1600290676 - Design Manufacture Supply Supervision of Erection and Commissioning of Single Deck Hea
Nmdc Limited
DANTEWADA, CHHATTISGARH
Bid Publish Date
10-Jun-2026, 10:11 am
Bid End Date
23-Jun-2026, 4:00 pm
Location
Progress
Quantity
4
Category
1600031084 Manufacture, Supply and Supervision of installation and commissioning of Double Deck Heav
Bid Type
Two Packet Bid
NMDC Limited invites bids for the manufacture, supply and supervision of installation and commissioning of Double Deck Heavy equipment along with initial spares in India. The scope covers fabrication, supply, on-site erection and commissioning, with no BOQ items published. The project value, item quantities, and delivery timelines are tied to the contract’s option clauses allowing up to 25% quantity variation during execution. The procurement emphasizes adherence to Purchaser ATC terms and conditions and requires strict supplier compliance to contract delivery mechanics. The opportunity targets established steel and heavy equipment suppliers capable of integrated project support, including erection supervision and post-installation spares provisioning.
Product name: Double Deck Heavy equipment (manufacture, supply, install, commission)
Scope: Turnkey with erection supervision and commissioning
Standards/certifications: To be specified in ATC; ensure compliance with relevant Indian procurement standards
Delivery: From date of last delivery order with option-based extensions
Warranty/AMC: To be confirmed in ATC; bidders should verify post-installation service terms
Documentation: Submission aligned with ATC document requirements
Up to 25% quantity variation permitted during contract and currency
Delivery extensions calculated as (increased quantity ÷ original quantity) × original period
Minimum extension threshold of 30 days unless original period exceeds this
Bidder must comply with Buyer Uploaded ATC terms for specifications
Payment terms to be defined in ATC; bidders must review for milestones and security deposits
Delivery begins from last delivery order date; option quantities may extend delivery period
LDs, if any, to be specified in ATC; ensure compliance with project timelines
Experience in manufacture, supply, installation and commissioning of heavy equipment
Financial capacity to handle large turnkey projects
Ability to comply with ATC and option clause terms
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
1600031084 Manufacture, Supply and Supervision of installation and commissioning of Double Deck Heav , 1600849692 Initial Spares
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Nmdc Limited
DANTEWADA, CHHATTISGARH
Nmdc Limited
DANTEWADA, CHHATTISGARH
Nmdc Limited
DANTEWADA, CHHATTISGARH
Nmdc Limited
DANTEWADA, CHHATTISGARH
Ntpc Limited
NALANDA, BIHAR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar projects
Financial statements or evidence of financial capacity
EMD/Security deposit documentation as per ATC
Technical bid documents and OEM authorizations (if required)
Any specific Bid Compliance Certificates required by ATC
Bidders should review the ATC documents issued by NMDC Limited, prepare technical and financial bids, and submit GST, PAN, experience certificates, financial statements, and EMD as required. Ensure compliance with the option clause allowing ±25% quantity variation and calculate extension timelines per formula in the ATC.
Required documents typically include GST registration, PAN, experience certificates for similar turnkey projects, financial statements, EMD security, technical bid documents, OEM authorizations if required, and any ATC-specified certifications. Align submission with the Buyer Uploaded ATC terms.
Delivery starts from the last delivery order date; quantity variations up to 25% are allowed. If extended, the additional time equals (increased/original quantity) × original period, with a minimum of 30 days. Ensure timely execution to avoid penalties per ATC.
Standards are defined in the ATC documents; bidders must achieve compliance with relevant Indian procurement standards and any OEM authorizations specified. Confirm ISI/ISO requirements if mentioned in ATC and ensure technical compliance in the bid.
EMD submission is required as per ATC; exact amount is not disclosed in the public data. Prepare the bid security in the prescribed format and currency, ensuring the security remains valid through bid evaluation.
Scope includes on-site erection supervision and commissioning of the Double Deck Heavy equipment, integrated with existing facilities. The ATC defines the exact commissioning criteria, acceptance tests, and warranty/AMC expectations to be met post-installation.
Check eligibility by confirming prior experience in heavy equipment turnkey projects, financial capability, and compliance with ATC terms. Ensure the OEM authorizations (if required) and submission of all mandatory documents listed in the ATC.
Nmdc Limited
📍 DANTEWADA, CHHATTISGARH
Nmdc Limited
📍 DANTEWADA, CHHATTISGARH
South Eastern Coalfields Limited
📍 KORBA, CHHATTISGARH
National Aluminium Company Limited, Bhubaneswar
📍 KORAPUT, ODISHA
Ntpc Limited
📍 ANGUL, ODISHA
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS