Line Interactive UPS with AVR (V2)
Hqids
NORTH AND MIDDLE ANDAMAN, ANDAMAN & NICOBAR
Bid Publish Date
29-Nov-2025, 12:57 pm
Bid End Date
09-Dec-2025, 1:00 pm
Location
Progress
Quantity
8
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, located in Jhansi, Uttar Pradesh 284001, seeks procurement of a Line Interactive UPS with AVR (V2). The tender emphasizes a UPS system with AVR regulation, defined by Rating (KVA) and Inverter Efficiency metrics, plus a minimum backup time and warranty terms. Key differentiators include mandatory AVR performance, battery location specifications, and warranty coverage for both the UPS and battery from delivery. The opportunity is described under a generic category with no BOQ items, signaling a focused hardware supply requirement for critical power protection. The scope hinges on meeting specified electrical performance and longevity criteria within the Army’s operational environment, with a flexible quantity clause up to 25% and extended delivery as per option terms.
Line Interactive UPS with AVR capability
Defined KVA rating and inverter efficiency
Minimum guaranteed back-up time in minutes
Warranty terms for UPS and battery from delivery
Rated output voltage with THD specification
AVR output regulation limits in AC mode
Battery location specification and OEM/brand requirements (if any)
Quantity may be increased or decreased by up to 25% at contract formation and during currency
Delivery period starts from last date of original delivery order; minimum 30 days extension
Bidder must submit complete documentation including GST, PAN, experience, financials, and OEM authorizations
Delivery-based payment with terms aligned to Army procurement; no explicit percentages noted in data
Delivery period linked to original order date; extended period calculated per option clause with minimum 30 days
Not detailed in data; implied via delivery extension terms under option clause
Experience in supplying Line Interactive UPS with AVR
Ability to meet battery warranty and location requirements
Demonstrated financial capacity via audited statements
Hqids
NORTH AND MIDDLE ANDAMAN, ANDAMAN & NICOBAR
N/a
SUNDERGARH, ODISHA
South East Central Railway
BILASPUR, CHHATTISGARH
Indian Coast Guard
MUMBAI, MAHARASHTRA
Eastern Railway
KOLKATA, WEST BENGAL
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Rating (in KVA) | 0.65, 0.8, 1.0, 1.5, 2.0, 0.6, 3 Or higher |
| GENERIC | Technology | MOSFET-PWM |
| GENERIC | Inverter Efficiency (%) | 60% or better, 70% or better Or higher |
| GENERIC | Minimum Guaranteed Battery Backup time (Minutes) on Full Load | 15, 30, 60, 90, 120, 180, 240 Or higher |
| GENERIC | Warranty for Line Interactive UPS | 2 Years, 3 Years, 4 Years, 5 Years Or higher |
| Battery/Backup Bank | Location of Battery | Inside the Enclosure of UPS |
| Battery/Backup Bank | Warranty for the battery from the date of delivery | 2 Years Or higher |
| FEATURES | Rated Output (Volt) with Total Harmonic Distortion (%) | Single Phase Quasi Sinewave 230 V AC 50 Hz with Total Harmonic Distortion as <=40%, Single Phase Sinewave 230v AC 50Hz with Total Harmonic Distortion as <3% Or higher |
| FEATURES | Variation in AVR output in AC mode (AVR Voltage regulation) | 230 Volts +/-9%, 230 Volts +/-15% |
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience Certificates for similar UPS supply
Financial Statements (latest audited)
EMD/Security Deposit documents as applicable
Technical Bid Document demonstrating AVR Line Interactive UPS specs
OEM Authorizations (if bidding as authorized dealer)
Product data sheets confirming battery location and warranty terms
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD along with technical compliance documents showing AVR capability. Ensure the UPS meets rated KVA, inverter efficiency, backup time, and warranty requirements; address 25% quantity variation and delivery extensions per option clause.
Required documents include GST certificate, PAN card, audited financial statements, experience certificates for similar UPS projects, EMD documents, OEM authorizations if applicable, and technical data sheets highlighting AVR, THD, battery location, and warranty terms.
Technical specs mandate AVR regulation in AC mode, Line Interactive topology, defined KVA rating, inverter efficiency, and Rated Output (Volt) with THD. Also, specify battery location and warranty durations for UPS and battery from delivery.
Delivery schedule is governed by the original delivery order date with option-based extensions. If quantity increases, additional time = (increased/original quantity) × original delivery period, minimum 30 days, ensuring phased commissioning as per Army norms.
Payment terms depend on the option clause; quantities can vary by up to 25%, with delivery timelines adjusted accordingly. Specifics like advance or milestone payments are not detailed; bidders should seek confirmation during bid clarification.
Eligibility requires prior experience in supplying similar UPS systems with AVR, valid GST and PAN, financial stability, and OEM authorization where applicable. Bidders must demonstrate the ability to meet warranty obligations for both UPS and battery.
Directorate Of Purchase And Stores
📍 MUMBAI, MAHARASHTRA
Directorate Of Technical Education And Training
📍 BANKURA, WEST BENGAL
Indian Air Force
Access all tender documents at no cost
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS