TenderDekho Logo
GEM

Uttar Pradesh Cooperative Sugar Factories Federation Limited I.D. Fan Supply Tender Farrukhabad 20 Ton WIL Boiler ISI/ISO 2026

Bid Publish Date

16-Jun-2026, 8:55 pm

Bid End Date

01-Jul-2026, 9:00 pm

Progress

Issue16-Jun-2026, 8:55 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Single Packet Bid

Tender Overview

The purchase opportunity is issued by the Uttar Pradesh Cooperative Sugar Factories Federation Limited, for the Supply of New I. D. Fan with Shaft and Pulley suitable for a WIL Boiler Capacity 20 Ton, to be installed at Farrukhabad, Uttar Pradesh (PIN 205302). The tender specifies a single, clearly defined product category: I. D. fan components with shaft and pulley, balanced with hard-face finishing. The notice indicates no BOQ items are listed and the contract scope centers on procuring the specified boiler fan assembly. A key procurement differentiator is the explicit option clause allowing quantity adjustments up to 25% during contract execution while maintaining contracted rates. This clarifies flexibility in order size with a minimum delivery window tied to extended periods.

Technical Specifications & Requirements

  • Product: New I. D. Fan with Shaft and Pulley for WIL Boiler Capacity 20 Ton; fan balanced with hard face.
  • Location: Farrukhabad, Uttar Pradesh (205302)
  • Standards/Compliance: Not specified; no BOQ items available.
  • Quantity/Value: Not disclosed; final order quantity may be adjusted by up to 25% under the option clause.
  • Delivery/Timeline: Delivery period linked to last date of original delivery order; time-extension formula applies with minimum 30 days; extended duration may equal original delivery period if required.
  • Documentation: Submit as per tender ATC; explicit EMD/value not provided.

Terms, Conditions & Eligibility

  • EMD: Not specified in available data; verify in ATC document.
  • Quantity Flexibility: Purchaser may increase/decrease quantity up to 25% of bid/contract quantity.
  • Delivery: Additional time calculation: (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days.
  • Compliance: Bidders must adhere to option clause and delivery timing; ATC terms govern execution.
  • BOQ: No items listed; procurement scope limited to the identified I. D. Fan package.

Key Specifications

  • Product/service: New I. D. Fan with Shaft and Pulley for WIL Boiler 20 Ton

  • Quantity: Not available in BOQ; subject to option clause allowing ±25% variation

  • Standards/Compliance: Not specified in current data; no IS/ISO numbers provided

  • Performance: Balanced with hard-face finishing; exact vibration/efficiency specs not disclosed

  • Delivery/Installation: Delivery period tied to last date of original delivery order; extended period rules apply

  • Warranty/Support: Not specified in tender data; verify ATC

  • Brand/OEM: No specific brand requirement indicated

Terms & Conditions

  • Option Clause: quantity may vary ±25% during contract at contracted rates

  • Delivery timing: minimum extension rule of 30 days; calculated as (increased/ original) × original period

  • Documentation: follow ATC; EMD amount and validity not disclosed in provided data

Important Clauses

Payment Terms

Not specified in available data; verify in ATC and final contract

Delivery Schedule

Delivery starts from the last date of the original delivery order; extension time formula applies with minimum 30 days

Penalties/Liquidated Damages

Not specified in data; refer to ATC for LD or penalties if late

Bidder Eligibility

  • Experience in supplying boiler auxiliary components or industrial fans

  • Financial capacity to handle contract value (as per ATC)

  • Compliance with option clause regarding quantity adjustments

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of New I. D. Fan with Shaft and pully of WIL Boiler Capacity 20 Ton. Fan Balanced hard face in

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9478096.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Manufacture and supply of Boiler Blow Down Cooler with Nozzles, Fittings

Nuclear Power Corporation Of India Limited

SURAT, GUJARAT

Posted: 21 February 2025
Closed: 14 March 2025
GEM

Fan Coil Unit 1.5 Ton,Fan Coil Unit 2 ton

Indian Army

LEH, JAMMU & KASHMIR

Posted: 2 February 2025
Closed: 24 February 2025
GEM

1. Supply of Impeller for PAL make fan, model no. PA27-150 DIDW having equipment sr no. F-12274,122

Nuclear Power Corporation Of India Limited

UTTARA KANNADA, KARNATAKA

Posted: 17 December 2024
Closed: 8 January 2025
GEM

Hindustan Petroleum Corporation Ltd 42K4 FAN SHAFT Tender Visakhapatnam Andhra Pradesh 2026

Hindustan Petroleum Corporation Ltd

VISAKHAPATNAM, ANDHRA PRADESH

Posted: 7 February 2026
Closed: 17 February 2026
GEM

AC 1.5 ton,Almonard Wall Mounting Fan

Indian Army

Posted: 27 November 2024
Closed: 18 December 2024
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar I. D. fan/boiler component supply

4

Financial statements or turnover proof

5

EMD/Security deposit documentation (as per ATC)

6

Technical bid documents and compliance statements

7

OEM authorization or supplier authorization (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for I. D. fan supply in Farrukhabad tender 2026

Bidders must submit GST, PAN, experience proofs, financials, and EMD as specified in the ATC. The procurement covers a 20 Ton WIL boiler fan with shaft and pulley, balanced with hard-face. Ensure OEM authorization if required and compliance with the option clause allowing ±25% quantity variation at contract rates.

What documents are required for UPCSFFL fan procurement

Submit GST registration, PAN card, recent experience certificates for boiler components, financial statements, EMD document, technical bid, and OEM authorization if you are a subcontractor. ATC governs additional documents; ensure all files are clear, legible, and properly signed.

What is the delivery period for 20 Ton I.D. fan order

Delivery timing aligns with the last date of the original delivery order; if the purchaser exercises the option clause, additional time is (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.

What are the performance requirements for ISI/ISO compliance

Not specified in current tender data; verify in ATC. The fan must be balanced with hard-face finishing for WIL boiler, but exact IS/ISO standards are not listed; confirm during bid submission and supplier qualification.

How does quantity variation affect the bid in Farrukhabad

Bid quantity may be increased or decreased by up to 25% during contract execution at the same contracted rates. This option clause requires bidders to price for potential upsizing and supply planning accordingly.

What is the EMD amount for this Uttar Pradesh tender

EMD amount is not disclosed in the provided data; bidders should refer to the ATC document or portal notices to obtain the exact EMD value and payment method.

Where can I find the BOQ for I.D. fan procurement

BOQ items are not listed in the current tender data. Check the ATC uploaded document and the official portal for the complete BOQ, quantity, and itemized specifications before bidding.

What delivery terms are specified for the 20 Ton fan

Delivery terms are tied to the original order date; the option clause may extend the period. Minimum extension time is 30 days; calculations depend on the ratio of increased to original quantity.

Similar Tenders

5 found
Urgent

DEEP FREEZER CAP 300 LTRS-N4110-P061811,PEDESTAL FAN 16" -N0565-P006471,WINDOW AC 1.5 TON-N4120-000

Indian Navy

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM

Meja Urja Nigamplimited overhauling of fans, ducts and allied equipment at MUNPL Unit Allahabad Uttar Pradesh 2026

Meja Urja Nigamplimited

📍 ALLAHABAD, UTTAR PRADESH

EMD: ₹1.0 L
Est: ₹80.6 L
⏰ Deadline: 2 weeks left
🛒 Type: Service
View GEM

Tender Notice for SUPPLY OF WIL BOILER AND KCP BOILER ID FAN IMPELLER in THIRUVALLUR, TAMIL NADU

Department of Sugar

📍 THIRUVALLUR, TAMIL NADU

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View EPROCURE

BHEL Tender Velore Tamil Nadu 80 LPM @12 BAR LOS FD/PA Fans and 20 LPM @5 BAR LOS ID Fan 2026

Bharat Heavy Electricals Limited (bhel)

📍 VELLORE, TAMIL NADU

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Government Tender Published for Supply of Fan, Exhaust Fan and Other Materials. File No.53/26X6/4. in GWALIOR, MADHYA PRADESH

Directorate Urban Administration and Development

📍 GWALIOR, MADHYA PRADESH

EMD: ₹8,842
Est: ₹11.8 L
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View EPROCURE