Gondia District Panchayats Off-Grid Solar PV Power Plant Tender Maharashtra 2026 – V2 PCU & PV Module Standards
Gondia District Panchayats
GONDIA, MAHARASHTRA
Bid Publish Date
22-Jan-2026, 5:51 pm
Bid End Date
02-Feb-2026, 6:00 pm
EMD
₹2,50,000
Progress
Quantity
50
Bid Type
Two Packet Bid
Public procurement opportunity for N/a Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) (Q3). Quantity: 50 issued by. Submission Deadline: 02-02-2026 18: 00: 00. View full details and respond.
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Gondia District Panchayats
GONDIA, MAHARASHTRA
N/a
GONDIA, MAHARASHTRA
N/a
GONDIA, MAHARASHTRA
Nashik District Panchayats
NASHIK, MAHARASHTRA
N/a
BHOPAL, MADHYA PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| INVERTER | Rated output power of inverter (Kw) | 10 |
| INVERTER | Switching Device | IGBT |
| INVERTER | Number of MPPT per inverter (in Nos) | 2, 4 |
| INVERTER | Number of string at input side of inverter ( input port +ve and -ve) ( hint: 1 sets contains 1 +ve and 1 -ve port) | 2 sets |
| INVERTER | Operating Voltage Range of Inverter | 200 V to 1000 V |
| INVERTER | Over load support at Input side, DC - Maximum (in %) | 20 |
| INVERTER | Maximum input current for each MPPT (in A) | 28.5, 18 |
| INVERTER | Service condition | Outdoor |
| INVERTER | Ingress protection rating of inverter | IP 65 (for outdoor use) |
| INVERTER | Cooling medium for inverter | Nature air cooled, Intelligent fan cooling |
| INVERTER | Manual switch for disconnecting DC supply | Yes |
| INVERTER | Inverter mounting type | Wall Mounted |
| INVERTER OUTPUT | Maximum current for 3 phase inverter (in A) | 23.8 |
| INVERTER OUTPUT | Inverter auto trip at output side | Lower : at 304 V, Higher : at 460 V with adjustable |
| INVERTER OUTPUT | Overall Efficiency (in %) | >/= 98 Or higher |
| PROTECTION FOR INVERTER | Overload protection | 110% for 1 Minute |
| PROTECTION FOR INVERTER | Over temperature protection | Yes at 65 Deg. C Cooling Fan will auto switch ON |
| PROTECTION FOR INVERTER | Insulation Resistance Monitoring | Yes |
| PROTECTION FOR INVERTER | Grid Monitoring protection | Yes |
| PROTECTION FOR INVERTER | THD (in %) | < 3% |
| PROTECTION FOR INVERTER | Power factor at rated out put power | >/= 0.8, >/= 0.9 |
| PROTECTION FOR INVERTER | Inverter body material | Aluminium Casting |
| SERVICE CONDITION | Operating temperature | -25 to +60 deg. C |
| DISPLAY FEATURES ON INVERTER | Type of display | LCD, LED |
| DISPLAY FEATURES ON INVERTER | Interface facility for transmitting the generating power data for cloud storage | Inbuilt Wifi Enabled, With RS 485 |
| DISPLAY FEATURES ON INVERTER | Net meter | Approved by Government of India/State Government authority concerned for connecting to Grid |
| Add on items - DC DISTRIBUTION BOARD | Circuit Breaker for input side (DC side) for each inverter | MCB 15 A |
| Add on items - CABLE FOR INPUT | Electric Cable for Input | 1C x 4 Sq. mm, Copper Cable (as per IS 694), 1C x 6 Sq. mm, Copper Cable (as per IS 694) |
| Add on items - CABLE FOR INPUT | Cable Length for PV Module to Inverter, DC (in m) | 25 |
| Add on items - AC DISTRIBUTION BOARD | AC Distribution Panel Board (DPB) for controlling the AC power from PCU/inverter | 3 Phase 415 Volt +/- 10%, 50 HZ +/-3 Hz |
| Add on items - AC DISTRIBUTION BOARD | Ingress protection (Enclosure protection) of AC Distribution Box | IP65 for outdoor |
| Add on items - AC DISTRIBUTION BOARD | Circuit Breaker for output side (AC side) for each inverter | MCB 32 A |
| Add on items - CABLE FOR OUTPUT | ISI marked Connecting cables according to Inverter rating for each system | From Inverter to Net Meter, From Inverter to Net Meter and to mains at LT Bus bar while in grid tied mode |
| Add on items - CABLE FOR OUTPUT | Material of cable conductor | Copper |
| Add on items - CABLE FOR OUTPUT | Number of Core (in Nos) | 3.5, 1 |
| Add on items - CABLE FOR OUTPUT | Cross sectional Area of conductor (in sq mm) | 16, 4 |
| Add on items - CABLE FOR OUTPUT | Cable length for output side (from inverter to Net Meter for each system ) (in m ) | 35 |
| Other Add on Items | Cabling work at input side for each system | With PVC Conduit pipe with necessary clamps and screws |
| Other Add on Items | Danger boards and signages | 3 No. |
| ARRAY STRUCTURE | Material of mounting structure for mounting the modules/ panels/arrays | Structural Steel, Grade: E300 (as per IS 2062) |
| JUNCTION BOX | Material of Junction Box | FRP (Fibre reinforced plastics) |
| JUNCTION BOX | Ingress protection (Degree of Protection) for Junction Box | IP65 |
| Wind Load | Regional wind withstand capacity which the Mounting structure of PV system support is suitable to withstand (in Km/Hour) | 180 |
| WARRANTY & GUARANTEE | Minimum guarantee for maintaining of output peak watt capacity | > / = 90% at the end of 10 years and >/= 80% at the end of 25 years |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Nhpc Limited
📍 FARIDABAD, HARYANA
Development Commissioner (micro Small & Medium Enterprises)
📍 BHOPAL, MADHYA PRADESH
📍 GURGAON, HARYANA
Indian Space Research Organization
📍 AHMEDABAD, GUJARAT
The Fertilisers And Chemicals Travancore Limited
📍 ERNAKULAM, KERALA
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS