South Central Railway Line Interactive UPS with AVR (V2) Tender India 2025 - OEM Authorized UPS Procurement
South Central Railway
HYDERABAD, TELANGANA
Bid Publish Date
28-Nov-2025, 5:27 pm
Bid End Date
11-Dec-2025, 2:00 pm
Progress
Quantity
15
Bid Type
Single Packet Bid
The Directorate Of Purchase And Stores on behalf of the Department Of Atomic Energy invites bids for the supply of a Line Interactive UPS with AVR (V2). The scope is strictly Supply of Goods with no return of service. The bid specifies a 2-year warranty from final acceptance or after installation/commissioning, with OEM warranty certificates required at delivery. Delivery is to the EHPPL Stores, Nevali Phata- Pipeline, Kalyan (East), with named contact points for scheduling. The contract emphasizes post-award installation and after-sales capability within India, demanding a structured service network and on-site support readiness. The ATC clarifies delivery timing windows and GPS restrictions on supplier vehicles, plus a Hindrance Register process for date re-fixation if delays occur.
Product/service names: Line Interactive UPS with AVR (V2)
Estimated value: Not specified
Delivery location: EHPPL Stores, Nevali Phata- Pipeline, Kalyan East
Warranty: 2 years from final acceptance or post-installation (whichever is earlier)
Quality/standards: OEM warranty certificates required; service network in INDIA; installation/commissioning if included
Delivery timing constraints: 1100-1245 HRS delivery window; 1400-1700 HRS dispatch window on Mon-Fri
Logistics: GPS-free vehicles allowed; advance delivery intimation via email
Inspection: Post-supply inspection not permitted
Invoice: URP option for inland invoicing due to non-GST status
Hindrance: Mandatory Hindrance Register for extension considerations
2-year warranty with OEM certificates due at delivery
Delivery windows: 1100-1245 for receipt, 1400-1700 for dispatch
GPS-free vehicle entry; advance email delivery notice required
URP invoicing option due to non-GST status; Hindrance Register for extensions
URP invoicing option may be used; exact payment terms not specified in the available data
Material receipt between 1100-1245 HRS; dispatch between 1400-1700 HRS on Monday to Friday; advance email notification required
Hindrance Register mandatory for potential delivery-date re-fixation; post-supply inspection not permitted
Experience in supplying Line Interactive UPS with AVR or similar electrical power backup systems
Presence of India-based installation, commissioning, training, and after-sales service group
Ability to provide local service centers near consignee destinations and timely after-sales support
South Central Railway
HYDERABAD, TELANGANA
Indian Coast Guard
MUMBAI, MAHARASHTRA
Eastern Railway
KOLKATA, WEST BENGAL
Indian Air Force
WEST DELHI, DELHI
Indian Army
LUCKNOW, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates showing prior supply of UPS or similar electrical equipment
Financial statements or turnover details
EMD documentation (if applicable per procurement rules)
OEM authorization letter confirming line-interactive UPS with AVR (V2) supply
Technical compliance certificates and installation/maintenance service capabilities
Details of service centers near consignee destinations
Bidders should prepare OEM authorization, confirm capability for nationwide after-sales service, and submit OEM certificates at delivery. Include GST/URP invoicing readiness, comply with delivery windows 1100-1245 receipt and 1400-1700 dispatch, and provide detailed installation/commissioning plan if included.
Required documents include GST registration, PAN, experience certificates for UPS supply, financial statements, EMD documents if applicable, OEM authorization for line-interactive UPS with AVR, installation/maintenance capabilities, and service-center details near consignee locations.
The contract demands a 2-year warranty from final acceptance or after installation, with OEM warranty certificates provided at delivery. The supplier must sustain rectification of any breakdown within the warranty period and maintain a service network across India.
Delivery must be received between 1100 and 1245 HRS and dispatched between 1400 and 1700 HRS Monday to Friday. Suppliers must give advance email intimation before delivery and ensure GPS-free entry as per ATC.
Due to non-GST status, invoices may be raised via URP. Exact payment terms are not stated; bidders should prepare for possible inland invoicing mechanisms and ensure all required fiscal documentation accompanies bids.
If installation is within scope, the bidder must provide installation, commissioning, and training with a proven Indian service network. OEM warranty support and post-installation service centre availability near consignee locations are mandatory.
National Bank For Agriculture And Ruraldevelopment
📍 KHORDHA, ODISHA
N/a
📍 NEW DELHI, DELHI
N/a
📍 MAHASAMUND, CHHATTISGARH
Indian Air Force
📍 CHANDIGARH, CHANDIGARH
South Central Railway
Access all tender documents at no cost
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS