 SONITPUR, ASSAM
Armed Forces Tribunal
📍 BARAMULLA, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS