H4, 8135-000150,H4, 8135-000041,Z3, STENTOR-MIL-I-7798A-ADHESIVE,H2, 8315-000321,H2, 8305-000083
Indian Army
Bid Publish Date
17-Jan-2026, 11:51 am
Bid End Date
27-Jan-2026, 12:00 pm
EMD
₹2,60,464
Location
Progress
Quantity
18854
Category
H2 8315-000321 T NIWAR UNDYED 75
Bid Type
Two Packet Bid
Organization: Indian Army, Department Of Military Affairs. Procurement: stores across 5 BOQ items; location KANGRA, HIMACHAL PRADESH 176001. Estimated value: not disclosed; EMD: ₹260,464. Context: pre/post-inspection framework with strict sample approvals and design drawings before bulk manufacturing. Key differentiators: mandatory advance sample and drawing approvals, with delivery timeline adjustments if buyer delays. This tender emphasizes compliance, detailed design coordination, and post-delivery acceptance by the consignee. The absence of explicit item specifications suggests reliance on project drawings and BOQ references, underscoring the need for precise alignment with buyer samples and approved designs. Unique clauses include sample approval timelines, and potential rework if deviations are found after approval. Tender supports a structured bid pathway with clear QA checkpoints.
EMD of ₹260,464 required with bid submission
Advance sample and detailed design drawings must be approved within 5 days of award
Delivery period may be refixed with no LD if buyer delays approvals
Post-receipt inspection conducted by Board of Officers at consignee site
Turnover criteria based on last 3 years; exact value specified in bid document
Delivery schedule adjustable; no LD during buyer delays in sample/design approvals; payment terms not explicitly stated in available data
Delivery period may be refixed if buyer delays approvals of advance sample or drawings; bulk supply must follow approved samples/drawings
Not explicitly specified; LD applicability would depend on contract terms and final bid document
Minimum average annual turnover over the last 3 financial years as per bid document
Experience certificates for similar supply/stores to be demonstrated
GST registration and PAN card validity
OEM authorizations or supplier certifications if applicable
Compliance with post-receipt inspection requirements
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
KAMRUP, ASSAM
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | H2 8305-000084 1 MSLN WHITE BCH | H2 8305-000084 1 MSLN WHITE BCH | 4,862 | nos | hqjcoic | 45 |
| 2 | H2 4020-000147 ROPE HEMP HAWSERLAID 20MM DIA | H2 4020-000147 ROPE HEMP HAWSERLAID 20MM DIA | 470 | mtr | hqjcoic | 45 |
| 3 | H2 8315-000321 T NIWAR UNDYED 75 | H2 8315-000321 T NIWAR UNDYED 75 | 11,639 | mtr | hqjcoic | 45 |
| 4 | J2 CAMPNIV-39 CONTR WATER ALMN ALLOY | J2 CAMPNIV-39 CONTR WATER ALMN ALLOY | 1,295 | nos | hqjcoic | 45 |
| 5 | J2 7240-000322 CAN OIL 4.5 LTRS | J2 7240-000322 CAN OIL 4.5 LTRS | 588 | nos | hqjcoic | 45 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates (similar supply experience)
Financial statements / Turnover proofs (last 3 financial years)
EMD deposit receipt or online payment acknowledgment
Technical bid submission documents (compliance with drawings and samples)
OEM authorizations / supplier certifications (if applicable)
Detailed design drawings and sample approval documentation
Key insights about HIMACHAL PRADESH tender market
Bidders must submit GST, PAN, financials for last 3 years, and EMD of ₹260,464. Include detailed design drawings and advance sample ahead of bulk supply. Ensure post-delivery inspection readiness by Board of Officers and comply with sample approval timelines (5 days) to avoid delivery delays.
Required documents include GST certificate, PAN, three-year turnover statements, experience certificates, EMD payment receipt, OEM authorizations if applicable, and technical bid documents showing compliance with advance sample and drawing approvals.
Within 5 days of award, submit one advance sample and Detailed Design Drawings. The buyer will approve or specify modifications within 5 days. Delays by the buyer shift the delivery timeline; ensure all modifications are addressed to proceed with bulk production.
The bid security amount is ₹260,464. Submit via online payment or demand draft per tender terms. Ensure the EMD accompanies the technical bid to avoid disqualification and to meet eligibility criteria for Indian Army procurement.
Post-receipt inspection is conducted at the consignee site byBOARD OF OFFRS. Ensure stores conform to approved samples and drawings; non-conforming items may lead to rejection, with potential contract termination if major deviations are found.
The bidder must demonstrate a minimum average annual turnover over the last three financial years as specified in the bid document. Provide financial statements audited or certified to prove turnover compliance and eligibility for the Indian Army supply contract.
Prepare and submit a single advance sample and detailed drawings within 5 days of award. Await buyer approval or modification list within 5 days; adjust bulk production to match approved specifications and avoid LD penalties due to supplier delays.
Delivery includes installation at the COMDT address, with potential commissioning if covered in scope. Confirm installation responsibilities in the contract and align delivery with approved drawings to ensure seamless on-site setup.
Indian Army
📍 ALLAHABAD, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS