TenderDekho Logo
Get OEM Verified in 20 Days Apply โ†’
OPEN EPROCURE-TELANGANA

Open Tender for Procurement Services in BHADRADRI KOTHAGUDEM, TELANGANA

Bid Publish Date

29-Jun-2026, 6:23 pm

Bid End Date

09-Jul-2026, 10:30 am

EMD

โ‚น5,51,300

Value

โ‚น3,67,50,000

Progress

Issue29-Jun-2026, 6:23 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

OPEN

The issuing authority announces a tender for KTPS-V Stage- BM- Provide skilled labor, specifically IBR Welders and Grinders, to replace the boiler tubes in Unit-X of the KTPS-V stage during the Annual Overhaul period for the year 2026-27-Reg in BHADRADRI KOTHAGUDEM, TELANGANA. Submission Deadline: 09-07-2026 10: 30: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Works

Tender Value

โ‚น3,67,50,000

Processing Fee

โ‚น131

Payment Mode

Exempted,Online Payment,Challan Generation,BG

EMD Payable To

SAOOANDMKTPSVVISTAGES

Tender Fee Payable To

Transaction Fee Payable to 'TSTS ' payable at Hyderabad.(As per G.O.Ms No 4,Dtd 17.02.2015 IT&C Dept)

Bid To RA

No

Authority & Contact

Officer Inviting Bids

SE/O&M/KTPS-VSTAGE

Bid Opening Authority

SE/O&M/KTPS-VSTAGE

Address

O/oSE/O&M/KTPS-VSTAGE

Contact Details

9491088650

Document Source

ts_portal

Document Requirements

Copy of GST registration, PAN Card

COMMONMandatory

Responsibility for correctness of the information submitted in the bid lies with bidder. If any information furnished in the bid is proved to be false at a Later date, the bid will not only be rejected but the bidder will be BLACKLISTED.

COMMONMandatory

Copy of EMD/PSD/PEMD if any

COMMONMandatory

The contractor should have an experience in supply of skilled labour / having an experience in attending boiler tube replacement works during emergency/Overhaul in Thermal Power Plants. For which the firm has to submit the purchase order copies in a tender.

COMMONMandatory

The contractor should submit valid IBR certificates of 3nos welders.

COMMONMandatory

The IBR 3nos welders and 3nos grinders are to undergo testing before commencing the work. If the welder was unfit, the contractor should arrange for another experienced IBR welder immediately (Undertaking should be enclosed).

COMMONMandatory

Mobilization period: The contractor must mobilize labour manpower, in all respects, as per the scope of the work within 03 days from the date of issue of intimation by mail/call, and necessary skilled manpower shall be engaged by the contractor. (undertaking)

COMMONMandatory

Tender Terms

General Terms and Conditions / Eligibility

5 points

1.The contractor should have an experience in supply of skilled labour / having an experience in attending boiler tube replacement works during emergency/Ove...

1

1.The contractor should have an experience in supply of skilled labour / having an experience in attending boiler tube replacement works during emergency/Overhaul in Thermal Power Plants. For which the firm has to submit the purchase order copies in a tender.

2

2.The contractor should submit valid IBR certificates of 3nos welders.

3

3.The IBR 3nos welders and 3nos grinders are to undergo testing before commencing the work. If the welder was unfit, the contractor should arrange for another experienced IBR welder immediately (Undertaking should be enclosed).

4

4.Mobilization period: The contractor must mobilize labour manpower, in all respects, as per the scope of the work within 03 days from the date of issue of intimation by mail/call, and necessary skilled manpower shall be engaged by the contractor.(undertaking)

5

5.Responsibility for correctness of the information submitted in the bid lies with bidder. If any information furnished in the bid is proved to be false at a Later date, the bid will not only be rejected but the bidder will be BLACKLISTED.

General Terms & Conditions

Details

1. Contractor shall arrange all the safety appliances (safety helmet, safety shoes, safety goggles & leather safety gloves) to the man power engaged. 2. The ...

  1. Contractor shall arrange all the safety appliances (safety helmet, safety shoes, safety goggles & leather safety gloves) to the man power engaged. 2. The works should be carried out as per the scope of the work and to the entire satisfaction of field engineers. If any defective work is done by the IBR welders or grinders, the contractor has to change/replace them with a suitable one. 3. PERIOD OF WORK: The labour supplied by the contractor should be available during the entire overhaul period from the date of commencement of the work. 4. The labour engaged by the contractor should not leave the work site without the permission of the site In-charge and are available day & night to avoid the work delay. If any negligence, misconduct intentionally work delay by the engaged labour the contractor has to be imposed interms of penalty. 5. During execution of the work, if any life risk (or) fatal accidents occurs, TGGENCO will not be responsible any kind of accidents for your labour supplied and it is purely the contractor's responsibility 6. WELFARE & SAFETY: a) The contractor has to observe all the safety measures for the workers engaged and necessary precautionary measures must be taken, in order to avoid accidents, while carrying out the work entrusted, duly insisting the workers to use safety appliances. b). Contractor is responsible for all the accidents and the consequences due to any accidents that take place inside or outside the premises to their workers. The TGGENCO Ltd., will pay no compensation if any, accidents occur to his workers while carrying out the work. Insurance against all types of risk for the contractors workers during the period of execution of the work will have to be arranged by the contractor at his own cost before commencement of work. 7. The bidder must be capable to complete the Overhaul works before the scheduled period from the date of commencement of the overhaul. 8. The Contractor will able to provide personal safety appliance for labour. The TGGENCO is not responsible for any accidents to the labour engaged by the contractor during the course of work. 9. The contractor should ensure the safety of the workers by providing them with the necessary safety equipment like safety shoes , helmets etc If there is any loss to the TGGENCOโ€™s property due to negligence of the workers employed by the contractor, the contractor has to restore the losses as assessed by the DE/BM/KTPS-V Stage 10. 0.01% of the amount shall be deducted from the works bills, as contribution towards Telangana Green Fund (TGF) which is not reimbursable and no provision shall be made in the estimates vide T.G.O.O No.86/CE/C/Thermal/2025,Dt:01.09.2025 11. Security Deposit: The successful tenderer has to pay, in addition to the E.M.D the balance amount of total up to 5% of the value of contract as security deposit by way of demand draft drawn in favour of S.A.O/O&M /KTPS-V&VI Stages by way of demand draft payable at S.B.I/ Paloncha Branch. The security deposit amount will be released after completion of Guarantee period. 12.The Bidder must possess Qualified IBR welders with validate IBR certificates with Telangana Endorsement 3Nos. IBR Welders list with validate IBR certificates with Telangana Endorsement 3Nos should be submitted at the time of commencement. The Bidder should submit the T&P list and also Man power list for the subject work should be submitted

Legal Terms & Conditions

Details

as per tender document.

as per tender document.

Procedure for Bid Submission

Details

Show Procedure for Bid Submission

Show Procedure for Bid Submission

Enquiry Forms

PQ Stage

Form NameTypeSupport DocDescription
Key Critical EquipmentStandardNoN/A
Previously Executed worksStandardNoN/A
Work Done as a Prime ContractorStandardNoN/A
Key PersonnelStandardNoN/A
Works On Hand/Tendered DetailsStandardNoN/A
Similar Work DetailsStandardNoN/A
Eligibility CriteriaStandardNoN/A

Commercial Stage

Form NameTypeSupport DocDescription
Percentage Wise RateSecureNoN/A

BID & GeM Expert Consultancy

End-to-end support โ€” bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation ยท 24h response

Documents 2

Notice.doc

Notice

IBR Welders DOCUMENT.doc

document

Past Similar Tenders (Historical Results)

5 found

Contract Bidding Open For Deployment of EX WRI Welding expert n Ex BHEL expert for supervision of Boiler pressure parts overhauling works at KSTPS in KORBA, CHHATTISGARH

N/A

KORBA, CHHATTISGARH

Posted: 12 June 2024
Closed: 25 June 2024
EPROCURE

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit

Rashtriya Chemicals And Fertilizers Limited (rcf)

MUMBAI, MAHARASHTRA

Posted: 23 May 2025
Closed: 4 June 2025
GEM

Procurement Opportunity: BHE/PW/PUR/BWT6-SMX/AMP/128 in JALGAON, MAHARASHTRA

N/A

JALGAON, MAHARASHTRA

Posted: 24 July 2024
Closed: 27 July 2024
EPROCURE

Government Tender Published for TN4649 Maintenance of Boiler and associated area of Unit 1 to 7 (Stage I to V), KSTPS, Kota in KOTA, RAJASTHAN

N/A

KOTA, RAJASTHAN

Posted: 1 June 2019
Closed: 12 June 2019
EPROCURE

Contract Bidding Open For TTPS Mech II BM Unit I Replacement of boiler pressure parts tubes bends in II pass of Unit I Boiler during overhaul for the year 2025 2026 in TUTICORIN, TAMIL NADU

TNEB Limited

TUTICORIN, TAMIL NADU

Posted: 10 February 2026
Closed: 26 February 2026
EPROCURE

๐Ÿค– AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Bidding Process

Process Timeline

PQ Stage

1. PQ Stage 09-07-2026 11:00

Commercial Stage

1. Commercial Stage 09-07-2026 16:00

Depends on: PQ Stage

Similar Tenders

5 found
Urgent

KTPS-V Stage- BM- Overhauling of Coal and Oil firing Equipment, Dismantling, Servicing, Repairing and Re-erection of New or Re-conditioned Coal, Oil and Air Nozzles and assemble in original position of Unit-X Boiler, Transporting of Coal and oil burner assemblies, Burner Tilt Mechanism and Secondary air dampers for all 4 Corners of Unit-10 Boiler-KTPS-V Stage during the AOH Period 2026-27.

๐Ÿ“ BHADRADRI KOTHAGUDEM, TELANGANA

EMD: โ‚น6.9 L
Est: โ‚น4.6 Cr
โฐ Deadline: 5 days left
๐Ÿ›’ Type: Works
View EPROCURE-TELANGANA
Urgent

KTPS-V- CAM- Provide skilled labor specifically Welders, Gas Cutters, Fitters, Riggers for exhibiting certain works such as Rolling Replacement of the Fly Ash Disposal lines, Silo Target box fabrication and Works at Buffer Hopper area of Unit-X during the Overhaul 2026-27-Reg

๐Ÿ“ BHADRADRI KOTHAGUDEM, TELANGANA

EMD: โ‚น1.8 L
Est: โ‚น1.2 Cr
โฐ Deadline: 4 days left
๐Ÿ›’ Type: Works
View EPROCURE-TELANGANA
Urgent

KTPS-V Stage- BM- Service charges Rendered to Overhaul of Soot Blowers(WWSBs and LRSBs) and Boiler all Hanger supports Inspection and Repair Replacement works of Unit-10 AOH.

๐Ÿ“ BHADRADRI KOTHAGUDEM, TELANGANA

EMD: โ‚น3.7 L
Est: โ‚น2.5 Cr
โฐ Deadline: 5 days left
๐Ÿ›’ Type: Works
View EPROCURE-TELANGANA
Urgent

KTPS-V stage -I and C-Deputation of service engineer for servicing of Gland steam and Leak off steam hydraulic actuator in Unit#10 during the Annual OH 2026-27-Reg

๐Ÿ“ BHADRADRI KOTHAGUDEM, TELANGANA

EMD: โ‚น4.2 L
Est: โ‚น2.8 Cr
โฐ Deadline: 4 days left
๐Ÿ›’ Type: Works
View EPROCURE-TELANGANA
Urgent

Open Tender for Labour Contract For KCP Boiler Main Bank Tubes Damaged Length 2 Mtr Renewal Work With IBR Approved in THIRUVALLUR, TAMIL NADU

Department of Sugar

๐Ÿ“ THIRUVALLUR, TAMIL NADU

โฐ Deadline: 3 days left
๐Ÿ›’ Type: Works
View EPROCURE