TenderDekho Logo
GEM

Open Tender for Power Contactor ML-4,Switch Socket comb 15 or 16 Amp Multi purpose 6 Pin,MCB SPN 40 Amp C series,5 in EAST KHASI HILLS, MEGHALAYA

Bid Publish Date

27-Sep-2025, 2:27 pm

Bid End Date

07-Oct-2025, 3:00 pm

Progress

RA
Issue27-Sep-2025, 2:27 pm
Reverse Auction18-Oct-2025, 11:00 am
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

3238

Category

MCB 4P 63 Amp, TPN

Bid Type

Two Packet Bid

Categories 60

Public procurement opportunity for Indian Army Power Contactor ML-4, Switch Socket comb 15 or 16 Amp Multi purpose 6 Pin, MCB SPN 40 Amp C series, 5 in EAST KHASI HILLS, MEGHALAYA. Quantity: 3238 issued by. Submission Deadline: 07-10-2025 15: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8355556.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Power Contactor ML-4,Switch Socket comb 15 or 16 Amp Multi purpose 6 Pin,MCB SPN 40 Amp C series,5

Indian Army

EAST KHASI HILLS, MEGHALAYA

Posted: 21 July 2025
Closed: 31 July 2025
GEM

Indian Army Procurement: Security Equipment Tender East Khasi Hills Meghalaya 2026

Indian Army

EAST KHASI HILLS, MEGHALAYA

Posted: 24 January 2026
Closed: 4 February 2026
GEM

Indian Army Security Equipment Tender 2026 - 25% Quantity Option, EMD ₹39,392, 3 Years Govt Experience

Indian Army

EAST KHASI HILLS, MEGHALAYA

Posted: 4 June 2026
Closed: 15 June 2026
GEM

SP MCB 6 A,1 Pole 10A AC MCB,MCB SP 16 AMP,2 Pole 20 Amps MCB,ICTPN MAIN SWITCH 63A,CONTACTOR POWER

Damodar Valley Corporation

Posted: 15 October 2024
Closed: 13 November 2024
GEM

Power contractor type ML 6 125 Amps 1 No 3,Power contractor type ML 10 125 Amps 1 No 4,Switch 15 or

Indian Army

Posted: 15 September 2025
Closed: 25 September 2025
GEM

Bill of Quantities (BOQ) 117 Items Sign in for GEM prices

#1

Power Contactor ML-4

Power Contactor ML-4

4 nos Delivery: 15 days
#2

Switch Socket comb 15 or 16 Amp Multi purpose 6 Pin

Switch Socket comb 15 or 16 Amp Multi purpose 6 Pin

190 nos Delivery: 15 days
#3

MCB SPN 40 Amp C series

MCB SPN 40 Amp C series

39 nos Delivery: 15 days
#4

5 or 6 Amp Switch Socket Combined with Box

5 or 6 Amp Switch Socket Combined with Box

204 nos Delivery: 15 days
#5

MCCB with thermal magnetic trip unit TMD , 4 Pole, 160 Amp

MCCB TMD , 4 Pole, 160 Amp, 415V 50 Hz of breaking capacity 25 KA

2 each Delivery: 15 days
#6

PVC Cable 10.0 Sqmm SC Aluminium

PVC Cable 10.0 Sqmm Single Core Aluminium Length 90 Mtr Long

1 coil Delivery: 15 days
#7

MCCB 250 Amp 4 Pole 35KA

MCCB 250 Amp 4 Pole 35KA

3 nos Delivery: 15 days
#8

HT Barrel Fuse 60 Amp

HT Barrel Fuse 60 Amp

99 nos Delivery: 15 days
#9

Cable PVC insulated copper 2.5 Sqmm Twin Core

Cable PVC insulated copper 2.5 Sqmm Twin Core

171 rm Delivery: 15 days
#10

MCB 4P 63 Amp, TPN

MCB 4P 63 Amp, TPN

4 nos Delivery: 15 days
#11

MCB 40 Amp 1 Pole plus N, B Series

MCB 40 Amp 1 Pole plus N, B Series

9 nos Delivery: 15 days
#12

Tape insulation PVC 15mm

Tape insulation PVC 15mm width 9 mtr long 10 Each roll

70 roll Delivery: 15 days
#13

MCB 63 Amp 3 Pole plus N, B Series

MCB 63 Amp 3 Pole plus N, B Series

9 nos Delivery: 15 days
#14

MCCB 63 Amp 4 pole 25 KA

MCCB 63 Amp 4 pole 25 KA

2 nos Delivery: 15 days
#15

Cable PVC insulated copper unarmoured 10 Sqmm Twin Core

Cable PVC insulated copper unarmoured 10 Sqmm Twin Core

28 rm Delivery: 15 days
#16

MCCB 4 Pole 400 Amp 35 KA

MCCB 4 Pole 400 Amp 35 KA

1 nos Delivery: 15 days
#17

HT Barrel Fuse 100 Amp

HT Barrel Fuse 100 Amp

35 nos Delivery: 15 days
#18

Cable PVC insulated copper 4 Sqmm single core

Cable PVC insulated copper 4 Sqmm single core

146 rm Delivery: 15 days
#19

MCCB 200 Amp 4 Pole 25KA

MCCB 200 Amp 4 Pole 25KA

1 nos Delivery: 15 days
#20

Busbar chambers 4 pole 63 Amp

Busbar chambers 4 pole 63 Amp

1 nos Delivery: 15 days
#21

HT Barrel Fuse 40 Amp

HT Barrel Fuse 40 Amp

70 nos Delivery: 15 days
#22

Cable PVC insulated copper 2.5 Sqmm Single Core

Cable PVC insulated copper 2.5 Sqmm Single Core

207 rm Delivery: 15 days
#23

MCB 20 Amp 1 Pole, B Series

MCB 20 Amp 1 Pole, B Series

16 nos Delivery: 15 days
#24

MCCB 160 Amp 4 Pole 25KA

MCCB 160 Amp 4 Pole 25KA

2 nos Delivery: 15 days
#25

MCB 63 Amp 1 Pole plus N, B Series

MCB 63 Amp 1 Pole plus N, B Series

9 nos Delivery: 15 days
#26

PVC Cable 10.0 Sqmm Twin Core Alu

PVC Cable 10.0 Sqmm Twin Core Aluminium Length 100 Mtr Long

2 coil Delivery: 15 days
#27

Machine Screw with washer 25 mm. Each 100 Nos

Machine Screw with washer 25 mm. Each 100 Nos

8 pkts Delivery: 15 days
#28

MCB 16 Amp 1 Pole plus N, B Series

MCB 16 Amp 1 Pole plus N, B Series

14 nos Delivery: 15 days
#29

4 Way, 4 Modules DB

4 Way, 4 Moduules DB

3 each Delivery: 15 days
#30

Cable PVC insulated copper 1.5 Sqmm single core

Cable PVC insulated copper 1.5 Sqmm single core

223 rm Delivery: 15 days
#31

XLPE Cable 10 sqmm 04 core Alu

XLPE Cable 10 sqmm 04 core aluminium

48 mtr Delivery: 15 days
#32

MCCB 125 Amp 25 KA 4 pole

MCCB 125 Amp 25 KA 4 pole

1 nos Delivery: 15 days
#33

Call Bell Ding Dong

Call Bell Ding Dong

30 nos Delivery: 15 days
#34

P T Switch 10 Ax or 6Ax 1 Way Modular

P T Switch 10 Ax or 6Ax 1 Way Modular

28 nos Delivery: 15 days
#35

MCB 40 Amp 1 Pole, B Series

MCB 40 Amp 1 Pole, B Series

10 nos Delivery: 15 days
#36

Bakelite Sheet 8inch x 10inch x 4mm

Bakelite Sheet 8inch x 10inch x 4mm

15 each Delivery: 15 days
#37

HT Barrel Fuse 120 Amp

HT Barrel Fuse 120 Amp

14 nos Delivery: 15 days
#38

MCCB 4 Pole 100 Amp 25 KA

MCCB 4 Pole 100 Amp 25 KA

3 nos Delivery: 15 days
#39

MCB 25 Amp 1 Pole plus N, B Series

MCB 25 Amp 1 Pole plus N, B Series

10 nos Delivery: 15 days
#40

MCB 32 Amp 1 Pole plus N, B Series

MCB 32 Amp 1 Pole plus N, B Series

9 nos Delivery: 15 days
#41

P T Switch 16 Ax 1 Way Modular

P T Switch 16 Ax 1 Way Modular

47 nos Delivery: 15 days
#42

Call Bell Buzzer

Call Bell Buzzer

43 nos Delivery: 15 days
#43

Machine screw with washer 20 mm

Machine screw with washer 20 mm Each 100 Nos

6 pkts Delivery: 15 days
#44

Cable Flexible copper 40 oblique 0.0076

Cable Flexible copper 40 oblique 0.0076

107 rm Delivery: 15 days
#45

6 Way 6 Moduules DB

6 Way 6 Moduules DB Distribution Board

2 each Delivery: 15 days
#46

Lugs Alu 350mm

Lugs Alu 350mm

22 nos Delivery: 15 days
#47

Lugs Alu 350mm

Lugs Alu 350mm

22 nos Delivery: 15 days
#48

LT joining kit, 1.1 KV 240 oblique 320 Sqmm

LT joining kit, 1.1 KV 240 oblique 320 Sqmm

1 each Delivery: 15 days
#49

HT 11000 V Insulating Mat

HT 11000 V Insulating Mat

1 each Delivery: 15 days
#50

HT Barrel Fuse 30 Amp

HT Barrel Fuse 30 Amp

27 nos Delivery: 15 days
#51

Surface Mounting Box for Switch, 4 Gang Box

Surface Mounting Box for Switch, 4 Gang Box

20 each Delivery: 15 days
#52

XLPE PVC insulated armoud Twin Core 10 sqmm Alu

XLPE PVC insulated armoud Twin Core 10 sqmm aluminium

13 rm Delivery: 15 days
#53

MCB 16 Amp 1 Pole, B Series

MCB 16 Amp 1 Pole, B Series

17 nos Delivery: 15 days
#54

Bakelite Sheet 8inch x 6inch x 4mm

Bakelite Sheet 8inch x 6inch x 4mm

17 each Delivery: 15 days
#55

LT joining kit, 1.1 KV 120 Sqmm

LT joining kit, 1.1 KV 120 Sqmm

1 each Delivery: 15 days
#56

Plug Top 16 Amp

Plug Top 16 Amp

30 nos Delivery: 15 days
#57

6 oblique 16A 3 Pin Socket Modular

6 oblique 16A 3 Pin Socket Modular

10 nos Delivery: 15 days
#58

Surface Mounting Box for Switch, 3 Gang Box

Surface Mounting Box for Switch, 3 Gang Box

19 each Delivery: 15 days
#59

Switch Piano Mini Modular 5 or 6 Amp

Switch Piano Mini Modular 5 or 6 Amp

140 nos Delivery: 15 days
#60

MCB SP 06 Amp C series

MCB SP 06 Amp C series

18 nos Delivery: 15 days
#61

Cable flexible copper 23 oblique 0.0076

Cable flexible copper 23 oblique 0.0076

78 rm Delivery: 15 days
#62

MCB 20 Amp 1 Pole plus N, B Series

MCB 20 Amp 1 Pole plus N, B Series

7 nos Delivery: 15 days
#63

SPN DB box 8way Double Door

SPN DB box 8way Double Door

1 nos Delivery: 15 days
#64

Flexible pipe 20 mm

Flexible pipe 20 mm

1 roll Delivery: 15 days
#65

MCB 32 Amp 1 Pole, B Series

MCB 32 Amp 1 Pole, B Series

13 nos Delivery: 15 days
#66

Bakelite Sheet 7inch x4inch x4mm

Bakelite Sheet 7inch x4inch x4mm

21 each Delivery: 15 days
#67

Surface Mounting Box for Switch, 1 Gang Box

Surface Mounting Box for Switch, 1 Gang Box

19 each Delivery: 15 days
#68

MCB 25 Amp 1 Pole, B Series

MCB 25 Amp 1 Pole, B Series

12 nos Delivery: 15 days
#69

Flexible pipe 12 oblique 15 mm

Flexible pipe 12 oblique 15 mm

1 roll Delivery: 15 days
#70

2 Way, 2 Moduules DB

2 Way, 2 Moduules DB Distribution Board

3 each Delivery: 15 days
#71

Angle holder

Angle holder

33 nos Delivery: 15 days
#72

Batton holder

Batton holder

30 nos Delivery: 15 days
#73

LT joining kit, 1.1 KV 95 Sqmm

LT joining kit, 1.1 KV 95 Sqmm

1 each Delivery: 15 days
#74

LT joining kit, 1.1 KV 70 Sqmm

LT joining kit, 1.1 KV 70 Sqmm

1 each Delivery: 15 days
#75

LT joining kit, 1.1 KV 50 Sqmm

LT joining kit, 1.1 KV 50 Sqmm

1 each Delivery: 15 days
#76

MCB SPN 63 Amp C series

MCB SPN 63 Amp C series

2 nos Delivery: 15 days
#77

Plug Top 06 Amp

Plug Top 06 Amp

18 nos Delivery: 15 days
#78

Surface Mounting Box for Switch, 2 Gang Box

Surface Mounting Box for Switch, 2 Gang Box

11 each Delivery: 15 days
#79

15 Amp Gang Box 4 Screw

15 Amp Gang Box 4 Screw

9 nos Delivery: 15 days
#80

Bell Push 5 A

Bell Push 5 A

23 nos Delivery: 15 days
#81

Lugs 95Sqmm XLPE Cable

Lugs 95Sqmm XLPE Cable

27 nos Delivery: 15 days
#82

Lugs Alu 250Sqmm

Lugs Alu 250Sqmm

20 nos Delivery: 15 days
#83

Lugs Alu 300Sqmm

Lugs Alu 300Sqmm

18 nos Delivery: 15 days
#84

Bed Switch

Bed Switch

18 nos Delivery: 15 days
#85

PVC conduit 20 oblique 25 mm medium grade

PVC conduit 20 oblique 25 mm medium grade

26 rm Delivery: 15 days
#86

PVC Switch Board box of size 6inch x 8inch

PVC Switch Board box of size 6inch x 8inch

8 nos Delivery: 15 days
#87

PVC Casing capping 20 oblique 25 mm

PVC Casing capping 20 oblique 25 mm

22 rm Delivery: 15 days
#88

Bakelite sheet 4inch x 4inch x 4mm

Bakelite sheet 4inch x 4inch x 4mm

8 nos Delivery: 15 days
#89

PVC Switch Board box of size 4inch x 7inch

PVC Switch Board box of size 4inch x 7inch

8 nos Delivery: 15 days
#90

Lugs 70Sqmm XLPE Cable

Lugs 70Sqmm XLPE Cable

18 nos Delivery: 15 days
#91

Pendent holder

Pendent holder

15 nos Delivery: 15 days
#92

Lugs 50Sqmm XLPE Cable

Lugs 50Sqmm XLPE Cable

25 nos Delivery: 15 days
#93

Lugs Copper 35Sqmm

Lugs Copper 35Sqmm

6 nos Delivery: 15 days
#94

Lugs Alu 150Sqmm

Lugs Alu 150Sqmm

8 nos Delivery: 15 days
#95

6A PT Switch 2 way

6A PT Switch 2 way

14 each Delivery: 15 days
#96

Lugs Alu 200Sqmm

Lugs Alu 200Sqmm

5 nos Delivery: 15 days
#97

Cable ties medium

Cable ties medium

26 nos Delivery: 15 days
#98

Lugs Alu 120 Sqmm

Lugs Alu 120 Sqmm

8 nos Delivery: 15 days
#99

PVC Switch Board box of size 4inch x 4inch

PVC Switch Board box of size 4inch x 4inch

8 nos Delivery: 15 days
#100

Cable ties small

Cable ties small

26 nos Delivery: 15 days
#101

Lugs Alu 35Sqmm

Lugs Alu 35Sqmm

25 nos Delivery: 15 days
#102

MCB SPN 5 to 32 Amp C series

MCB SPN 5 to 32 Amp C series

1 nos Delivery: 15 days
#103

Lugs 25SqmmXLPE Cable

Lugs 25SqmmXLPE Cable

19 nos Delivery: 15 days
#104

MS nut bolt washer of size 3ft long 5 oblique 8inch dia

MS nut bolt washer of size 3ft long 5 oblique 8inch dia

8 kgs Delivery: 15 days
#105

Lugs Alu 16 Sqmm

Lugs Alu 16 Sqmm

10 nos Delivery: 15 days
#106

Lugs Copper 16 Sqmm

Lugs Copper 16 Sqmm

6 nos Delivery: 15 days
#107

Lugs Alu 10 Sqmm

Lugs Alu 10 Sqmm

6 nos Delivery: 15 days
#108

Lugs Copper 10 Sqmm

Lugs Copper 10 Sqmm

6 nos Delivery: 15 days
#109

Cable PVC insulation Sincle Core 4 Sqmm Copper

Cable PVC insulation Sincle Core 4 Sqmm Copper Conductor 1100V

4 rm Delivery: 15 days
#110

Cable PVC Single Core 1.5 sqmm copper

Cable PVC Single Core 1.5 sqmm copper

4 rm Delivery: 15 days
#111

PVC Switch Board box of size 6inch x 6inch

PVC Switch Board box of size 6inch x 6inch

31 nos Delivery: 15 days
#112

XLPE Cable 16 sqmm 04 core Alu

XLPE Cable 16 sqmm 04 core aluminium

13 mtr Delivery: 15 days
#113

MCCB 320 Amp 4 Pole 36KA

MCCB 320 Amp 4 Pole 36KA

2 nos Delivery: 15 days
#114

Switch Modular 5A oblique 6A

Switch Modular 5A oblique 6A

50 nos Delivery: 15 days
#115

Switch Modular 15A oblique 16A

Switch Modular 15A oblique 16A

50 nos Delivery: 15 days
#116

Socket Modular 5A oblique 6A

Socket Modular 5A oblique 6A

50 nos Delivery: 15 days
#117

Socket Modular 15A oblique 16A

Socket Modular 15A oblique 16A

50 nos Delivery: 15 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Additional Doc 4 (Requested in ATC)

10

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

18-Oct-2025, 11:00 am

End

20-Oct-2025, 11:00 am

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
F W ENTERPRISE   Under PMA
-29-09-2025 19:48:44
2
M/S RANAJIT DEB ENTERPRISE   Under PMA
-30-09-2025 21:59:52
3
M/S S.T TRADERS   Under PMA
-30-09-2025 13:56:15
4
R. K. ENTERPRISE   Under PMA
-30-09-2025 18:35:04

Financial Results

Rank Seller Price Item
L1
F W ENTERPRISE(MSE,MII)( MSE Social Category:ST )    Under PMA
Item Categories : Power Contactor ML-4,Switch Socket comb 15 or 16 Amp Multi purpose 6 Pin,MCB SPN 40 Amp C series,5
L2
R. K. ENTERPRISE (MSE,MII)( MSE Social Category:ST )    Under PMA
Item Categories : Power Contactor ML-4,Switch Socket comb 15 or 16 Amp Multi purpose 6 Pin,MCB SPN 40 Amp C series,5
L3
M/S S.T TRADERS (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Power Contactor ML-4,Switch Socket comb 15 or 16 Amp Multi purpose 6 Pin,MCB SPN 40 Amp C series,5
L4
M/S RANAJIT DEB ENTERPRISE (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Power Contactor ML-4,Switch Socket comb 15 or 16 Amp Multi purpose 6 Pin,MCB SPN 40 Amp C series,5

Similar Tenders

5 found
Urgent

Bids are Invited For Supply of Switch Tumbler 5 Amps One Way and Socket 3 Pin 5 Amps in MUMBAI, MAHARASHTRA

Brihanmumbai Electric Supply and Transport Undertaking

📍 MUMBAI, MAHARASHTRA

⏰ Deadline: 3 days left
🛒 Type: Goods
View EPROCURE

UP State Sugar Corporation Ltd SMPS 5A 24VDC & Electrical Components Tender Uttar Pradesh 2026

U P State Sugar Corporation Ltd

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

100A 3P MCCB,63A TPN MCCB,32A TPN MCCB,25A SP MCB,16A SP MCB,20A SP MCB,10A SP MCB,Power Contactor

Uttar Pradesh Power Corporation Limited (uppcl)

📍 HATHRAS, UTTAR PRADESH

Est: ₹2.0 L
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM

Colin 750 Ml,Cartg 88 A for Laserjet printer Model 128 FW,Cartg 228 for LaserJet Printer Model 427,

Border Security Force (bsf)

📍 KANDHAMAL, ODISHA

Est: ₹45,000
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

BLOCK PLUMMER, SN 522,CIRCUIT BREAKER MCCB, 250 A, 415V, 3 P,COPPER JUMPER CONNECTORS,KIT CONTACTOR

Eastern Coalfields Limited

📍 BARDHAMAN, WEST BENGAL

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM