TenderDekho Logo
GEM

Government Tender Published for 1 ANGLE WITH FLANGE,2 BLOCK,3 BODY,4 BODY,5 BODY,6 BODY,7 BODY,8 BODY,9 BODY,10 BODY,11 BODY,12 BOD in NASHIK, MAHARASHTRA

Bid Publish Date

10-Jun-2026, 5:07 pm

Bid End Date

01-Jul-2026, 5:00 pm

Progress

Issue10-Jun-2026, 5:07 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

3885

Category

1 ANGLE WITH FLANGE

Bid Type

Two Packet Bid

Categories 13

Hindustan Aeronautics Limited (hal) invites bids for 1 ANGLE WITH FLANGE, 2 BLOCK, 3 BODY, 4 BODY, 5 BODY, 6 BODY, 7 BODY, 8 BODY, 9 BODY, 10 BODY, 11 BODY, 12 BODY, 13 BODY, 14 BODY, 15 BODY, 16 BODY, 17 BODY OF LOCK ON STRINGER LH, 18 BODY OF LOCK ON STRINGER RH, 19 BODY OF LOCK ON STRINGER 23 L-H, 20 BODY OF LOCK ON STRINGER 23 R-H, 21 BODY OF LOCK ON STRINGER 6 R-H, 22 BOLT, 23 BRACKET, 24 BRANCH PIPE, 25 BRANCH PIPE, 26 BREAKING BOLT, 27 BUSH, 28 BUSH, 29 BUSH, 30 BUSH, 31 BUSH, 32 BUSH, 33 BUSH, 34 BUSH, 35 BUSH, 36 CAP, 37 CONE, 38 CONE, 39 CONE, 40 COUPLING, 41 COVER, 42 CUPL-H, 43 END PIECE, 44 FLANGE, 45 FLANGE, 46 FLANGE, 47 FLANGE, 48 FLANGE, 49 FLANGE, 50 FLANGE, 51 FLANGE, 52 FLANGE, 53 FLANGE, 54 FLANGE, 55 FLANGE, 56 FLANGE, 57 FLANGE, 58 FLANGE, 59 FLANGE, 60 FLANGE, 61 FLANGE, 62 FLANGE, 63 FLANGE, 64 FLANGE, 65 FLANGE, 66 FLANGE, 67 FLANGED ANGLE PLATE, 68 HATCH, 69 HOOK, 70 NUT, 71 NUT, 72 NUT, 73 NUT, 74 NUT, 75 NUT, 76 PACKING, 77 PIN, 78 PIPE, 79 PIPE, 80 PIPE, 81 PIPE, 82 PIPE, 83 PIPE, 84 PIPE 5-25-1-5-885-OST1-12791- 77, 85 PIPE CONNECTION, 86 PIPE5-20-1-5-445-OST1- 12791-77, 87 PLUG, 88 PROFILE, 89 RADIUS WASHER, 90 RADIUS WASHER, 91 RAM ROD, 92 RAM ROD, 93 RING, 94 RING, 95 RING, 96 ROD, 97 ROD, 98 ROD, 99 ROD, 100 ROD, 101 ROD, 102 ROD, 103 SCREW, 104 SHAFT, 105 SPACER, 106 SPACER, 107 SPACER, 108 SPACER, 109 SPACER, 110 SPACER, 111 SPACER, 112 spacer, 113 SPECIAL NUT, 114 SPLIT PIN, 115 STUD, 116 STUD, 117 STUD, 118 T PIECE, 119 TECH- CENTER, 120 TECH- CENTER, 121 TECH- CENTER, 122 TECH- CENTER, 123 TECH- CENTRE, 124 TECH-CENTER, 125 TECH-CENTRE, 126 TECH-CENTRE, 127 TECH-CENTRE, 128 THROTTLE, 129 T-PIECE, 130 T-PIECE 1-6 OST1-13883-81, 131 TUBE, 132 TUBE, 133 WASHER in NASHIK, MAHARASHTRA. Quantity: 3885. Submission Deadline: 01-07-2026 17: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

1 ANGLE WITH FLANGE , 2 BLOCK , 3 BODY , 4 BODY , 5 BODY , 6 BODY , 7 BODY , 8 BODY , 9 BODY , 10 BODY , 11 BODY , 12 BODY , 13 BODY , 14 BODY , 15 BODY , 16 BODY , 17 BODY OF LOCK ON STRINGER LH , 18 BODY OF LOCK ON STRINGER RH , 19 BODY OF LOCK ON STRINGER 23 L-H , 20 BODY OF LOCK ON STRINGER 23 R-H , 21 BODY OF LOCK ON STRINGER 6 R-H , 22 BOLT , 23 BRACKET , 24 BRANCH PIPE , 25 BRANCH PIPE , 26 BREAKING BOLT , 27 BUSH , 28 BUSH , 29 BUSH , 30 BUSH , 31 BUSH , 32 BUSH , 33 BUSH , 34 BUSH , 35 BUSH , 36 CAP , 37 CONE , 38 CONE , 39 CONE , 40 COUPLING , 41 COVER , 42 CUPL-H , 43 END PIECE , 44 FLANGE , 45 FLANGE , 46 FLANGE , 47 FLANGE , 48 FLANGE , 49 FLANGE , 50 FLANGE , 51 FLANGE , 52 FLANGE , 53 FLANGE , 54 FLANGE , 55 FLANGE , 56 FLANGE , 57 FLANGE , 58 FLANGE , 59 FLANGE , 60 FLANGE , 61 FLANGE , 62 FLANGE , 63 FLANGE , 64 FLANGE , 65 FLANGE , 66 FLANGE , 67 FLANGED ANGLE PLATE , 68 HATCH , 69 HOOK , 70 NUT , 71 NUT , 72 NUT , 73 NUT , 74 NUT , 75 NUT , 76 PACKING , 77 PIN , 78 PIPE , 79 PIPE , 80 PIPE , 81 PIPE , 82 PIPE , 83 PIPE , 84 PIPE 5-25-1-5-885-OST1-12791- 77 , 85 PIPE CONNECTION , 86 PIPE5-20-1-5-445-OST1- 12791-77 , 87 PLUG , 88 PROFILE , 89 RADIUS WASHER , 90 RADIUS WASHER , 91 RAM ROD , 92 RAM ROD , 93 RING , 94 RING , 95 RING , 96 ROD , 97 ROD , 98 ROD , 99 ROD , 100 ROD , 101 ROD , 102 ROD , 103 SCREW , 104 SHAFT , 105 SPACER , 106 SPACER , 107 SPACER , 108 SPACER , 109 SPACER , 110 SPACER , 111 SPACER , 112 spacer , 113 SPECIAL NUT , 114 SPLIT PIN , 115 STUD , 116 STUD , 117 STUD , 118 T PIECE , 119 TECH- CENTER , 120 TECH- CENTER , 121 TECH- CENTER , 122 TECH- CENTER , 123 TECH- CENTRE , 124 TECH-CENTER , 125 TECH-CENTRE , 126 TECH-CENTRE , 127 TECH-CENTRE , 128 THROTTLE , 129 T-PIECE , 130 T-PIECE 1-6 OST1-13883-81 , 131 TUBE , 132 TUBE , 133 WASHER

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9450081.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Elbow 45 Degree 1,Elbow Seamless Butt weld Long radius,Concentric reducer Butt weld Dia1 12,Equal t

Hindustan Petroleum Corporation Ltd

Posted: 25 November 2024
Closed: 5 December 2024
GEM

Seamless Pipe, Carbon steel, Sch 40, Size 25 NB,Seamless Pipe, Carbon steel, Sch 40, Size 50 NB,Sea

Balmer Lawrie And Company Limited

KOLKATA, WEST BENGAL

Posted: 12 August 2025
Closed: 28 August 2025
GEM

BEARING COVER 037 405 SM 014,RING 037 405 SM 015,RING 037 405 SM 016,RING 037 405 SM 017,LOCKING RI

Bokaro Steel Plant

BOKARO, JHARKHAND

Posted: 1 January 2025
Closed: 17 March 2025
GEM

Reel Spring,Air Filter,Feeder Slats,C 130,Flat,UC 205 patti,UC 206 patti,Third Arm Bolt,Prong Nut B

Agriculture Department

Posted: 26 May 2025
Closed: 10 June 2025
GEM

PIN,DWN 05265242,LINK,DWN 05265251,PIN,DWN 05265252,SCREW,DWN 05265131,PIECE,EXTENSION,DWN 05265132

Bokaro Steel Plant

BOKARO, JHARKHAND

Posted: 23 June 2025
Closed: 14 July 2025
GEM

Bill of Quantities (BOQ) 133 Items Sign in for GEM prices

#1

1 ANGLE WITH FLANGE

11.6130.3.801.900

30 nos Delivery: 300 days
#2

2 BLOCK

11.7220.I.230.001

30 nos Delivery: 300 days
#3

3 BODY

11.0200.I.136.001

60 nos Delivery: 300 days
#4

4 BODY

11.0200.I.136.005

15 nos Delivery: 300 days
#5

5 BODY

11.0740.3.241.900

15 nos Delivery: 300 days
#6

6 BODY

11.0770.I.145.001

30 nos Delivery: 300 days
#7

7 BODY

11.6120.1.106.001

45 nos Delivery: 300 days
#8

8 BODY

11.6120.I.065.001

15 nos Delivery: 300 days
#9

9 BODY

11.6140.3.151.900

30 nos Delivery: 300 days
#10

10 BODY

11.6140.I.005.001

30 nos Delivery: 300 days
#11

11 BODY

11.6140.I.005.003

45 nos Delivery: 300 days
#12

12 BODY

11.7404.I.131.900

15 nos Delivery: 300 days
#13

13 BODY

11.7404.W.336.900

15 nos Delivery: 300 days
#14

14 BODY

11.8106.3.820.002

30 nos Delivery: 300 days
#15

15 BODY

11.8106.3.820.003

30 nos Delivery: 300 days
#16

16 BODY

E10.0730.3030.001

30 nos Delivery: 300 days
#17

17 BODY OF LOCK ON STRINGER LH

11.0201.3.824.900

15 nos Delivery: 300 days
#18

18 BODY OF LOCK ON STRINGER RH

11.0201.3.823.900

15 nos Delivery: 300 days
#19

19 BODY OF LOCK ON STRINGER 23 L-H

11.0201.I.028.900

15 nos Delivery: 300 days
#20

20 BODY OF LOCK ON STRINGER 23 R-H

11.0201.I.027.900

15 nos Delivery: 300 days
#21

21 BODY OF LOCK ON STRINGER 6 R-H

11.0201.3.829.900

15 nos Delivery: 300 days
#22

22 BOLT

11.8108.3.003.900

30 nos Delivery: 300 days
#23

23 BRACKET

11.0795.0.035.001

30 nos Delivery: 300 days
#24

24 BRANCH PIPE

11.5313.7.055.001

90 nos Delivery: 300 days
#25

25 BRANCH PIPE

11.7233.3.801.001

15 nos Delivery: 300 days
#26

26 BREAKING BOLT

11.9265.I.084.900

120 nos Delivery: 300 days
#27

27 BUSH

675994737658

15 nos Delivery: 300 days
#28

28 BUSH

11.1100.I.106.900

30 nos Delivery: 300 days
#29

29 BUSH

11.1230.I.146.900

60 nos Delivery: 300 days
#30

30 BUSH

11.4804.3.604.900

30 nos Delivery: 300 days
#31

31 BUSH

11.5106.I.031.900

30 nos Delivery: 300 days
#32

32 BUSH

11.5205.0.031.900

30 nos Delivery: 300 days
#33

33 BUSH

E10.0631.0813.900

30 nos Delivery: 300 days
#34

34 BUSH

N430-8401-0005

30 nos Delivery: 300 days
#35

35 BUSH

N430-8401-0007

30 nos Delivery: 300 days
#36

36 CAP

N430-7724-0028

15 nos Delivery: 300 days
#37

37 CONE

11.7121.2.058.900

30 nos Delivery: 300 days
#38

38 CONE

30.7600.0276.001

15 nos Delivery: 300 days
#39

39 CONE

30.7600.0276.013

15 nos Delivery: 300 days
#40

40 COUPLING

11.7510.1.304.001

30 nos Delivery: 300 days
#41

41 COVER

11.0740.3.894.900

15 nos Delivery: 300 days
#42

42 CUPL-H

11.0620.I.581.002

15 nos Delivery: 300 days
#43

43 END PIECE

E10.0730.3015.001

15 nos Delivery: 300 days
#44

44 FLANGE

11.6100.3.019.900

15 nos Delivery: 300 days
#45

45 FLANGE

11.6100.3.073.900

15 nos Delivery: 300 days
#46

46 FLANGE

11.6100.3.827.900

15 nos Delivery: 300 days
#47

47 FLANGE

11.6100.3.961.900

15 nos Delivery: 300 days
#48

48 FLANGE

11.6101.3.087.900

15 nos Delivery: 300 days
#49

49 FLANGE

11.6110.1.116.900

15 nos Delivery: 300 days
#50

50 FLANGE

11.6110.3.022.900

15 nos Delivery: 300 days
#51

51 FLANGE

11.6110.5.027.900

60 nos Delivery: 300 days
#52

52 FLANGE

11.6110.I.022.900

15 nos Delivery: 300 days
#53

53 FLANGE

11.6121.I.074.900

30 nos Delivery: 300 days
#54

54 FLANGE

11.6123.3.038.900

60 nos Delivery: 300 days
#55

55 FLANGE

11.6125.3.251.900

30 nos Delivery: 300 days
#56

56 FLANGE

11.6130.3.018.900

15 nos Delivery: 300 days
#57

57 FLANGE

11.6170.3.302.900

15 nos Delivery: 300 days
#58

58 FLANGE

11.6170.3.809.900

30 nos Delivery: 300 days
#59

59 FLANGE

11.7404.W.826.900

15 nos Delivery: 300 days
#60

60 FLANGE

11.7420.I.268.900

15 nos Delivery: 300 days
#61

61 FLANGE

11.7601.I.032.900

15 nos Delivery: 300 days
#62

62 FLANGE

11.7920.0.011.900

15 nos Delivery: 300 days
#63

63 FLANGE

30.6100.0006.013

15 nos Delivery: 300 days
#64

64 FLANGE

30.6100.0017.005

30 nos Delivery: 300 days
#65

65 FLANGE

30.6100.0212.005

15 nos Delivery: 300 days
#66

66 FLANGE

30.6100.0213.007

15 nos Delivery: 300 days
#67

67 FLANGED ANGLE PLATE

11.6200.I.801.900

15 nos Delivery: 300 days
#68

68 HATCH

E10.0730.3024.900

30 nos Delivery: 300 days
#69

69 HOOK

N430-8700-0018

30 nos Delivery: 300 days
#70

70 NUT

11.0200.1.812.900

30 nos Delivery: 300 days
#71

71 NUT

11.0770.4.224.900

15 nos Delivery: 300 days
#72

72 NUT

11.0770.4.533.900

30 nos Delivery: 300 days
#73

73 NUT

11.6801.I.203.900

30 nos Delivery: 300 days
#74

74 NUT

30.6100.8073.900

45 nos Delivery: 300 days
#75

75 NUT

E10.0730.4092.900

15 nos Delivery: 300 days
#76

76 PACKING

11.8104.3.930.001

15 nos Delivery: 300 days
#77

77 PIN

N430-8700-0019

30 nos Delivery: 300 days
#78

78 PIPE

11.4208.7.031.900

30 nos Delivery: 300 days
#79

79 PIPE

11.4930.3.210.001

15 nos Delivery: 300 days
#80

80 PIPE

11.5301.I.065.001

30 nos Delivery: 300 days
#81

81 PIPE

11.5313.7.055.003

30 nos Delivery: 300 days
#82

82 PIPE

11.7751.0.017.900

30 nos Delivery: 300 days
#83

83 PIPE

3.12791.007851.9

15 nos Delivery: 300 days
#84

84 PIPE 5-25-1-5-885-OST1-12791-77

3.12791.007850.9

15 nos Delivery: 300 days
#85

85 PIPE CONNECTION

11.7603.W.831.900

15 nos Delivery: 300 days
#86

86 PIPE5-20-1-5-445-OST1-12791-77

3.12791.007852.9

15 nos Delivery: 300 days
#87

87 PLUG

11.6121.I.241.900

15 nos Delivery: 300 days
#88

88 PROFILE

N430-8804-0001

60 nos Delivery: 300 days
#89

89 RADIUS WASHER

11.0446.J.404.005

120 nos Delivery: 300 days
#90

90 RADIUS WASHER

11.0446.J.404.007

60 nos Delivery: 300 days
#91

91 RAM ROD

11.0446.0.094.900

60 nos Delivery: 300 days
#92

92 RAM ROD

11.0446.3.476.900

180 nos Delivery: 300 days
#93

93 RING

11.1100.I.104.900

60 nos Delivery: 300 days
#94

94 RING

11.5313.3.264.900

30 nos Delivery: 300 days
#95

95 RING

30.9018.0115.001

60 nos Delivery: 300 days
#96

96 ROD

11.5100.I.065.001

30 nos Delivery: 300 days
#97

97 ROD

11.5200.I.450.001

30 nos Delivery: 300 days
#98

98 ROD

11.5200.I.450.003

60 nos Delivery: 300 days
#99

99 ROD

11.5301.I.236.900

15 nos Delivery: 300 days
#100

100 ROD

30.5200.8070.001

60 nos Delivery: 300 days
#101

101 ROD

30.7200.1115.001

15 nos Delivery: 300 days
#102

102 ROD

E10.0730.3027.900

30 nos Delivery: 300 days
#103

103 SCREW

11.7720.I.811.900

15 nos Delivery: 300 days
#104

104 SHAFT

11.6800.W.004.900

75 nos Delivery: 300 days
#105

105 SPACER

30.5100.8031.039

30 nos Delivery: 300 days
#106

106 SPACER

30.5100.8031.044

60 nos Delivery: 300 days
#107

107 SPACER

30.5100.8031.053

60 nos Delivery: 300 days
#108

108 SPACER

30.5100.8031.060

15 nos Delivery: 300 days
#109

109 SPACER

30.5100.8031.064

30 nos Delivery: 300 days
#110

110 SPACER

30.5100.8031.065

15 nos Delivery: 300 days
#111

111 SPACER

30.5100.8031.066

15 nos Delivery: 300 days
#112

112 spacer

30.5100.8031.068

30 nos Delivery: 300 days
#113

113 SPECIAL NUT

N430-8401-0003

45 nos Delivery: 300 days
#114

114 SPLIT PIN

30.7810.0150.001

15 nos Delivery: 300 days
#115

115 STUD

11.0770.4.176.001

15 nos Delivery: 300 days
#116

116 STUD

11.0770.4.176.003

15 nos Delivery: 300 days
#117

117 STUD

11.0770.4.176.005

15 nos Delivery: 300 days
#118

118 T PIECE

11.6130.3.823.900

30 nos Delivery: 300 days
#119

119 TECH- CENTER

TC-11.5313.3.735.901

30 nos Delivery: 300 days
#120

120 TECH- CENTER

TC-11.5313.3.735.903

30 nos Delivery: 300 days
#121

121 TECH- CENTER

TC-11.5313.3.745.901

15 nos Delivery: 300 days
#122

122 TECH- CENTER

TC-11.5313.3.745.903

15 nos Delivery: 300 days
#123

123 TECH- CENTRE

TC-11.5301.I.070.000

30 nos Delivery: 300 days
#124

124 TECH-CENTER

TC-11.5313.7.075.000

15 nos Delivery: 300 days
#125

125 TECH-CENTRE

TC-11.5301.I.080.000

15 nos Delivery: 300 days
#126

126 TECH-CENTRE

TC-11.5313.7.060.901

15 nos Delivery: 300 days
#127

127 TECH-CENTRE

TC-11.5313.7.060.902

15 nos Delivery: 300 days
#128

128 THROTTLE

11.6140.4.847.900

30 nos Delivery: 300 days
#129

129 T-PIECE

N330-0740-0004

15 nos Delivery: 300 days
#130

130 T-PIECE 1-6 OST1-13883-81

3.13883.8030106

15 nos Delivery: 300 days
#131

131 TUBE

11.5200.I.340.001

15 nos Delivery: 300 days
#132

132 TUBE

11.5200.I.340.003

15 nos Delivery: 300 days
#133

133 WASHER

11.6600.3.820.005

15 nos Delivery: 300 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

2

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found

1 INSERT,2 UPPER STOPPER,3 NUT,4 NUT,5 FORKED ADOPTER,6 WASHER,7 TUBE,8 LEVER,9 FORK,10 FORK,11 COV

Hindustan Aeronautics Limited (hal)

📍 NASHIK, MAHARASHTRA

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

1 ANGLE PLATE,2 ANGLE PLATE,3 CLAMP,4 GASKET,5 FLANGE,6 BRACKET,7 BRACKET,8 BRACKET,9 PANEL,10 SPAC

Hindustan Aeronautics Limited (hal)

📍 NASHIK, MAHARASHTRA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

MS ERW 250NB,MS ERW 200NB,MS ERW 150 Nnb,MS ERW 75 NB,SORF FLANGE 100 NB 150,SORF FLANGE 150 NB 150

Hindustan Petroleum Corporation Ltd

📍 KOTA, RAJASTHAN

EMD: ₹1.0 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

Al. Tower Bolt 4 inch,Al. Tower Bolt 6 inch,Al. Tower Bolt 8 inch,Al. Sliding Bolt 8 inch,Al. Handl

Indian Institute Of Technology (iit)

📍 WEST DELHI, DELHI

EMD: ₹48,594
Est: ₹24.3 L
⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM
Urgent

Indian Army Kangra Himachal Pradesh Procurement: 44 Automotive Spares & Components ISO 9001 Bid 2026

Indian Army

📍 KANGRA, HIMACHAL PRADESH

Est: ₹1.5 L
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM