TenderDekho Logo
GEM

Bharat Petroleum Corporation Ltd Group A-L/L Transportation & Supply Tender 2026 India

Bid Publish Date

26-Jun-2026, 5:22 pm

Bid End Date

20-Jul-2026, 12:00 pm

Generate Docs

Progress

Issue26-Jun-2026, 5:22 pm
Corrigendum10-Jul-2026
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

26

Category

Supply for Group A

Bid Type

Two Packet Bid

Key Highlights

  • BPCL procurement covering multiple groups (A–M) for supply and transportation
  • GeM RFQ integration with BPCL‑specific option clause allowing 25% quantity variation
  • Inspection criteria to be defined in the RFQ/RoR documents
  • No explicit technical standards disclosed in available data
  • Integrated 26-item BOQ with unspecified unit quantities
  • Delivery extension mechanics with minimum 30-day additional period
  • Conflicts resolved in favor of RFQ documents on GeM platform

Categories 1

Tender Overview

Bharat Petroleum Corporation Ltd invites bids for multi-category supply and transportation services spanning Groups A to M. The BOQ lists 26 items, though item-level quantities are not disclosed. The scope includes both supply and transport services under a single tender framework, with procurement governed by GeM terms and BPCL-specific option clauses. The contract contemplates quantity adjustments up to 25%, with additional time calculated by a defined formula and a minimum extension of 30 days. Location details are not specified in the data provided, requiring bidders to align with BPCL’s regional deployment plans. A key differentiator is the integrated approach to supply and logistics across numerous groups, accompanied by supplier inspection as per RFQ provisions.

Technical Specifications & Requirements

  • Total Items: 26 (BOQ indicates 26 items; no item-wise specifications available)
  • Item details: Not disclosed in the provided data; no individual quantities or unit measures specified
  • Tender framework: GeM-based RFQ with BPCL‑specific terms; inspection as per RFQ documents
  • Delivery & options: Quantity increase/decrease up to 25%; delivery period and extension mechanics defined by the option clause; minimum extension of 30 days if extended
  • Quality/standards: No explicit standards mentioned in the data; inspection will follow RFQ provisions; vendor compliance will be verified on RFQ terms

Terms, Conditions & Eligibility

  • Option Clause: BPCL reserves right to modify quantity by up to 25% during contract; extended delivery time determined by (additional quantity/original quantity) × original delivery period, min 30 days
  • Delivery timeline: Based on last date of original delivery order and extended periods; specifics not provided
  • Inspection: Conducted as per RFQ document; GeM portal terms prevail in case of conflict
  • Compliance: Bidders must adhere to RFQ terms uploaded on GeM; other GTC terms apply

Key Specifications

  • Total BOQ items: 26

  • No itemized quantities available in data

  • Inspection to be conducted as per RFQ documents

  • Option clause allows ±25% quantity change

  • Minimum delivery extension: 30 days

  • Delivery timeline linked to original delivery order date

Terms & Conditions

  • Option clause enabling quantity variation up to 25%

  • Inspection conducted per RFQ; GeM terms prevail in conflicts

  • Delivery period adjustments calculated using specified formula with minimum 30 days

Important Clauses

Delivery Schedule

Delivery period starts from last date of original delivery order; extended period calculated per option clause with minimum 30 days

Inspection & Quality

Inspection to be carried out as per RFQ document; GE Ministry GeM portal terms apply in case of conflict

Price/Quantity Variations

Purchaser may increase/decrease quantity by up to 25% during contract and currency; rates remain contracted

Bidder Eligibility

  • Experience in similar supply or transportation contracts ( BPCL or comparable entities)

  • GST registration and PAN validation

  • Financial capability to handle potential 25% quantity variation

  • Compliance with GeM RFQ terms and BPCL inspection requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply for Group A , Transportation for Group A , Supply for Group B , Transportation for Group B , Supply for Group C , Transportation for Group C , Supply for Group D , Transportation for Group D , Supply for Group E , Transportation for Group E , Supply for Group F , Transportation for Group F , Supply for Group G , Transportation for Group G , Supply for Group H , Transportation for Group H , Supply for Group I , Transportation for Group I , Supply for Group J , Transportation for Group J , Supply for Group K , Transportation for Group K , Supply for Group L , Transportation for Group L , Supply for Group M , Transportation for Group M

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

31

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

02-07-2026 11:00:00

Pre-Bid Venue

MICROSOFT TEAMS(REFER RFQ DOCUMENT)

Delivery Details

Max Delivery Days

210

Delivery Locations

1

Delivery Cities

Sagar

Delivery Pincodes

470113

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Shahazade Salim Shakil Ahmed470113,Administrative Building, Bharat Petroleum Corporation Limited, BinaSagarMadhya Pradesh4701131210-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9525616.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Bharat Petroleum Corporation Ltd Supply & Transportation Tender SAGAR Madhya Pradesh 470001 - 240 Day Delivery BPCL 2025

Bharat Petroleum Corporation Ltd

SAGAR, MADHYA PRADESH

Posted: 24 November 2025
Closed: 24 December 2025
GEM

SUPPLY FOR MR ITEM_SL_NO 1,TRANSPORTATION FOR MR ITEM_SL_NO 1,SUPPLY FOR MR ITEM_SL_NO 2,TRANSPORTA

Bharat Petroleum Corporation Ltd

SAGAR, MADHYA PRADESH

Posted: 9 December 2025
Closed: 20 January 2026
GEM

SUPPLY OF ITEM FOR GROUP A ITEMS,SUPPLY OF ITEM FOR GROUP B ITEMS,SUPPLY OF ITEM FOR GROUP C ITEMS,

Indian Oil Corporation Limited

BEGUSARAI, BIHAR

Posted: 5 December 2024
Closed: 26 December 2024
GEM

Engineers India Limited Supply for Groups A-D Tender Pune Maharashtra 3% CPBG 0.5% PRS 2026

Engineers India Limited

PUNE, MAHARASHTRA

Posted: 11 March 2026
Closed: 10 April 2026
GEM

SUPPLY OF GROUP A,SUPPLY OF GROUP B,SUPPLY OF GROUP C,Supply of Group D

Indian Oil Corporation Limited

BEGUSARAI, BIHAR

Posted: 19 December 2024
Closed: 21 March 2025
GEM

Bill of Quantities (BOQ) 26 Items Sign in for GEM prices

#1

Supply for Group A

Supply for Group A as per MR

1 lot Delivery: 210 days
#2

Transportation for Group A

Transportation for Group A as per MR

1 lot Delivery: 210 days
#3

Supply for Group B

Supply for Group B as per MR

1 lot Delivery: 210 days
#4

Transportation for Group B

Transportation for Group B as per MR

1 lot Delivery: 210 days
#5

Supply for Group C

Supply for Group C as per MR

1 lot Delivery: 210 days
#6

Transportation for Group C

Transportation for Group C as per MR

1 lot Delivery: 210 days
#7

Supply for Group D

Supply for Group D as per MR

1 lot Delivery: 210 days
#8

Transportation for Group D

Transportation for Group D as per MR

1 lot Delivery: 210 days
#9

Supply for Group E

Supply for Group E as per MR

1 lot Delivery: 210 days
#10

Transportation for Group E

Transportation for Group E as per MR

1 lot Delivery: 210 days
#11

Supply for Group F

Supply for Group F as per MR

1 lot Delivery: 210 days
#12

Transportation for Group F

Transportation for Group F as per MR

1 lot Delivery: 210 days
#13

Supply for Group G

Supply for Group G as per MR

1 lot Delivery: 210 days
#14

Transportation for Group G

Transportation for Group G as per MR

1 lot Delivery: 210 days
#15

Supply for Group H

Supply for Group H as per MR

1 lot Delivery: 210 days
#16

Transportation for Group H

Transportation for Group H as per MR

1 lot Delivery: 210 days
#17

Supply for Group I

Supply for Group I as per MR

1 lot Delivery: 210 days
#18

Transportation for Group I

Transportation for Group I as per MR

1 lot Delivery: 210 days
#19

Supply for Group J

Supply for Group J as per MR

1 lot Delivery: 210 days
#20

Transportation for Group J

Transportation for Group J as per MR

1 lot Delivery: 210 days
#21

Supply for Group K

Supply for Group K as per MR

1 lot Delivery: 210 days
#22

Transportation for Group K

Transportation for Group K as per MR

1 lot Delivery: 210 days
#23

Supply for Group L

Supply for Group L as per MR

1 lot Delivery: 210 days
#24

Transportation for Group L

Transportation for Group L as per MR

1 lot Delivery: 210 days
#25

Supply for Group M

Supply for Group M as per MR

1 lot Delivery: 210 days
#26

Transportation for Group M

Transportation for Group M as per MR

1 lot Delivery: 210 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply/transportation contracts

4

Financial statements or turnover proof (as applicable)

5

EMD/Security deposit documentation (as specified in RFQ terms)

6

Technical bid documents and compliance certificates

7

OEM authorizations (if applicable) and inspection/test certificates

8

Any BPCL GeM-specific bid submission forms

Corrigendum Updates

1 Update
#1

Update

10-Jul-2026

Extended Deadline

20-Jul-2026, 12:00 pm

Opening Date

20-Jul-2026, 12:30 pm

Frequently Asked Questions

Key insights about MADHYA PRADESH tender market

What documents are required for BPCL GeM tender submission in 2026?

Bidders must submit GST registration, PAN card, experience certificates, financial statements, EMD documentation, RFQ-compliant technical bid, OEM authorizations if needed, and any BPCL GeM bid submission forms. Ensure RFQ terms align with GeM platform and BPCL inspection criteria.

How does BPCL's 25% quantity variation clause affect bids?

The purchaser may adjust order quantity by up to 25% during contract execution. Bidders should price for possible variations and ensure capacity to scale; delivery extensions are computed using the formula (additional/original) × original delivery days, minimum 30 days.

What are the inspection requirements for BPCL GeM RFQ bids?

Inspection is conducted as per the RFQ document. In case of conflicts, GeM portal terms prevail. Bidders should prepare for on-site or document-based verification per BPCL RFQ, including any compliance certificates and product conformity checks.

What is the delivery timeline policy for BPCL multi-group tender 2026?

Delivery period begins from the last date of the original delivery order. If the option clause is exercised, extended time = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

Which items are included in BPCL 26-item BOQ for tender 2026?

The BOQ comprises 26 items, but item-wise quantities are not disclosed in the provided data. Bidders must refer to the RFQ for precise item definitions, quantities, and unit measurements before bid submission.

What standards or certifications are required for BPCL supply contracts?

The current data does not specify explicit standards. Inspect as per RFQ; ensure compliance with any OEM authorizations and technical bid certificates requested in the RFQ and GeM RFQ documents.

Similar Tenders

5 found

Supply of Group-A1 as per MR,Supply of Group-A2 as per MR,Supply of Group-A3 as per MR,Supply of Gr

Bharat Petroleum Corporation Ltd

📍 SAGAR, MADHYA PRADESH

EMD: ₹1
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

GROUP-A1- SUPPLY,GROUP-A1- TRANSPORTATION,GROUP-A1- MANDATORY SPARES WITH TRANSPORTATION,GROUP-A2-

Bharat Petroleum Corporation Ltd

📍 SAGAR, MADHYA PRADESH

EMD: ₹2.0 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Bharat Petroleum Corporation Ltd SAGAR MP Supply Price, Transportation & Site Work Charges for Group A1/A2 2026

Bharat Petroleum Corporation Ltd

📍 SAGAR, MADHYA PRADESH

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

SUPPLY OF MR ITEM 01.001 GROUP A1,SUPPLY OF MR ITEM 01.002 GROUP A1,TRANSPORTATION FOR MR ITEM 01.0

Hindustan Petroleum Corporation Ltd

📍 MUMBAI, MAHARASHTRA

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Supply of MR Item no. 01.001 of Group A1 as per MR,Supply of MR Item no. 01.002 of Group A1 as per

Numaligarh Refinery Limited

📍 GOLAGHAT, ASSAM

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM