Forklifts (V2) as per IS 6765:2003 and IS 10517
West Central Railway
Bid Publish Date
03-Jun-2026, 7:23 am
Bid End Date
15-Jun-2026, 10:00 am
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
Organization: South East Central Railway. Product: Forklifts (V2) conforming to IS 6765:2003 and IS 10517 (Q2). Scope: Supply, Installation, Testing and Commissioning of forklifts; warranty coverage with 30 months from supply; authorized OEM authorization required; delivery to SSSE/TRS/BIA premises; inspection by RITES pre-dispatch or consignee site post-receipt. Quantity flexibility: 25% up/down at contract stage; extended delivery time calculated with a minimum 30 days. No BOQ items listed. ATC clauses mandate OEM authentication and compliance with attached technical specifications. Location: SECR jurisdiction in India. This tender emphasizes compliance, authorized sourcing, and post-warranty support considerations.
Forklift category: V2 as per IS 6765:2003 and IS 10517 (Q2)
Key specs: Operating mode, Battery type, Tonnage capacity, Standard load centre distance
Drive/transmission: Type of drive and transmission details (not specified by model)
Construction data: Max engine HP, Max engine torque, Tyre type
Lift height: specified in metres per model
Warranty: 30 months from supply; EMD not disclosed; 5% warranty coverage through EPG
OEM authorization required from original equipment manufacturer with full contact details
Delivery terms allow 25% quantity variation and extended delivery period with minimum 30 days
Post-delivery inspection can be conducted by RITES pre-dispatch or consignee post-receipt
5% EPG to cover warranty; terms not detailed beyond this in data
Option clause permits up to 25% quantity variation; delivery period tied to original and extended periods with a 30-day minimum
Not explicitly provided; ATC implies standard procurement penalties may apply per IRS terms
Authorized OEM authorization present and verifiable
Experience in forklift supply/installation and IS-compliant models
Financial stability evidenced by financial statements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Forklifts (V2) as per IS 6765:2003 and IS 10517 (Q2)
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
West Central Railway
Eastern Railway
South East Central Railway
Chittaranjan Locomotive Works
BARDHAMAN, WEST BENGAL
Southern Railway
MADURAI, TAMIL NADU
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Operating Mode | Diesel Engine Operated |
| GENERIC | Battery Type | NA |
| GENERIC | Tonnage Capacity (ton) | 3 |
| GENERIC | Standard Load Centre Distance | DH/DV for Forklift up to 4000 Kg 500/500mm |
| GENERIC | Transmission | Automatic |
| GENERIC | Type of Drive | Single(two tyres in the front) |
| CONSTRUCTIONAL | Max Engine HP Range at Rated RPM (hp) | <=50, >50 |
| CONSTRUCTIONAL | Max Engine Torque at Rated RPM (Nm) | <200, >=200 |
| CONSTRUCTIONAL | Tyre Type | Solid |
| Dimensions | Lift Height (metres) | 4 to 4.5 meters |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for forklift supply/installation
Financial statements (balance sheet and P&L)
EMD submission proof (amount not disclosed in tender, bidders should validate)
Technical bid documents demonstrating IS 6765:2003 and IS 10517 compliance
OEM authorization certificate on company letterhead with signatory details
Compliance against Buyer Added ATC clauses
Bidders must provide OEM authorization on company letterhead, IS 6765:2003 and IS 10517 (Q2) compliance, GST, PAN, experience certificates, and financial statements. Include 5% EPG for warranty and ensure installation, testing, and commissioning are included in the bid.
Required documents include GST certificate, PAN, experience certificates, financial statements, OEM authorization, technical compliance against ATC, and EMD submission proof. Ensure pre-dispatch inspection alignment with RITES if applicable.
Forklifts must comply with IS 6765:2003 for V2 category and IS 10517 (Q2) specifications; ensure battery type, load center distance, and drive type meet these standards as per BOQ/ATC references.
Warranty period is 30 months from the date of supply per IRS; 5% EPG payable to cover warranty obligations; ensure post-warranty support terms are defined in the contract.
Delivery timelines are governed by the option clause permitting up to 25% quantity variation with a calculated extended delivery period; minimum extension is 30 days from original delivery timeframe.
Scope includes Supply, Installation, Testing and Commissioning of forklift units; pre-dispatch inspection by RITES or post-receipt at consignee site per ATC; OEM authorization is mandatory.
Submit OEM authorization on company letterhead with full name, designation, active email, and mobile number of signatory; company stamp required; SECR may authenticate authorization before bid acceptance.
Material to be delivered to SSSE/TRS/BIA with contact mobile 9752598446; installation and commissioning are included in scope per ATC.
Indian Space Research Organization
📍 THIRUVANANTHAPURAM, KERALA
Troop Comforts Limited
📍 SHAHJAHANPUR, UTTAR PRADESH
Oil India Limited
📍 DIBRUGARH, ASSAM
Indian Army
📍 MEERUT, UTTAR PRADESH
South Eastern Railway
📍 HOWRAH, WEST BENGAL
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS