Fuel Transfer Pump,Bearing Coupling,C R Injector,Servo Cylinder Tie Rod,Repair Kit for Servo Steeri
Indian Army
GANGANAGAR, RAJASTHAN
Progress
Quantity
17
Category
SYNCHRONISING CONE
Bid Type
Two Packet Bid
The Indian Army, Department of Military Affairs, seeks procurement of multiple vehicle/systems components including SYNCHRONISING CONE, SYNCHRONISING SLEEVE, SPRING LEAF, SHOCK ABSORBER, REGULATOR ASSY LH, PUMP HYDRAULIC RAM, TERMINAL MAIN POSITIVE, and PARTS KIT POWER STEERING. The purchase location is ALWAR, RAJASTHAN (301001). The BOQ lists 8 items though exact quantities are not disclosed. An option clause allows ±25% quantity variation at contract award and during the currency of the contract, with delivery extensions calculated as (additional quantity/original quantity) × original delivery period, minimum 30 days. Sample approval is required prior to delivery.
8 BOQ items with undisclosed quantities
Sample sets required prior to delivery
Option to increase/decrease quantity up to 25%
Delivery timing linked to original delivery period with 30-day minimum extension
No explicit standards listed; emphasize OEM compatibility and testing data
Option quantity variation up to 25%
Sample approval before delivery
8 items in BOQ with no disclosed quantities
Delivery period starts from last date of original delivery order; added time for exercised quantity equals (additional/original) × original period, min 30 days; extended duration may be capped to original period
Purchaser may increase/decrease quantity by up to 25% at contract placement and during currency at contracted rates
Sample sets must be supplied and approved before final delivery
Experience in supplying defense-grade hydraulic and steering components
OEM authorization or demonstrated capability to supply direct replacements
Financial stability sufficient to undertake contract with potential 25% quantity variation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SYNCHRONISING CONE , SYNCHRONISING SLEEVE , SPRING LEAF , SHOCK ABSORBER , REGULATOR ASSY LH , PUMP HYDRAULIC RAM , TERMINAL MAIN POSITIVE , PARTS KIT POWER STEERING
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Alwar
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Alwar | Alwar | - | - | 6 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
GANGANAGAR, RAJASTHAN
Indian Army
UDAIPUR, RAJASTHAN
Indian Army
PITHORAGARH, UTTARAKHAND
Indian Army
Indian Army
BHOPAL, MADHYA PRADESH
Tender Results
Loading results...
SYNCHRONISING CONE
ITEM FOR TATA VEHICLE GENUINE PARTS
SYNCHRONISING SLEEVE
ITEM FOR TATA VEHICLE GENUINE PARTS
SPRING LEAF
ITEM FOR STLN VEHICLE GENUINE PARTS
SHOCK ABSORBER
ITEM FOR STLN VEHICLE GENUINE PARTS
REGULATOR ASSY LH
ITEM FOR STLN VEHICLE GENUINE PARTS
PUMP HYDRAULIC RAM
ITEM FOR STLN VEHICLE GENUINE PARTS
TERMINAL MAIN POSITIVE
ITEM FOR STLN VEHICLE GENUINE PARTS
PARTS KIT POWER STEERING
ITEM FOR STLN VEHICLE GENUINE PARTS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SYNCHRONISING CONE | ITEM FOR TATA VEHICLE GENUINE PARTS | 6 | pieces | oictss2 | 15 | |
| 2 | SYNCHRONISING SLEEVE | ITEM FOR TATA VEHICLE GENUINE PARTS | 2 | pieces | oictss2 | 15 | |
| 3 | SPRING LEAF | ITEM FOR STLN VEHICLE GENUINE PARTS | 1 | pieces | oictss2 | 15 | |
| 4 | SHOCK ABSORBER | ITEM FOR STLN VEHICLE GENUINE PARTS | 2 | pieces | oictss2 | 15 | |
| 5 | REGULATOR ASSY LH | ITEM FOR STLN VEHICLE GENUINE PARTS | 1 | pieces | oictss2 | 15 | |
| 6 | PUMP HYDRAULIC RAM | ITEM FOR STLN VEHICLE GENUINE PARTS | 1 | pieces | oictss2 | 15 | |
| 7 | TERMINAL MAIN POSITIVE | ITEM FOR STLN VEHICLE GENUINE PARTS | 3 | pieces | oictss2 | 15 | |
| 8 | PARTS KIT POWER STEERING | ITEM FOR STLN VEHICLE GENUINE PARTS | 1 | pieces | oictss2 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates of defense-grade supply
Financial statements (audited if available)
EMD submission proof or security deposit
Technical bid documents and OEM authorizations
Product data sheets and sample submission status
Manufacturer/Supplier certifications and quality compliance documents
Key insights about RAJASTHAN tender market
Bidders should prepare OEM authorizations, GST registration, PAN, financial statements, and EMD as required by terms. Provide technical conformity evidence, sample sets for pre-delivery approval, and proof of capability to supply 8 listed items including Synchronising Cone and Pump Hydraulic Ram. Ensure adherence to the 25% quantity variation clause and delivery schedule.
Submit GST certificate, PAN card, business registration, experience certificates for defense-grade components, financial statements for last 2–3 years, EMD receipt or security deposit, technical compliance certificates, and OEM authorization letters if representing a brand or OEM. Include sample submission details per ATC clause.
No explicit technical specs are published; bidders should provide OEM datasheets, compatibility notes for Synchronising Cone and Synchronising Sleeve, and test data demonstrating fit within power steering and hydraulic ram assemblies. Include related dimensions, tolerances, and material compliance where possible.
Delivery starts after original delivery order; if quantities increase, extended time is calculated as (additional/original) × original period with a minimum of 30 days. Exact original period is not disclosed; bidders should plan for phased delivery aligned to Army requirements.
EMD details are not disclosed in the available data. Bidders should monitor portal updates for the exact EMD amount or percentage and prepare payment via online modes or DD as specified in the final tender terms.
Eligibility requires prior defense-grade supply experience, OEM authorization, GSTIN, PAN, audited financial statements, and proof of past performance. Attach certificates for quality management and any relevant ISO/IS standards that demonstrate compliance with Army procurement norms.
Payment terms are not fully disclosed in the provided data. Bid submissions should anticipate standard government terms: milestone payments on delivery, or post-delivery within 30–45 days, and compliance with EMD and sample verification obligations. Await final terms in the official tender document.
Prepare a complete sample package including 8 item categories, OEM data sheets, material specs, and testing results. Submit for Army sample approval prior to dispatch. Ensure the samples reflect the exact models and configurations proposed for contract quantities.
Indian Army
📍 ALWAR, RAJASTHAN
Indian Army
📍 BIKANER, RAJASTHAN
Indian Army
📍 SONITPUR, ASSAM
Indian Army
📍 EAST SIKKIM, SIKKIM
Indian Army
📍 CHAMOLI, UTTARAKHAND
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS