Directorate Of Employment & Training Gujarat ISI Standard Goods Tender Gandhinagar 2026

Bid Publish Date

14-Sep-2026, 2:09 pm

Bid End Date

30-Sep-2026, 4:00 pm

Value

₹4,90,000

Progress

Issue14-Sep-2026, 2:09 pm
AwardPending

Key Highlights

  • • ISI standard goods mandated with BIS/ISI conformity
  • • Delivery window fixed at 15 days; 0.5% weekly penalty for delays
  • • EMD amount ₹15,000 via Demand Draft to Principal Industrial Training Institute, Gandhinagar
  • • Supplier must have a registered office in Gujarat with valid GST certificate

Tender Overview

The Directorate Of Employment & Training (Labour And Employment Department Gujarat), located in Gandhinagar, Gujarat, invites bids for ISI standard goods with an estimated value of ₹490,000. The procurement targets supply of complete ISI-standard items within a delivery window of 15 days. Bidders must operate from Gujarat, provide a valid GST certificate, and submit with an EMD of ₹15,000. The contract includes an option to adjust quantities up to 25%, with extended delivery time calculated per contract terms. Payable through GeM with standard government norms. The tender emphasizes ISI conformity and supplier accountability, including penalties for non-compliance. Unique aspects include a mandatory GST/PAN requirement and supplier verification for authenticity and ISI compliance.

Technical Specifications & Requirements

  • Product scope: complete ISI-standard goods as per BIS/ISI norms; no itemized spec data provided in the BOQ
  • Delivery: 15 days from order date; penalty of 0.5% per week for delays
  • Quality control: goods must be ISI standard; rejection if not in specification; supplier to replace at own cost within time limits
  • Vendor location & compliance: office must be in Gujarat; GST certificate to be validated
  • EMD & documentation: ₹15,000 DD payable to PRINCIPAL INDUSTRIAL TRAINING INSTITUTE, GANDHINAGAR; all bid prices to include GST; GST/PAN and authenticity certificates required
  • Payment & invoicing: payment processed as per Government norms via GeM; item-wise confirmation required before payment

Terms, Conditions & Eligibility

  • EMD: ₹15,000 via Demand Draft to PRINCIPAL INDUSTRIAL TRAINING INSTITUTE, GANDHINAGAR
  • Delivery timeline: 15 days; extension rules apply if quantity changes under the 25% option clause
  • ISI compliance: complete ISI-standard goods at supplier cost; replacement if non-conforming
  • GeM submission: prices to be offered online on GeM; GST/invoice aligned with GeM terms
  • Office presence: supplier must have Gujarat office; GST certificate acceptable as supporting evidence
  • Documentation: GST certificate, PAN, authenticity certificates, financials, and relevant vendor documents; all items must be supplied in full per order
  • Liability: supplier responsible for return and replacement costs for non-conforming goods; penalties apply for delays and non-compliance

Key Specifications

  • Complete ISI-standard goods with ISI/BIS compliance

  • Delivery timeline: 15 days from order date

  • Penalty: 0.5% of contract value per week for delays

  • EMD: ₹15,000 via Demand Draft

  • Supplier must have Gujarat office and valid GST certificate

  • Prices to be quoted in GeM; include GST

Terms & Conditions

  • EMD ₹15,000 to be submitted with bid via DD

  • Delivery period fixed at 15 days; extension as per option clause

  • ISI standard conformity mandatory; replacement at supplier cost for non-conforming goods

Important Clauses

Payment Terms

Payments released per Government norms via GeM after item-wise acceptance and confirmation of ISI-compliant goods

Delivery Schedule

Delivery within 15 days; extended time applies if the 25% quantity variation is exercised

Penalties/Liquidated Damages

0.5% per week penalties for late delivery; replacement of non-conforming goods at supplier’s cost

Bidder Eligibility

  • Office registered in Gujarat with valid GST certificate

  • Experience in supplying ISI-standard goods (if available)

  • Financial capability to submit ₹15,000 EMD and sustain early delivery

Advertisement

Authority & Contact

Tender Data

Bid Details

Quantity

5716

Category

ISOMETRIC BLOCK CONE CUBE CYLINDER

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+20%

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

20

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

3

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Gandhinagar

Delivery Pincodes

382016

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Teraiya Mansi Hiteshbhai382016,GOVT. INDUSTRIAL TRAINING INSTITUTE, GANDHINAGAR, SECTOR - 15, NEAR- LDRP COLLEGE, GANDHINAGAR, DI - GANDHINAGARGandhinagarGujarat38201630015-

Authority Records

LABOUR AND EMPLOYMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9870098.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 181 Items Sign in for GEM prices

#1

ANCHOR THREAD FOR HAND EMBROIDERY

AS PER STANDARDS

300 no Delivery: 15 days
#2

CARD BOARD

2 X 2 FEET

80 no Delivery: 15 days
#3

CARD BOARD SHEET HARD FOR PROJECT

4 X 2 FEET

4 no Delivery: 15 days
#4

CORD FOR PIPING

8 MM

45 mtr Delivery: 15 days
#5

FANCY LASE

20 MM

110 mtr Delivery: 15 days
#6

HAND WORK RING

6, 7, 8 INCH

30 no each Delivery: 15 days
#7

HARD BOARD

12 X12 INCH

4 no Delivery: 15 days
#8

MACHINE TWEEZER

6 INCH

32 no Delivery: 15 days
#9

ANABOND TUBE

AS PER STANDARDS

1 no Delivery: 15 days
#10

HORN SWITCH FOR ACTIVA

AS PER STANDARDS

1 no Delivery: 15 days
#11

AUTOWIRE 1.5 SQMM

1.5 SQMM

30 mtr Delivery: 15 days
#12

AUTOWIRE 4 MM

4 SQMM

4 coil Delivery: 15 days
#13

BRAKE WIRE FOR ACTIVA 5G

AS PER STANDARDS

2 set Delivery: 15 days
#14

BRAKELIGHT BULB FOR ACTIVA

AS PER STANDARDS

1 no Delivery: 15 days
#15

BREAK LINER FOR TATA SUMO

AS PER STANDARDS

1 set Delivery: 15 days
#16

BREAK PAD FOR TATA SUMO

AS PER STANDARDS

1 set Delivery: 15 days
#17

BREAK SHOE FOR TATA SUMO

AS PER STANDARDS

1 set Delivery: 15 days
#18

BREATHABLE CABLE GLAND

M16 x 1.5

1 no Delivery: 15 days
#19

CARBURATOR KIT FOR ACTIVA

AS PER STANDARDS

1 kit Delivery: 15 days
#20

CARBURATOR PACKING SET

AS PER STANDARDS

1 set Delivery: 15 days
#21

CDI FOR ACTIVA

AS PER STANDARDS

1 no Delivery: 15 days
#22

CELL SWITCH FOR ACTIVA

AS PER STANDARDS

1 no Delivery: 15 days
#23

DIFFERENTIAL OIL SAE 120

SAE 120

2 ltr Delivery: 15 days
#24

POWER STEERING OIL

PS-700

2 ltr Delivery: 15 days
#25

ENGINE PACKING SET FOR ACTIVA

AS PER STANDARDS

1 set Delivery: 15 days
#26

FORK OIL HYDRAULIC

AS PER STANDARDS

1 ltr Delivery: 15 days
#27

HEAD LIGHT SWITCH FOR ACTIVA

AS PER STANDARDS

1 no Delivery: 15 days
#28

HEADLIGHT BULB FOR ACTIVA

AS PER STANDARDS

1 no Delivery: 15 days
#29

SIDE LIGHT BULB FOR ACTIVA

AS PER STANDARDS

4 no Delivery: 15 days
#30

SIDE LIGHT SWITCH FOR ACTIVA

AS PER STANDARDS

1 no Delivery: 15 days
#31

VALVE GRINDING STICK

15-20 MM

14 no Delivery: 15 days
#32

VALVE SPRING

AS PER STANDARDS

8 no Delivery: 15 days
#33

GI CABLE

5 MM

1 mtr Delivery: 15 days
#34

B.S.P. PIPE

DIA 1/2 INCH

4 set Delivery: 15 days
#35

EMC GLANDS

M16 X 1.5 MM

1 no Delivery: 15 days
#36

ISOMETRIC BLOCK CONE CUBE CYLINDER

AS PER STANDARDS

1 no each Delivery: 15 days
#37

MATCH BOX

AS PER STANDARDS

10 no Delivery: 15 days
#38

TIKWOOD BATTEN PATTI 300X25X12 MM

300X25X12 MM

45 no Delivery: 15 days
#39

UDHAI NI DAVA TERMITE MEDICINE

AS PER STANDARDS

1 ltr Delivery: 15 days
#40

WALL GRIPS

size 25x8 mm

3 pkt Delivery: 15 days
#41

HFC-134 GAS

AS PER STANDARDS

2 kg Delivery: 15 days
#42

HYDROGEN PEROXIDE

AS PER STANDARDS

4 bottle Delivery: 15 days
#43

ELECTRODE HOLDER

Up to 4.0 mm

6 no Delivery: 15 days
#44

GI WINDING WIRE 20 SWG

20 SWG

50 mtr Delivery: 15 days
#45

GI WIRE DIA 2 MM

DIA. 2 MM

26 mtr Delivery: 15 days
#46

GI BINDING WIRE 20 GAUAGE

20 GAUAGE

500 gm Delivery: 15 days
#47

HEX. BAR 24 A F

24 A F

4 mtr Delivery: 15 days
#48

M S CHANNEL 75X35X5 MM

75X35X5 MM

6 mtr Delivery: 15 days
#49

M S HEXAGONAL BAR A F 18 MM

A/F 18 MM

1 mtr Delivery: 15 days
#50

MS TUBE

0.25 INCH

25 foot Delivery: 15 days
#51

HDMI CABLE

15 m lenth

1 no Delivery: 15 days
#52

LDR

5 mm

1 no Delivery: 15 days
#53

POTENTIOMETER

16 mm

1 no Delivery: 15 days
#54

PRESET

6mm Square

1 no Delivery: 15 days
#55

CMOS BATTERY CELL

CR2032

4 no Delivery: 15 days
#56

COLPITS OSCILLATOR CIRCUIT KIT

AS PER STANDARDS

2 no Delivery: 15 days
#57

DESOLDERING WICK

0.080 INCH BY 2.0 mm

2 no Delivery: 15 days
#58

DIAC

DIA 1.7 mm to 2.0 mm

1 no Delivery: 15 days
#59

DISPLAY TO HDMI ADAPTER

40 mm to 60 mm long

3 no Delivery: 15 days
#60

DISPLAY TO VGA ADAPTER

200 mm TO 240 mm

3 no Delivery: 15 days
#61

ELECTRONICS SEQUENTIAL CONTROL CIRCUIT 4 CHANNEL

96 x 96 x 50 mm

5 no Delivery: 15 days
#62

ELECTRONICS SEQUENTIAL CONTROLLERS

72 x 72 mm

1 no Delivery: 15 days
#63

ELECTROTATIC CAPACITOR

25 MF

1 no Delivery: 15 days
#64

HARTLEY OSCILLATOR CIRCUIT KIT

AS PER STANDARDS

2 no Delivery: 15 days
#65

LED BLUE, GREEN, RED, YELLOW

5 MM, 3V

500 no each Delivery: 15 days
#66

LED DOWNLIGHT 15W, 240V

15W, 240V

3 no Delivery: 15 days
#67

LED LAMP 18 W

18 W

3 no Delivery: 15 days
#68

LED LAMP 9W, 12W, 15W

9W, 12W, 15W

1 no each Delivery: 15 days
#69

LED LAMP HOLDER WITH PVC CAPE, 5MM-3V FOR LED

5MM-3V

600 no Delivery: 15 days
#70

LED LIGHT 12 V, 20 Ma

12 V, 20 Ma

2 no Delivery: 15 days
#71

LED LIGHT DC 3 OR 5 V 1 W

DC 3 OR 5 V 1 W

10 no Delivery: 15 days
#72

LED LIGHT FOR VOLTAGE TRACK

6W

3 no Delivery: 15 days
#73

LED SPOT LIGHT 6W

6W

3 no Delivery: 15 days
#74

RECHARGABLE BATTERY

3.7 V

3 no Delivery: 15 days
#75

TRANSFORMER 230V AND 12V, 500mA

230V/12V, 500mA

21 no Delivery: 15 days
#76

Interstage Transformer

AS PER STANDARDS

75 no Delivery: 15 days
#77

Audio Output Transformer

AS PER STANDARDS

75 no Delivery: 15 days
#78

Transformer 6-0-6 500mA

6-0-6 500mA

76 no Delivery: 15 days
#79

Transformer 12-0-12 500mA

12-0-12 500mA

75 no Delivery: 15 days
#80

Transformer 18-0-18

18-0-18 V

75 no Delivery: 15 days
#81

Transformer 24-0-24

24-0-24 V

75 no Delivery: 15 days
#82

TRIAC

DIA 1.7 mm to 2.0 mm

1 no Delivery: 15 days
#83

BNC to BNC lead

50 ohms

2 no Delivery: 15 days
#84

Lug 3 pin fix

3 pin fix

75 no Delivery: 15 days
#85

Rocker switch 20A, 1V AC

20A, 1V AC

36 no Delivery: 15 days
#86

Fuse holder with fuse

6A, 240V

3 no Delivery: 15 days
#87

Torch lamp 6V - 150mA

6V - 150mA

3 no Delivery: 15 days
#88

Torch lamp 6V - 300mA

6V - 300mA

3 no Delivery: 15 days
#89

Inductor 1mH 3mH 10mH

1mH 3mH 10mH

75 no each Delivery: 15 days
#90

IPA Cleaning Liquid

AS PER STANDARDS

3 bottle Delivery: 15 days
#91

Battery 3V

3V

100 no Delivery: 15 days
#92

Crystal 8.044 MHz with holder

8.044 MHz

75 no Delivery: 15 days
#93

FET BFW 10

BFW 10

75 no Delivery: 15 days
#94

Insulated Wire

14 BY 36 MM

3 meter Delivery: 15 days
#95

Ribbon Cable

AS PER STANDARDS

14 nos Delivery: 15 days
#96

Fiber Optic Cable

AS PER STANDARDS

20 meter Delivery: 15 days
#97

Audio Video Cable

AS PER STANDARDS

14 nos Delivery: 15 days
#98

IDE Cable

AS PER STANDARDS

5 nos Delivery: 15 days
#99

LVDT

2.5 kHz or 5 kHz, 3V VRMS

10 nos Delivery: 15 days
#100

Cell-Fi NW Chip

Up to 100 dB max system gain

1 nos Delivery: 15 days
#101

PV Wire

600V

60 meter Delivery: 15 days
#102

MCU connector

10-pin 1.27 mm

5 nos Delivery: 15 days
#103

UTP Cable

AS PER STANDARDS

10 meter Delivery: 15 days
#104

MINLEX WHITE PAPER 05 MILS

AS PER STANDARDS

100 gm Delivery: 15 days
#105

CHAWK FOR MERCURY VAPOUR LAMP 220V 80W

LAMP 220V 80W

1 no Delivery: 15 days
#106

PVC INSU. ALU. CABLE 35 MMSQ

35 MMSQ

60 foot Delivery: 15 days
#107

PVC INULATED ALUMINIUM ARMED CABLE 50 MMSQ

50 MMSQ

8 foot Delivery: 15 days
#108

35 MMSQ AAC ALL ALU. CONDUCTOR

35 MMSQ

10 mtr Delivery: 15 days
#109

AC SR CONDUCTOR

AS PER STANDARDS

10 m Delivery: 15 days
#110

AC-80 SPRAY FOR JUNK

AS PER STANDARDS

1 bottle Delivery: 15 days
#111

ANGEL HOLDER

220V TO 240V AC

110 no Delivery: 15 days
#112

ARMED CABLE GLANDS

M16 X 1.5 MM

1 no Delivery: 15 days
#113

BARE ALUMINIUM 8 SWG

8 SWG

2 kg Delivery: 15 days
#114

BATTEN HOLDER

220V TO 240V AC

137 no Delivery: 15 days
#115

BATTERY HOLDER

AS PER STANDARDS

10 no Delivery: 15 days
#116

BATTERY SOLUTION

AS PER STANDARDS

2 ltr Delivery: 15 days
#117

BULB 6V 100 mA

6V 100 mA

20 no Delivery: 15 days
#118

CABLE ENTRY PLATE

8 X 4 INCH

1 no Delivery: 15 days
#119

CABLE TRAY PVC WIDTH-50X50X1 MM

50X50X1 MM

2 mtr Delivery: 15 days
#120

CAPILLARY TUBE

AS PER STANDARDS

3 mtr Delivery: 15 days
#121

CFL DISPLAY SPOT LIGHT 15 TO 240V

15 TO 240V

5 no Delivery: 15 days
#122

CHAWK TRANSFORMER 400V 230V

400V 230V

1 no Delivery: 15 days
#123

COAXIAL CABLE

AS PER STANDARDS

2 mtr Delivery: 15 days
#124

CTC SPRAY

AS PER STANDARDS

250 ml Delivery: 15 days
#125

DE-FROST HEATER FOR REFRIGERATOR

AS PER STANDARDS

2 no Delivery: 15 days
#126

DOOR SWITCH FOR REFRIGERATOR

AS PER STANDARDS

2 no Delivery: 15 days
#127

DPST KNIFE SWITCH 16A 250V

16A 250V

1 no Delivery: 15 days
#128

EVAPORATOR FAN FOR REFRIGERATOR

AS PER STANDARDS

1 no Delivery: 15 days
#129

FEMALE CONNECTOR ALUMINIUM

approx. 125 to 250 PSI

3 no Delivery: 15 days
#130

FERAL CONNECT. ALU 35 MMSQ

35 MMSQ

80 no Delivery: 15 days
#131

FLEXIBLE ALUMINIUM BUSBAR - 12 MM THICKNESS

12 MM THICKNESS

1 mtr Delivery: 15 days
#132

GLAND ROP FOR CENTRIFUGAL PUMP

M16 X 1.5 MM

1 mtr Delivery: 15 days
#133

GOLIATH SCREW TYPE HOLDER FOR MERCURY VAPOUR LAMP

16 A, 250 V

1 no Delivery: 15 days
#134

HAND CUT RESISTANT GLOVE

AS PER STANDARDS

60 pair Delivery: 15 days
#135

INDUCTOR

2 mm

1 no Delivery: 15 days
#136

JUMPER CABLE WITH CLAMP PAIR

8 to 6 Gauge

5 pair Delivery: 15 days
#137

LAMP 100W

100W

66 no Delivery: 15 days
#138

LAMP 200W

200W

72 no Delivery: 15 days
#139

LAMP 240V 15W BC

240V 15W BC

25 no Delivery: 15 days
#140

LAMP 40W

40W

5 no Delivery: 15 days
#141

LAMP 60W

60W

35 no Delivery: 15 days
#142

LAMP HOLDER FOR SODIUM VAPOUR LAMP

600V to 1000V

1 no Delivery: 15 days
#143

LAMP WITH HOLDER 6W 21W 35W 12V DC

6W, 21W, 35W, 12V DC

20 no each Delivery: 15 days
#144

LOW VOLTAGE TRACK AND CAP

12V, 24V (AC/DC)

9 no Delivery: 15 days
#145

MAIN CONTACT 9A TO 12A

9A TO 12A

1 no Delivery: 15 days
#146

MERCURY VAPOUR LAMP 220V 80W

220V 80W

1 no Delivery: 15 days
#147

P21 4 WATT BULB

4 WATT

20 no Delivery: 15 days
#148

PENDANT HOLDER

6amp

35 no Delivery: 15 days
#149

PLUS MINUS 12 V FIXED VOLTAGE REGULATOR CIRCUIT KIT

PLUS MINUS 12 V

2 no Delivery: 15 days
#150

PVC RACEWAY CABLE

2 INCH CABLE

1 mtr Delivery: 15 days
#151

PVR LIGHT 54X3W, 60 to 350W

54X3W, 60-350W

1 no Delivery: 15 days
#152

SALT

AS PER STANDARDS

40 kg Delivery: 15 days
#153

SEAT VALVE

DIA. 1/2 INCH

4 no Delivery: 15 days
#154

SLEEVE 4MM DIA

4MM DIA

20 no Delivery: 15 days
#155

SODIUM VAPOUR LAMP 400W 230V

400W 230V

1 no Delivery: 15 days
#156

SOLAR CELL 12V

12V

2 no Delivery: 15 days
#157

SOLAR PANEL 6V AND 1W

6V/1W

3 no Delivery: 15 days
#158

SOLID ALUMINIUM BUSBAR-400A , LENGTH 1 MTR, WIDTH-40 MM, THICKNESS-20 MM

400A , L-1 MTR, W-40 MM, T-20 MM

1 mtr Delivery: 15 days
#159

SPIRAL FLEXI CABLE GLAND

M16 x 1.5

1 no Delivery: 15 days
#160

SPLIT BOLT CONNECTOR

16 AWG

30 no Delivery: 15 days
#161

SPLIT BOLT CONNECTOR WITH PIN 35 MMSQ FOR CONDUCTOR

35 MMSQ

20 no Delivery: 15 days
#162

SPLIT CABLE PLATE ENCLOSER

4X6 INCH

1 no Delivery: 15 days
#163

TEST LAMP

60W

4 no Delivery: 15 days
#164

XPLE CABLE 35 MMSQ 11KV

35 MMSQ 11KV

1 mtr Delivery: 15 days
#165

20 VOLUME DEVELOPER

20 VOLUME

3 bottle Delivery: 15 days
#166

30 VOLUME DEVELOPER

30 VOLUME

3 bottle Delivery: 15 days
#167

ALUMINIUM FOIL

AS PER STANDARDS

4 roll Delivery: 15 days
#168

BASE COAT

AS PER STANDARDS

1 box Delivery: 15 days
#169

CLEAN SPONGE

AS PER STANDARDS

3 no Delivery: 15 days
#170

CLONING PAPER ROLL

AS PER STANDARDS

4 roll Delivery: 15 days
#171

GEL NAIL PAINT DIFF. COLOR

AS PER STANDARDS

2 box Delivery: 15 days
#172

HAIR COLOR TUBE 3 NO AND 4 NO LOREAL

AS PER STANDARDS

3 tube each Delivery: 15 days
#173

NAIL ART TOOL KIT

AS PER STANDARDS

10 pkt Delivery: 15 days
#174

NAIL POLISH REMOVER

AS PER STANDARDS

10 bottle Delivery: 15 days
#175

RICA WAX POST OIL 500 ML BOTTLE

AS PER STANDARDS

2 no Delivery: 15 days
#176

RICA WAX PRE OIL 500 ML BOTTLE

AS PER STANDARDS

2 no Delivery: 15 days
#177

SHINER BLEACH

AS PER STANDARDS

4 no Delivery: 15 days
#178

TOP COAT SHINY

AS PER STANDARDS

1 box Delivery: 15 days
#179

WAX POLISH

AS PER STANDARDS

500 gm Delivery: 15 days
#180

WOODEN SPETULA

AS PER STANDARDS

200 no Delivery: 15 days
#181

RJ 45 SOCKET

AS PER STANDARDS

50 no Delivery: 15 days

Categories 133

EVAPORATOR ELECTRODE HOLDER APPARELS PRINTING SERVICES APFC PANEL COAXIAL CABLE COAXIAL WIRE AXLE ALTERNATOR WAXES BULB RING MATCH BOX SUB STATION CABBING EQUIPMENTS COMPRESSOR FENCING WIRE PAPER ROLL AIR COOLED ENGINE CABLE LADDER SWITCH YARD ANTISEPTIC LIQUID & CREAM WHEAT FLOUR OFFSET PRINTING DIRECT TRANSFORMER ELECTROCARDIOGRAPHY UNITS SILVER FOIL CHANNEL DISTILLATION TONGUE WIRE AGRICULTURAL PUMP DISCRETE COMPONENTS ART ELECTRICAL WIRE STEEL WIRE PIPING SOLAR LANTERN CFL INSULATED WIRE CENTRIFUGAL PUMP VACUUM CIRCUIT BREAKER PROMOTIONAL ITEM RF CABLE PROCUREMENT OF TSHIRT INSTRUMENTATION CABLE GI WIRE MECHANICAL EQUIPMENT ELECTRICAL SUBSTATION HEATER STATIC CONVERTERS DIMMER SWITCHES DIAMONDS MICRO CONTROLLER IRRIGATION PUMPS WATER SUPPLY PANEL STOMACHERS CONDUCTOR PUMPS CAPACITOR CABLING ENGINE SOCKET POWER WIRE SUPPLY OT CEILING LIGHT REFRIGERATION SYSTEM CENTRIFUGAL MACHINE MS WIRE PAPER AND PRINTING SERVICES COMPUTER ACCESSORIES LED LUMINARIES LOCAL AREA NETWORK CABLING ARTS CRAFTS AND GIFT ARTICLES FLUID MECHANICS EQUIPMENT ALUMINIUM FOIL ELECTRODES SOLAR PANEL SHIELDED CABLE GLUCOMETER FALL PROTECTION LANYARD FOIL SOLAR CELL HOOKUP WIRE GL WIRE BOOT POLISH LED LIGHT PNEUMATIC HYDRAULIC MACHINES POWER WIRE ELECTRICAL CONDENSER TUBE SCBA STRAIN RELIEFS BOX OIL PUMP VALVE WIRE FILTER RETAINERS RESISTOR WINDING WIRE TURBINE PUMPS ARC WELDING FLUORESCENT LAMP PAINTS AND PRIMERS BRAKE TUBES AND PIPES GALVANIZED WIRE GAS BURNERS MEDICINE BACKHOE BULK MILK COOLER TOOL KIT CABLE AXIAL SPLIT PUMPS BATTERY HOLDERS FIRE BREATHING APPARATUS SLEEVE MACHINE GAUGE BATTERY VALVE PARTS AND ACCESSORIES BUSBAR ELECTRONIC TIMER HYDRAULIC RIBBON CABLE WATER PUMP PUMPING MACHINEY ELECTROMAGNET CABLE TRAY FAN BAR SEAT VALVE AUDIO VISUAL ACCESSORY

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates (if any related to ISI standard goods)

4

Financial statements or balance sheet (as required by T&C)

5

EMD submission document (₹15,000 DD payable to PRINCIPAL INDUSTRIAL TRAINING INSTITUTE, GANDHINAGAR)

6

Technical bid documents demonstrating ISI compliance and authenticity certificates

7

OEM authorizations or certificates of authenticity for supplied ISI-standard goods

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid for ISI standard goods tender in Gandhinagar Gujarat 2026

Bidders must meet Gujarat office eligibility, submit GST and PAN, provide ISI conformity certificates, and attach a mandatory EMD of ₹15,000 via DD to PRINCIPAL INDUSTRIAL TRAINING INSTITUTE, GANDHINAGAR. Complete prices must be quoted on GeM with GST included; delivery is 15 days and penalties apply for delays.

What documents are required for ISI goods tender in Gujarat

Required documents include GST registration, PAN card, authenticity certificates for submitted documents, financial statements, EMD ₹15,000, and any OEM authorizations or ISI conformity certificates. All items must be ISI-standard; Gujarat office proof is essential.

What are the delivery terms and penalties for late ISI goods

Delivery must be completed within 15 days from order date. A late delivery incurs a penalty of 0.5% of the contract value per week, with extended time allowed only as per the option clause up to 25% quantity variation.

What standards and certifications are required for ISI goods

Supplied goods must be ISI-standard with ISI/BIS compliance. Rejection occurs if non-conforming; replacement with proper ISI-compliant goods must be completed within the specified time frame.

How is payment processed for this Gujarat procurement

Payment is processed per Government norms via GeM; item-wise confirmation is required before payment, and GST-inclusive invoices are expected in the GeM portal.

What is the role of EMD in this tender in Gandhinagar

EMD of ₹15,000 secures bid participation; payable by Demand Draft to the Principal Industrial Training Institute, Gandhinagar; failure to meet bid conditions could lead to EMD forfeiture as per ATC terms.

Are there quantity variation provisions in this tender

Yes, the purchaser may increase/decrease quantity up to 25% of bid quantity at contract time and during the currency; delivery time adjusts proportionally with a minimum of 30 days, subject to original delivery period.

What conditions govern ISI conformity and replacements

If goods fail ISI verification, they must be replaced at the supplier’s cost within the time limit; non-conforming items lead to rejection and payment contingencies as per GeM rules.