Hindustan Petroleum Corporation Ltd Oil Mist Eliminator Filter Tender 2026 - GST & ATC Requirements
Hindustan Petroleum Corporation Ltd
VISAKHAPATNAM, ANDHRA PRADESH
Bid Publish Date
10-Jun-2026, 11:50 am
Bid End Date
26-Jun-2026, 12:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Bharat Electronics Limited (Department Of Defence Production) invites bids for an Oil Mist Extractor (2000 CMH) to be supplied and installed at BEL Machilipatnam. The scope includes the Oil Mist extractor with Filter Performance Monitor as standard for each item, with delivery FOR BEL-Machilipatnam and installation/commissioning. The contract allows quantity variation up to 25% of bid quantity, at contracted rates, with delivery periods adjusted accordingly. Quoted price must be all-inclusive (transport, insurance, taxes, duties). A two-year warranty is specified post-installation, and a service engineer must respond within 48 hours for warranty repairs. Delivery is within 1-2 weeks ARO and installation within 15 days of receipt.
Oil Mist Extractor, capacity: 2000 CMH
Standard accessory: Filter Performance Monitor
Delivery terms: FOR BEL-Machilipatnam, Door Delivery
Delivery period: 1-2 Weeks At Receipt Of Order (ARO)
Warranty: 2 years on system; service engineer within 48 hours
Installation: 15 days from receipt at BEL Machilipatnam factory
Compliance documentation: Make/Model and technical specifications required
25% quantity variation allowed during order and currency with contracted rates
All-inclusive price; no later price changes accepted
Two-year warranty; 48-hour service engineer response
Delivery FOR BEL-Machilipatnam; installation within 15 days
Submission of Compliance Statement and OEM authorization
Quoted price must be inclusive of all components; no price variation once bid is submitted.
Delivery to BEL Machilipatnam within 1-2 weeks ARO; installation within 15 days of receipt.
Warranty breach extends the effective warranty period; breakdowns >15 days cumulatively trigger extension.
Experience in supplying/ installing oil mist extraction systems or equivalent air filtration equipment
Ability to provide OEM authorization and after-sales service within 48 hours
Demonstrated capacity to deliver and install within specified 1-2 weeks ARO and 15-day installation window
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Oil Mist Extractor ( 2000 CMH)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Petroleum Corporation Ltd
VISAKHAPATNAM, ANDHRA PRADESH
NTPC Limited
AMBEDKAR NAGAR, UTTAR PRADESH
Hmt Machine Tools Limited
BANGALORE, KARNATAKA
Ntpc Tamilnadu Energy Company Ltd
TIRUVALLUR, TAMIL NADU
Indian Council Of Agricultural Research (icar)
KARNAL, HARYANA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience Certificates (relevant to oil mist extraction or industrial air filtration)
Financial Statements (last 3 years or as specified)
EMD/Security Deposit documentation (if applicable)
Technical Compliance Certificates (as per tender terms)
OEM Authorization / Manufacturer’s Authorization Letter
Product Make/Model details and technical specifications
Compliance Statement against attached Terms and Conditions
Extended Deadline
26-Jun-2026, 12:00 pm
Opening Date
26-Jun-2026, 12:30 pm
Extended Deadline
23-Jun-2026, 12:00 pm
Opening Date
23-Jun-2026, 12:30 pm
Key insights about ANDHRA PRADESH tender market
Bidders must submit a technical bid with a Compliance Statement for the attached terms, include Make/Model and technical specifications, and provide OEM authorization. Ensure price is all-inclusive for logistics, taxes, and duties. Delivery is 1-2 weeks ARO to BEL Machilipatnam, with 15-day installation and 2-year warranty.
Required documents include GST registration, PAN, experience certificates in similar projects, financial statements, OEM authorization, technical bid with Make/Model, and a Compliance Statement. EMD details (if any) and service capability documentation may be requested during bid evaluation.
Key specs include 2000 CMH air handling capability, inclusion of a Filter Performance Monitor as standard, and compliance with installation at BEL Machilipatnam. The model must be accompanied by Make/Model details and technical specifications in the bid, with 2-year warranty covering the system.
Delivery terms are FOR BEL-Machilipatnam with door delivery; supplier bears transport and insurance costs. The delivery window is 1-2 weeks ARO, and installation must be completed within 15 days of item receipt at BEL Machilipatnam factory.
The system carries a two-year warranty from successful installation; supplier must dispatch a service engineer within 48 hours of intimation for warranty repairs and provide minimum spare parts to maintain operation. Prolonged breakdowns aggregating beyond 15 days extend the warranty period.
The purchaser may increase or decrease quantity up to 25% of the bid quantity at contracted rates. During the currency of the contract, additional quantity can be ordered with the same rates, subject to minimum delivery adjustments and overall delivery period constraints.
Bharat Electronics Limited (bel)
📍 KRISHNA, ANDHRA PRADESH
Bharat Electronics Limited (bel)
📍 KRISHNA, ANDHRA PRADESH
Bharat Electronics Limited (bel)
📍 KRISHNA, ANDHRA PRADESH
📍 Tamil Nadu
Ntpc Sail Power Company Ltd
📍 SUNDERGARH, ODISHA
Sign up now to access all documents
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS