hose performed,cover air compressor,steering pump,brush carrier assy,light back up
Indian Army
LEH, JAMMU & KASHMIR
Bid Publish Date
17-Jul-2026, 8:14 pm
Bid End Date
28-Jul-2026, 9:00 am
Location
Progress
Quantity
6
Category
COVER ASSY
Bid Type
Two Packet Bid
Organization: Indian Army, Department of Military Affairs. Location: Baramulla, Jammu & Kashmir 193101. Category: Cover Assembly, Hose, Power Steering Pump, Pump Housing, Hose. Procurement scope covers five items in the BOQ with unspecified quantities. Estimated value and EMD: Not disclosed in the data. Interest lies in standard procurement terms, option clause, GST handling guidance, and MSE reservation rules. The tender emphasizes online credential validation for MSEs and purchase preferences for manufacturers under the MSE policy, with a mechanism to match L-1 within 15% and allocate 30% of total value accordingly. A pivotal differentiator is the option clause enabling up to 25% quantity variation at contract award or during currency, with delivery extensions calculated via a formula and subject to minimum 30 days.
Product/service names: Cover Assembly, Hose, Power Steering Pump, Pump Housing, Hose (category-based).
Quantities: Five items in BOQ; exact numbers not disclosed in the data.
Estimated value: Not disclosed.
Experience: Not explicitly stated; procurement emphasizes manufacturer eligibility for MSE preference.
Quality/standards: No explicit standards listed in the provided data.
Delivery: Option clause allows up to 25% quantity variation; minimum delivery extension of 30 days.
Warranty/AMC: Not specified in the provided tender data.
Option clause permits +/- 25% quantity adjustment at contract award and during currency.
MSE-based purchase preference for eligible manufacturers with online validation.
GST handling is bidder-borne with reimbursement as per actuals or applicable rate (lower) within quoted GST.
Delivery timelines adjustable via formula; minimum extension 30 days.
Documentation requires GST, PAN, experience, financials, EMD, OEM authorizations, and online MSE validation.
GST handling optional reimbursement; payment terms tied to contract; exact percentages not specified.
Delivery period begins from last date of original delivery order; extension rules apply with minimum 30 days.
Not specified in the provided data.
Manufacturer status for MSE preference (or eligibility under MSE policy with documentary evidence)
Not under liquidation, court receivership, or bankruptcy
Ability to comply with GST adjustments and online Udyog Aadhaar/URC validation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
COVER ASSY , HOSE PERFORMED , POWER STEERING PUMP , PUMP HOUSING , HOSE
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Baramulla
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Baramulla | Baramulla | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
Samba, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
UDHAMPUR, JAMMU & KASHMIR
Tender Results
Loading results...
COVER ASSY
STLN
HOSE PERFORMED
STLN
POWER STEERING PUMP
STLN
PUMP HOUSING
STLN
HOSE
STLN
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | COVER ASSY | STLN | 1 | nos | 822buyer9 | 15 | |
| 2 | HOSE PERFORMED | STLN | 2 | nos | 822buyer9 | 15 | |
| 3 | POWER STEERING PUMP | STLN | 1 | nos | 822buyer9 | 15 | |
| 4 | PUMP HOUSING | STLN | 1 | nos | 822buyer9 | 15 | |
| 5 | HOSE | STLN | 1 | nos | 822buyer9 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates (similar prior supply)
Financial statements (audited, if available)
EMD documentation (amount not specified in data; bidders must provide per tender terms)
Technical bid documents
OEM authorizations / manufacturer certifications
Udyog Aadhaar/URC registration proof for MSE reservation
Undertakings on financial standing (no liquidation or court receivership)
Key insights about JAMMU AND KASHMIR tender market
Bidders should submit GST registration, PAN, experience certificates, financial statements, EMD, and OEM authorizations. Ensure online Udyog Aadhaar/URC validation for MSE preference; adhere to the option clause for quantity variation up to 25% and minimum 30 days delivery extension. Include technical bid documents and proof of non-liquidation status.
Required documents include GST certificate, PAN card, experience certificates for similar supply, audited financial statements, EMD documentation, technical bid, OEM authorization, and online MSE validation proof. Upload undertaking on financial standing and ensure bid complies with GST and MSE policy rules.
Delivery starts from the last date of the original delivery order. If quantities increase by up to 25%, the extended delivery period follows the formula (increased/original) × original delivery days, with a minimum 30-day extension; the purchaser may further extend to the original delivery period.
MSE eligibility requires the bidder to be the product manufacturer and validated online via Udyog Aadhaar/URC for the specific product category; traders are excluded from MSE benefits. L-1 can be matched by MSE within 15% of the price band for 30% of the contract value.
Bidder bears GST calculations; reimbursement is based on actuals or applicable rate, whichever is lower, limited to the quoted GST percentage. Ensure GST compliance and include supporting GST documentation with the bid submission.
BOQ lists five items: Cover Assembly, Hose, Power Steering Pump, Pump Housing, and Hose set; however, exact quantities and unit descriptions are not provided in the data. Prepare to reference OEM specifications and supply evidence for these components.
Quantity variation up to 25% is permitted at the time of contract and during currency. The additional delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days, and may extend up to the original delivery period.
The data provided does not specify a closing date. Bidders should monitor the tender portal for updates, ensure submission of all specified documents, and comply with the option and MSE reservation clauses to avoid disqualification.
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 JHANSI, UTTAR PRADESH
Indian Army
📍 BHOPAL, MADHYA PRADESH
Indian Army
📍 SAGAR, MADHYA PRADESH
Indian Army
📍 BIKANER, RAJASTHAN
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS