Manufacture and supply of Boiler Blow Down Cooler with Nozzles, Fittings
Nuclear Power Corporation Of India Limited
SURAT, GUJARAT
Bid Publish Date
16-Jun-2026, 8:55 pm
Bid End Date
01-Jul-2026, 9:00 pm
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
The purchase opportunity is issued by the Uttar Pradesh Cooperative Sugar Factories Federation Limited, for the Supply of New I. D. Fan with Shaft and Pulley suitable for a WIL Boiler Capacity 20 Ton, to be installed at Farrukhabad, Uttar Pradesh (PIN 205302). The tender specifies a single, clearly defined product category: I. D. fan components with shaft and pulley, balanced with hard-face finishing. The notice indicates no BOQ items are listed and the contract scope centers on procuring the specified boiler fan assembly. A key procurement differentiator is the explicit option clause allowing quantity adjustments up to 25% during contract execution while maintaining contracted rates. This clarifies flexibility in order size with a minimum delivery window tied to extended periods.
Product/service: New I. D. Fan with Shaft and Pulley for WIL Boiler 20 Ton
Quantity: Not available in BOQ; subject to option clause allowing ±25% variation
Standards/Compliance: Not specified in current data; no IS/ISO numbers provided
Performance: Balanced with hard-face finishing; exact vibration/efficiency specs not disclosed
Delivery/Installation: Delivery period tied to last date of original delivery order; extended period rules apply
Warranty/Support: Not specified in tender data; verify ATC
Brand/OEM: No specific brand requirement indicated
Option Clause: quantity may vary ±25% during contract at contracted rates
Delivery timing: minimum extension rule of 30 days; calculated as (increased/ original) × original period
Documentation: follow ATC; EMD amount and validity not disclosed in provided data
Not specified in available data; verify in ATC and final contract
Delivery starts from the last date of the original delivery order; extension time formula applies with minimum 30 days
Not specified in data; refer to ATC for LD or penalties if late
Experience in supplying boiler auxiliary components or industrial fans
Financial capacity to handle contract value (as per ATC)
Compliance with option clause regarding quantity adjustments
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply of New I. D. Fan with Shaft and pully of WIL Boiler Capacity 20 Ton. Fan Balanced hard face in
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Nuclear Power Corporation Of India Limited
SURAT, GUJARAT
Indian Army
LEH, JAMMU & KASHMIR
Nuclear Power Corporation Of India Limited
UTTARA KANNADA, KARNATAKA
Hindustan Petroleum Corporation Ltd
VISAKHAPATNAM, ANDHRA PRADESH
Indian Army
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar I. D. fan/boiler component supply
Financial statements or turnover proof
EMD/Security deposit documentation (as per ATC)
Technical bid documents and compliance statements
OEM authorization or supplier authorization (if applicable)
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience proofs, financials, and EMD as specified in the ATC. The procurement covers a 20 Ton WIL boiler fan with shaft and pulley, balanced with hard-face. Ensure OEM authorization if required and compliance with the option clause allowing ±25% quantity variation at contract rates.
Submit GST registration, PAN card, recent experience certificates for boiler components, financial statements, EMD document, technical bid, and OEM authorization if you are a subcontractor. ATC governs additional documents; ensure all files are clear, legible, and properly signed.
Delivery timing aligns with the last date of the original delivery order; if the purchaser exercises the option clause, additional time is (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
Not specified in current tender data; verify in ATC. The fan must be balanced with hard-face finishing for WIL boiler, but exact IS/ISO standards are not listed; confirm during bid submission and supplier qualification.
Bid quantity may be increased or decreased by up to 25% during contract execution at the same contracted rates. This option clause requires bidders to price for potential upsizing and supply planning accordingly.
EMD amount is not disclosed in the provided data; bidders should refer to the ATC document or portal notices to obtain the exact EMD value and payment method.
BOQ items are not listed in the current tender data. Check the ATC uploaded document and the official portal for the complete BOQ, quantity, and itemized specifications before bidding.
Delivery terms are tied to the original order date; the option clause may extend the period. Minimum extension time is 30 days; calculations depend on the ratio of increased to original quantity.
Indian Navy
Meja Urja Nigamplimited
📍 ALLAHABAD, UTTAR PRADESH
Department of Sugar
📍 THIRUVALLUR, TAMIL NADU
Bharat Heavy Electricals Limited (bhel)
📍 VELLORE, TAMIL NADU
Directorate Urban Administration and Development
📍 GWALIOR, MADHYA PRADESH
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS