TenderDekho Logo
OPEN EPROCURE-TELANGANA

Procurement Opportunity: Procurement Services in BHADRADRI KOTHAGUDEM, TELANGANA

Bid Publish Date

25-Jun-2026, 5:45 pm

Bid End Date

04-Jul-2026, 10:30 am

EMD

โ‚น6,94,100

Value

โ‚น4,62,72,000

Location

BHADRADRI KOTHAGUDEM , TELANGANA

Progress

Issue25-Jun-2026, 5:45 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

OPEN

A tender has been published for The issuing authority KTPS-V Stage- BM- Overhauling of Coal and Oil firing Equipment, Dismantling, Servicing, Repairing and Re-erection of New or Re-conditioned Coal, Oil and Air Nozzles and assemble in original position of Unit-X Boiler, Transporting of Coal and oil burner assemblies, Burner Tilt Mechanism and Secondary air dampers for all 4 Corners of Unit-10 Boiler-KTPS-V Stage during the AOH Period 2026-27. in BHADRADRI KOTHAGUDEM, TELANGANA by. Submission Deadline: 04-07-2026 10: 30: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Works

Tender Value

โ‚น4,62,72,000

Processing Fee

โ‚น164

Payment Mode

Exempted,Online Payment,Challan Generation,BG

EMD Payable To

SAOOANDMKTPSVVISTAGES

Tender Fee Payable To

Transaction Fee Payable to 'TSTS ' payable at Hyderabad.(As per G.O.Ms No 4,Dtd 17.02.2015 IT&C Dept)

Bid To RA

No

Authority & Contact

Officer Inviting Bids

SE/O&M/KTPS-VSTAGE

Bid Opening Authority

SE/O&M/KTPS-VSTAGE

Address

O/oSE/O&M/KTPS-VSTAGE

Contact Details

9491088650

Document Source

ts_portal

Document Requirements

Copy of GST registration, PAN Card

COMMONMandatory

Copy of EMD/PSD/PEMD if any

COMMONMandatory

The Contractor must have the same type of previous work experience in 250 MW Boiler and Above capacity (Previous work experience PO copies must be enclosed).

COMMONMandatory

The Contractor must have All the required T&P to attend the Overhaul works of Boiler and its Auxiliaries. All the T&P required for the above work (All the Welding machines, grinding machines, metal cutting accessories, Chain pulley blocks, slings and if any extra T&P required) shall be arranged by the contractor at free of cost to execute the work. The T&P shall be fit for job, if any damage o

COMMONMandatory

The bidder should possess PAN card, GST Registration Number, ESI Registration /EPF Number and valid labour license,

COMMONMandatory

Responsibility for correctness of the information submitted in the bid lies with bidder. If any information furnished in the bid is proved to be false at a Later date, the bid will not only be rejected but the bidder will be BLACKLISTED

COMMONMandatory

Tender Terms

General Terms and Conditions / Eligibility

4 points

1.The Contractor must have the same type of previous work experience in 250 MW Boiler and Above capacity (Previous work experience PO copies must be enclosed...

1

1.The Contractor must have the same type of previous work experience in 250 MW Boiler and Above capacity (Previous work experience PO copies must be enclosed).

2

2.The Contractor must have All the required T&P to attend the Overhaul works of Boiler and its Auxiliaries. All the T&P required for the above work (All the Welding machines, grinding machines, metal cutting accessories, Chain pulley blocks, slings and if any extra T&P required) shall be arranged by the contractor at free of cost to execute the work. The T&P shall be fit for job, if any damage of the T&P is at firmโ€™s risk and TGGENCO is not responsible.

3

3.The bidder should possess PAN card, GST Registration Number, ESI Registration /EPF Number and valid labour license,

4

4.Responsibility for correctness of the information submitted in the bid lies with bidder. If any information furnished in the bid is proved to be false at a Later date, the bid will not only be rejected but the bidder will be BLACKLISTED.

General Terms & Conditions

Details

1.The Contractor has capable to mobilize the required T&P and experienced persons with in short notice to attend the overhaul works. 2.The Contractor must ha...

1.The Contractor has capable to mobilize the required T&P and experienced persons with in short notice to attend the overhaul works. 2.The Contractor must have the experienced Technical Persons 3.The work shall be completed as per the direction of in-charge engineer at site andM/s BHEL/BEST/ABC/or ANY OTHER service persons. 4.The Consumables like Oxygen gas, DA gas and LP gas for the work will be supplied by the TGGENCO/KTPS-V Stage. 5.Spares & other consumables such as welding electrodes etc., will be issued by TGGENCO/ KTPS-V stage. 6.The work should be completed within prescribed time during the overhaul period of 2026-27. The contractor has to update the daily work progress and the job must be finished within the time schedule provided by the field engineer. 7.The contractor might be penalized maximum of 5% of work value over any delays or deviations in the work's progress. The delay in the work progress leads to loss of generation or plant availability; hence, to avoid such penalties, it is crucial for the contractor to communicate any potential issues promptly. Staying proactive and maintaining a transparent line of communication with the field engineer can help mitigate risks and ensure the project stays on track. 8.The work shall be carried out strictly as per the requirement & instructions of the TGGENCO/KTPS-V field Engineers and their entire satisfaction. 9.The contractor must take safety precautions and arrange safety appliances to workers, if any fatal accident occurs during the work at site TGGENCO/ KTPS-V stage is not responsible and the firm may take care of it. 10.The Contractor must capable to arrange the payments (Wages) as per labour rates with out awaiting payments/bills from the TGGENCO. 11.The Contractor must have the valid labour licence, EPF Number and necessary statutory requirements to carry out the work. 12.The Contractor shall take the responsibility for engage and disengage of the labour. 13.The Contractor will able to provide personal safety appliance for labour. The TGGENCO is not responsible for any accidents to the labour engaged by the contractor during the course of work. 14.The Contractor able to take responsible for safety and discipline and execution of work. 15.The Contractor able to arrange labour payments with out depending quantity of work done because the billing or payment made based on work done not for labour supply. 16.The work shall be completed as per the direction of in-charge engineer at site and M/s BHEL/BEST/ABC/or ANY OTHER service persons. 17.WELFARE & SAFETY: a) The contractor has to observe all the safety measures for the workers engaged and necessary precautionary measures must be taken, in order to avoid accidents, while carrying out the work entrusted, duly insisting the workers to use safety appliances. b). Contractor is responsible for all the accidents and the consequences due to any accidents that take place inside or outside the premises to their workers. The TGGENCO Ltd., will pay no compensation if any, accidents occur to his workers while carrying out the work. Insurance against all types of risk for the contractors workers during the period of execution of the work will have to be arranged by the contractor at his own cost before commencement of work. 18.The contractor should ensure the safety of the workers by providing them with the necessary safety equipment like safety shoes , helmets etc If there is any loss to the TGGENCOโ€™s property due to negligence of the workers employed by the contractor, the contractor has to restore the losses as assessed by the DE/BM/KTPS-V Stage 19.0.01% of the amount shall be deducted from the works bills, as contribution towards Telangana Green Fund (TGF) which is not reimbursable and no provision shall be made in the estimates vide T.G.O.O No.86/CE/C/ Thermal/2025,Dt:01.09.2025 20.Security Deposit: The successful tenderer has to pay, in addition to the E.M.D the balance amount of total up to 5% of the value of contract as security deposit by way of demand draft drawn in favour of S.A.O/O&M /KTPS-V&VI Stages by way of demand draft payable at S.B.I/ Paloncha Branch. The security deposit amount will be released after completion of work.

Legal Terms & Conditions

Details

as per tender document.

as per tender document.

Procedure for Bid Submission

Details

Show Procedure for Bid Submission

Show Procedure for Bid Submission

Enquiry Forms

PQ Stage

Form NameTypeSupport DocDescription
Key Critical EquipmentStandardNoN/A
Previously Executed worksStandardNoN/A
Work Done as a Prime ContractorStandardNoN/A
Key PersonnelStandardNoN/A
Works On Hand/Tendered DetailsStandardNoN/A
Similar Work DetailsStandardNoN/A
Eligibility CriteriaStandardNoN/A

Commercial Stage

Form NameTypeSupport DocDescription
Percentage Wise RateSecureNoN/A

BID & GeM Expert Consultancy

End-to-end support โ€” bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation ยท 24h response

Documents 2

Notice.doc

Tender Notice

DOCUMENT.doc

Tender document

Past Similar Tenders (Historical Results)

5 found

Government Tender Published for TN4649 Maintenance of Boiler and associated area of Unit 1 to 7 (Stage I to V), KSTPS, Kota in KOTA, RAJASTHAN

N/A

KOTA, RAJASTHAN

Posted: 1 June 2019
Closed: 12 June 2019
EPROCURE

Contract Bidding Open For TN-5271 Maintenance and Up-keeping of Zero Meter Boiler Area, ESP Area, walkways etc in Stage-I to V and Transportation of ash ,garbages, CMR, other material thereof in KSTPS, Kota. in KOTA, RAJASTHAN

N/A

KOTA, RAJASTHAN

Posted: 5 July 2024
Closed: 18 July 2024
EPROCURE

Invitation to Bid - TN-5221 Work of capital and routine maintenance of boiler pressure part area (HP/LP welding of boiler/turbine area, HP/LP valves, soot blowers and its associated works) of Unit 1 to 7 at KSTPS, Kota. in KOTA, RAJASTHAN

N/A

KOTA, RAJASTHAN

Posted: 20 December 2023
Closed: 18 January 2024
EPROCURE

Invitation to Bid - TN-4958 Chemical Cleaning of Boiler Unit # 7 (195 MW) Stage-V,KTPS,Kota in KOTA, RAJASTHAN

N/A

KOTA, RAJASTHAN

Posted: 14 December 2021
Closed: 29 December 2021
EPROCURE

Government Tender Published for TN-5445 Maintenance and Up-keeping of Zero Meter Boiler Area, ESP Area, walkways etc. in Stage-I to V and Transportation of ash, garbage, CMR and other material thereof at KSTPS, KOTA in KOTA, RAJASTHAN

RRVUN - CMD

KOTA, RAJASTHAN

Posted: 26 September 2025
Closed: 13 October 2025
EPROCURE

๐Ÿค– AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Bidding Process

Process Timeline

PQ Stage

1. PQ Stage 04-07-2026 11:00

Commercial Stage

1. Commercial Stage 04-07-2026 16:00

Depends on: PQ Stage

Similar Tenders

5 found

KTPS-V Stage- BM- Service charges Rendered to Overhaul of Soot Blowers(WWSBs and LRSBs) and Boiler all Hanger supports Inspection and Repair Replacement works of Unit-10 AOH.

๐Ÿ“ BHADRADRI KOTHAGUDEM, TELANGANA

EMD: โ‚น3.7 L
Est: โ‚น2.5 Cr
โฐ Deadline: 2 weeks left
๐Ÿ›’ Type: Works
View EPROCURE-TELANGANA
Urgent

KTPS-V-BM- Service charges Rendered to Safety valves (Boiler and Turbine) Overhaul works and Safety valves seat cutting service person, Arranging of Safety valves seat cutting machine during Unit-10 AOH-Reg

๐Ÿ“ BHADRADRI KOTHAGUDEM, TELANGANA

EMD: โ‚น4.0 L
Est: โ‚น2.7 Cr
โฐ Deadline: 4 days left
๐Ÿ›’ Type: Works
View EPROCURE-TELANGANA
Urgent

KTPS-V stage -I and C -Rewinding of MOTORS UPTO 15 KW 3-Ph 415V LT Motors of Classifier outlet gates Spray controls Boiler Vents and drains ESP inlet gates outlet gates MS valves and Feed control station Actuators motors with class F Insulation of Units 9 and 10 for the year 2026 - 27-Reg

๐Ÿ“ BHADRADRI KOTHAGUDEM, TELANGANA

EMD: โ‚น2.9 L
Est: โ‚น1.9 Cr
โฐ Deadline: 5 days left
๐Ÿ›’ Type: Works
View EPROCURE-TELANGANA

KTPS V VI Stages- Civil- O M-I- Providing painting to the structural steel chemical tanks behind DM plant building of KTPS V stage, Paloncha

๐Ÿ“ BHADRADRI KOTHAGUDEM, TELANGANA

EMD: โ‚น4.3 L
Est: โ‚น2.9 Cr
โฐ Deadline: 2 weeks left
๐Ÿ›’ Type: Works
View EPROCURE-TELANGANA

KTPS-V stage -CAM-Inspection removal of silt and debris deposited over bottom of the sump for perfect seating of stop log gates and dewatering of sump before strainer by Insertion of stop log gates at CWPH and lifting of stop log gates after completion of work including all leads and lifts to be finished in complete shape as directed by the field Engineer.-Reg

๐Ÿ“ BHADRADRI KOTHAGUDEM, TELANGANA

EMD: โ‚น5.0 L
Est: โ‚น3.4 Cr
โฐ Deadline: 2 weeks left
๐Ÿ›’ Type: Works
View EPROCURE-TELANGANA