Z1/R72 MISC-TADIRAN-2090-0925 H-250/U HAND SET
Indian Army
Progress
Quantity
29
Category
Z1 5985 012416 COVER BASE MAST 11
Bid Type
Two Packet Bid
Organization: Indian Army (Department of Military Affairs) in Hisar, Haryana. Procurement targets include COVER BASE MAST 11 and TADIRAN 2090 09252 00 H 250 U HAND SET components. EMD is ₹39,000. The contract includes a drawing approval process: submit Detailed Design Drawings within 5 days of award; buyer to approve or request modifications within 5 days; delay in approval extends delivery without L.D.
Product names: COVER BASE MAST items, HAND SET units
Estimated value: Not disclosed
EMD amount: ₹39,000
Delivery: Flexible per option clause; baseline starts after drawings/samples approval
Standards/certifications: Not specified in tender data; compliance with buyer-approved drawings and samples required
Quality: Approval of detailed design drawings and advance samples required
Advance Detailed Design Drawings to be submitted within 5 days of award
Option clause allows ±50% quantity variation with adjusted delivery
Post-receipt inspection at consignee site; pre-dispatch not specified
Advance sample approval within 5 days; modifications may be requested
Delivery period may extend if buyer delays in approvals; LD not charged for buyer delay
Not explicitly stated; evaluate post-drawings approval and delivery schedule in bid submission; ensure alignment with buyer-approved terms
Delivery starts after approval of drawings/samples; option clause enables up to 50% quantity changes with calculation-based extension
No LD specified for buyer delay; delivery period refixed without LD during drawing/sample approval delays
Ability to supply cover base mast and hand set components per buyer-approved drawings
Experience in military/defense procurement preferred
Financial capability to meet ₹39,000 EMD and project costs
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Z1 5985 012416 COVER BASE MAST 11 , Z1 R72 MISC TADIRAN 2090 09252 00 H 250 U HAND SET
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
KANGRA, HIMACHAL PRADESH
Indian Army
KANGRA, HIMACHAL PRADESH
Indian Army
JALANDHAR, PUNJAB
Indian Army
AGRA, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates
Financial statements
EMD document (₹39,000)
Technical bid documents
OEM authorizations (if applicable)
Key insights about HARYANA tender market
Bidders must submit Detailed Design Drawings within 5 days of award and obtain buyer approval or modification list within 5 days. Provide advance samples within 5 days for approval. Ensure compliance with the approved drawings and samples and be prepared for up to 50% quantity variation as per the option clause.
Prepare GST certificate, PAN card, experience certificates, financial statements, and EMD ₹39,000. Include technical bid documents and OEM authorizations if applicable. Ensure submission aligns with terms requiring approved drawings and advance samples before bulk manufacturing.
Delivery is linked to drawing and advance sample approvals. If approvals delay, the delivery period is refixed without LD. The option clause permits up to 50% quantity variation with a proportional extension of the delivery timeline.
The tender data does not specify explicit standards; bidders must comply with buyer-approved designs and samples. Expect alignment with military packaging and performance criteria as implied by the Detailed Design Drawings submission requirement.
Purchaser may increase or decrease quantity up to 50% at contract placement or during currency. Additional time is calculated as (increase in quantity/original quantity) × original delivery period, with a minimum of 30 days, subject to contract terms.
Advance samples must be submitted within 5 days of award. Buyer will approve or list modifications within 5 days. Bulk manufacturing begins only after approval; delays in sample approval extend the delivery period without LD.
Indian Army
📍 HISAR, HARYANA
Indian Army
📍 HISAR, HARYANA
Indian Army
📍 HISAR, HARYANA
Rashtriya Ispat Nigam Limited
📍 VISAKHAPATNAM, ANDHRA PRADESH
Bharat Earth Movers Limited (beml)
📍 BANGALORE, KARNATAKA
Sign up now to access all documents
Main Document
OTHER
ATC
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS