TenderDekho Logo
GEM

Invitation to Bid - Labour charges for laying of copper tape,Labour charges for making earth pit,Labour charges for fix

Bid Publish Date

03-Jun-2026, 4:20 pm

Bid End Date

25-Jun-2026, 5:00 pm

EMD

₹28,200

Value

₹14,10,926

Progress

Issue03-Jun-2026, 4:20 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

511

Category

Labour charges for laying of copper tape

Bid Type

Two Packet Bid

Directorate General Of Lighthouses And Lightships invites bids for Labour charges for laying of copper tape, Labour charges for making earth pit, Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. , Labour charges for removal of old earthing, Transportation of earthing materials from Sri Vijayapuram to aerial bay by bus or boat or cargo vehicle. , Transportation of earthing materials from aerial Bay to East Island Jetty including dinghi hire charges along with safety boat. , Labour charges for transportation of earthing materials from shore to lighthouse. , Transportation of earthing materials from Sri Vijayapuram to aerial bay by busorboator cargo vehicle. , Transportaion of earthing materials from aerial Bay to Ross Island Port Cornwallis including dinghi hire charges along with safety boat. , Transportation of earthing materials from Sri Vijayapuram to Mayabunder by busorboator cargo vehicle. , Transportation of earthing materials from Mayabunder to Aves Island including dinghi hire charges along with safety boat. , Transportation of earthing materials from Sri Vijayapuram to Sir huge Ross Island by hiring mechanized dinghi along with safety boat. , Transportation of earthing materials from Sri Vijayapuram to North Bay Island by hiring mechanized dinghi along with safety boat. , Transportation of earthing materials from Sri Vijayapuram to Chidiyatapu beach by cargo vehicle. , Labour charges for transportation of earthing materials from Chidiyatapu shore to lighthouse including etc. as required, Transportation of earthing materials from Sri Vijayapuram to North Cinque Island by hiring mechanized dinghi along with safety boat. , Transportation of earthing materials from shore to site including labour etc. , Transportation of earthing materials from Sri Vijayapuram to Little Andaman Jetty by cargo vessel. , Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc. , Transportation of earthing materials from Sri Vijayapuram to Car Nicobar Jetty by cargo vessel. , Transportation of earthing materials from Sri Vijayapuram to Katchal East Jetty by cargo vessel. , Transportation of earthing materials from jetty to site including vehicle hire charges, labour etc. , Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel. , Hiring of mechanized dinghy from Campbell Bay to Rosen point for transportation of men and materials etc. as required. . Quantity: 511. Submission Deadline: 25-06-2026 17: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Labour charges for laying of copper tape , Labour charges for making earth pit , Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. , Labour charges for removal of old earthing , Transportation of earthing materials from Sri Vijayapuram to aerial bay by bus or boat or cargo vehicle. , Transportation of earthing materials from aerial Bay to East Island Jetty including dinghi hire charges along with safety boat. , Labour charges for transportation of earthing materials from shore to lighthouse. , Transportation of earthing materials from Sri Vijayapuram to aerial bay by busorboator cargo vehicle. , Transportaion of earthing materials from aerial Bay to Ross Island Port Cornwallis including dinghi hire charges along with safety boat. , Transportation of earthing materials from Sri Vijayapuram to Mayabunder by busorboator cargo vehicle. , Transportation of earthing materials from Mayabunder to Aves Island including dinghi hire charges along with safety boat. , Transportation of earthing materials from Sri Vijayapuram to Sir huge Ross Island by hiring mechanized dinghi along with safety boat. , Transportation of earthing materials from Sri Vijayapuram to North Bay Island by hiring mechanized dinghi along with safety boat. , Transportation of earthing materials from Sri Vijayapuram to Chidiyatapu beach by cargo vehicle. , Labour charges for transportation of earthing materials from Chidiyatapu shore to lighthouse including etc. as required , Transportation of earthing materials from Sri Vijayapuram to North Cinque Island by hiring mechanized dinghi along with safety boat. , Transportation of earthing materials from shore to site including labour etc. , Transportation of earthing materials from Sri Vijayapuram to Little Andaman Jetty by cargo vessel. , Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc. , Transportation of earthing materials from Sri Vijayapuram to Car Nicobar Jetty by cargo vessel. , Transportation of earthing materials from Sri Vijayapuram to Katchal East Jetty by cargo vessel. , Transportation of earthing materials from jetty to site including vehicle hire charges, labour etc. , Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel. , Hiring of mechanized dinghy from Campbell Bay to Rosen point for transportation of men and materials etc. as required.

Authority Records

MINISTRY OF PORTS, SHIPPING AND WATERWAYS
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9380503.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Army Earth Moving Equipment Hiring Kamrup Assam JCB 225 Eco Plus Kobelco SK-220 Ton 2026 Tender

Indian Army

KAMRUP, ASSAM

Posted: 21 April 2026
Closed: 24 April 2026
GEM

Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Hirin

Nmdc Limited

DANTEWADA, CHHATTISGARH

Posted: 10 January 2025
Closed: 31 January 2025
GEM

Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Hirin

Central Railway

Posted: 13 November 2024
Closed: 16 December 2024
GEM

Indian Army Hiring of Earth Moving Equipment Tender West Kameng Arunachal Pradesh 20 Ton Excavator IS 550 Standards 2026

Indian Army

WEST KAMENG, ARUNACHAL PRADESH

Posted: 21 April 2026
Closed: 1 May 2026
GEM

Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Requi

Nmdc Limited

Posted: 9 November 2024
Closed: 23 November 2024
GEM

Bill of Quantities (BOQ) 78 Items Sign in for GEM prices

#1

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower.

45 mtr Delivery: 90 days
#2

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate

1 job Delivery: 90 days
#3

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#4

Labour charges for removal of old earthing

Labour charges for removal of old earthing strip layed on the surface of lighthouse tower from top to bottom, lighting arrestor etc complete as required.

1 job Delivery: 90 days
#5

Transportation of earthing materials from Sri Vijayapuram to aerial bay by bus or boat or cargo vehicle.

Transportation of earthing materials from Sri Vijayapuram to aerial bay by busorboator cargo vehicle.

1 job Delivery: 90 days
#6

Transportation of earthing materials from aerial Bay to East Island Jetty including dinghi hire charges along with safety boat.

Transportation of earthing materials from aerial Bay to East Island Jetty including dinghi hire charges along with safety boat.

2 trip Delivery: 90 days
#7

Labour charges for transportation of earthing materials from shore to lighthouse.

Labour charges for transportation of earthing materials from shore to lighthouse.

1 job Delivery: 90 days
#8

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower.

18 mtr Delivery: 90 days
#9

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate

1 job Delivery: 90 days
#10

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#11

Transportation of earthing materials from Sri Vijayapuram to aerial bay by busorboator cargo vehicle.

Transportation of earthing materials from Sri Vijayapuram to aerial bay by busorboator cargo vehicle.

1 job Delivery: 90 days
#12

Transportaion of earthing materials from aerial Bay to Ross Island Port Cornwallis including dinghi hire charges along with safety boat.

Transportaion of earthing materials from aerial Bay to Ross Island Port Cornwallis including dinghi hire charges along with safety boat.

2 trip Delivery: 90 days
#13

Labour charges for transportation of earthing materials from shore to lighthouse.

Labour charges for transportation of earthing materials from shore to lighthouse.

1 job Delivery: 90 days
#14

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower.

23 mtr Delivery: 90 days
#15

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate

1 job Delivery: 90 days
#16

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#17

Transportation of earthing materials from Sri Vijayapuram to Mayabunder by busorboator cargo vehicle.

Transportation of earthing materials from Sri Vijayapuram to Mayabunder by busorboator cargo vehicle.

1 job Delivery: 90 days
#18

Transportation of earthing materials from Mayabunder to Aves Island including dinghi hire charges along with safety boat.

Transportation of earthing materials from Mayabunder to Aves Island including dinghi hire charges along with safety boat.

2 trip Delivery: 90 days
#19

Labour charges for transportation of earthing materials from shore to lighthouse.

Labour charges for transportation of earthing materials from shore to lighthouse.

1 job Delivery: 90 days
#20

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower.

30 mtr Delivery: 90 days
#21

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate.

1 job Delivery: 90 days
#22

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#23

Labour charges for removal of old earthing

Labour charges for removal of old earthing strip layed on the surface of lighthouse tower from top to bottom, lighting arrestor etc complete as required.

1 job Delivery: 90 days
#24

Transportation of earthing materials from Sri Vijayapuram to Sir huge Ross Island by hiring mechanized dinghi along with safety boat.

Transportation of earthing materials from Sri Vijayapuram to Sir huge Ross Island by hiring mechanized dinghi along with safety boat.

2 trip Delivery: 90 days
#25

Labour charges for transportation of earthing materials from shore to lighthouse.

Labour charges for transportation of earthing materials from shore to lighthouse.

1 job Delivery: 90 days
#26

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower.

45 mtr Delivery: 90 days
#27

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate.

1 job Delivery: 90 days
#28

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#29

Transportation of earthing materials from Sri Vijayapuram to North Bay Island by hiring mechanized dinghi along with safety boat.

Transportation of earthing materials from Sri Vijayapuram to North Bay Island by hiring mechanized dinghi along with safety boat.

2 trip Delivery: 90 days
#30

Labour charges for transportation of earthing materials from shore to lighthouse.

Labour charges for transportation of earthing materials from shore to lighthouse.

1 job Delivery: 90 days
#31

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower.

23 mtr Delivery: 90 days
#32

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate

1 job Delivery: 90 days
#33

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#34

Transportation of earthing materials from Sri Vijayapuram to Chidiyatapu beach by cargo vehicle.

Transportation of earthing materials from Sri Vijayapuram to Chidiyatapu beach by cargo vehicle.

1 job Delivery: 90 days
#35

Labour charges for transportation of earthing materials from Chidiyatapu shore to lighthouse including etc. as required

Labour charges for transportation of earthing materials from Chidiyatapu shore to lighthouse including etc. as required

1 job Delivery: 90 days
#36

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower.

15 mtr Delivery: 90 days
#37

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate

1 job Delivery: 90 days
#38

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#39

Transportation of earthing materials from Sri Vijayapuram to North Cinque Island by hiring mechanized dinghi along with safety boat.

Transportation of earthing materials from Sri Vijayapuram to North Cinque Island by hiring mechanized dinghi along with safety boat.

2 trip Delivery: 90 days
#40

Labour charges for transportation of earthing materials from shore to lighthouse.

Labour charges for transportation of earthing materials from shore to lighthouse.

1 job Delivery: 90 days
#41

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower.

8 mtr Delivery: 90 days
#42

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate

1 job Delivery: 90 days
#43

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#44

Transportation of earthing materials from Sri Vijayapuram to North Cinque Island by hiring mechanized dinghi along with safety boat.

Transportation of earthing materials from Sri Vijayapuram to North Cinque Island by hiring mechanized dinghi along with safety boat.

2 trip Delivery: 90 days
#45

Transportation of earthing materials from shore to site including labour etc.

Transportation of earthing materials from shore to site including labour etc.

1 job Delivery: 90 days
#46

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower.

53 mtr Delivery: 90 days
#47

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate

1 job Delivery: 90 days
#48

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#49

Labour charges for removal of old earthing

Labour charges for removal of old earthing strip layed on the surface of lighthouse tower from top to bottom, lighting arrestor etc complete as required.

1 job Delivery: 90 days
#50

Transportation of earthing materials from Sri Vijayapuram to Little Andaman Jetty by cargo vessel.

Transportation of earthing materials from Sri Vijayapuram to Little Andaman Jetty by cargo vessel.

1 job Delivery: 90 days
#51

Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc.

Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc.

1 job Delivery: 90 days
#52

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower.

45 mtr Delivery: 90 days
#53

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate

1 job Delivery: 90 days
#54

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#55

Labour charges for removal of old earthing

Labour charges for removal of old earthing strip layed on the surface of lighthouse tower from top to bottom, lighting arrestor etc complete as required.

1 job Delivery: 90 days
#56

Transportation of earthing materials from Sri Vijayapuram to Car Nicobar Jetty by cargo vessel.

Transportation of earthing materials from Sri Vijayapuram to Car Nicobar Jetty by cargo vessel.

1 job Delivery: 90 days
#57

Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc.

Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc.

1 job Delivery: 90 days
#58

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower.

32 mtr Delivery: 90 days
#59

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate

1 job Delivery: 90 days
#60

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#61

Labour charges for removal of old earthing

Labour charges for removal of old earthing strip layed on the surface of lighthouse tower from top to bottom, lighting arrestor etc complete as required.

1 job Delivery: 90 days
#62

Transportation of earthing materials from Sri Vijayapuram to Katchal East Jetty by cargo vessel.

Transportation of earthing materials from Sri Vijayapuram to Katchal East Jetty by cargo vessel.

1 job Delivery: 90 days
#63

Transportation of earthing materials from jetty to site including vehicle hire charges, labour etc.

Transportation of earthing materials from jetty to site including vehicle hire charges, labour etc.

1 job Delivery: 90 days
#64

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower.

30 mtr Delivery: 90 days
#65

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate

1 job Delivery: 90 days
#66

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#67

Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel.

Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel.

1 job Delivery: 90 days
#68

Hiring of mechanized dinghy from Campbell Bay to Rosen point for transportation of men and materials etc. as required.

Hiring of mechanized dinghy from Campbell Bay to Rosen point for transportation of men and materials etc. as required.

1 trip Delivery: 90 days
#69

Transportation of earthing materials from shore to site including labour etc.

Transportation of earthing materials from shore to site including labour etc.

1 job Delivery: 90 days
#70

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower.

28 mtr Delivery: 90 days
#71

Labour charges for making earth pit

Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate.

1 job Delivery: 90 days
#72

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#73

Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel.

Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel.

1 job Delivery: 90 days
#74

Transportation of earthing materials from jetty to site including vehicle hire charges, labour etc.

Transportation of earthing materials from jetty to site including vehicle hire charges, labour etc.

1 job Delivery: 90 days
#75

Labour charges for laying of copper tape

Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower.

45 mtr Delivery: 90 days
#76

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts.

1 each Delivery: 90 days
#77

Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel.

Transportation of earthing materials from Sri Vijayapuram to Campbell Bay Jetty by cargo vessel.

1 job Delivery: 90 days
#78

Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc.

Transportation of earthing materials from jetty to Lighthouse site including vehicle hire charges, labour etc.

1 job Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found
Urgent

Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Pe

Border Road Organisation

📍 PAPUM PARE, ARUNACHAL PRADESH

EMD: ₹2.8 L
Est: ₹2.1 Cr
⏰ Deadline: 7 days left
🛒 Type: Service
View GEM

Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Pe

Border Road Organisation

📍 PAPUM PARE, ARUNACHAL PRADESH

EMD: ₹2.1 L
Est: ₹1.3 Cr
⏰ Deadline: 2 weeks left
🛒 Type: Service
View GEM

Bhilai Municipal Corporation Earth Moving Equipments Tender Durg Chhattisgarh 2026 Chain Mountain Excavator 210

Bhilai Municipal Corporation, Chhattisgarh

📍 DURG, CHHATTISGARH

Est: ₹4.7 L
⏰ Deadline: 2 weeks left
🛒 Type: Service
View GEM

Bhilai Municipal Corporation Earth Moving Equipment Hiring Tender Durg Chhattisgarh 2026

Bhilai Municipal Corporation, Chhattisgarh

📍 DURG, CHHATTISGARH

Est: ₹4.9 L
⏰ Deadline: 2 weeks left
🛒 Type: Service
View GEM
Urgent

NMDC Limited Earth Moving Equipment Hiring Tender Bellary Karnataka 2026 - Per Hour Basis, EMD ₹50370

Nmdc Limited

📍 BELLARY, KARNATAKA

EMD: ₹50,370
Est: ₹50.4 L
⏰ Deadline: 2 days left
🛒 Type: Service
View GEM

Explore More Opportunities

Quick Access
Chat with us