MANDAP CEILING CLOTH,MANDAP SHED WATER PROOF TEENSHEET,MANDAP SHED WATER PROOF PLASTIC SHEET,SIDE C
Kendriya Vidyalaya Sangathan
PUNE, MAHARASHTRA
Bid Publish Date
11-Mar-2026, 6:29 pm
Bid End Date
26-Mar-2026, 7:00 pm
EMD
₹1,05,000
Value
₹35,00,000
Location
Progress
Quantity
267272
Category
MANDAP WITHOUT ZOOL-1 DAY
Bid Type
Two Packet Bid
Revenue Department, Government of Gujarat invites bids for a comprehensive set of event infrastructure and ancillary items in BANASKANTHA, GUJARAT for temporary stage, seating, lighting, sound, safety barricades, and related fittings. Estimated value is ₹3,500,000 with an EMD of ₹105,000. The procurement encompasses 57 items including stages, backdrops, chairs (PVC/plastic), tables, lighting fixtures (LEDs, floodlights, halogens), sound systems, podiums, and safety barriers. The scope includes delivery, installation, and possible on-site setup for event days spanning multiple day tokens. The tender emphasizes standardized performance on a per-item basis, with bulk/kit delivery and potential quantity adjustments of up to 25%, at contracted rates. A strong emphasis on timely delivery and post-award service is implied. Bidders should note the geographic requirement for service support and the possibility of OEM turnover criteria. This opportunity is location-specific, targeting suppliers capable of handling large on-site event infrastructure within Gujarat. The unique aspect is the bundled, multi-item event setup in a single procurement window, requiring cohesive logistics and integration across 57 distinct line items.
Option to vary quantity up to 25% at contracted rates
OEM turnover must meet minimum annual turnover for 3 years
Functional service center in the state for carry-in warranty required
Payment terms linked to delivery milestones; EMD to be submitted with bid; standard supplier payment processing upon completion of services and acceptance.
Delivery period to be adjusted per option clause; minimum delivery extension 30 days; delivery starts from last date of original delivery order.
Penalties may apply for delayed delivery or non-conformance per contract terms; LD percentage and schedule to be defined in the award order.
Minimum average annual turnover as specified for last 3 financial years
OEM turnover meeting required thresholds for primary product
Functional service centers or ability to establish in Gujarat within 30 days
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
MANDAP WITHOUT ZOOL-1 DAY , MANDAP WITHOUT ZOOL- 2 DAY , MANDAP SIDE WALL 6 FT HEIGHT-1 DAY , MANDAP SIDE WALL 6 FT HEIGHT-2 DAY , TEMPORARY WOODEN RAMP-1 DAY , 100 MTR BOUNDRY WITH LIME , STAGE AND STAIR WITH CARPET-2 DAY , STAGE BACKDROP-1 DAY , GREEN FLOORING-2 DAY , RAJAI-1 DAY , CHADAR-1 DAY , SHETRANJI-1 DAY , GADLA-1 DAY , OSHIKU-1 DAY , WOODEN BARRICATING-2 DAY , BARRICATING OF IRON PIPE-2 DAY , PVC PLASTIC CHAIR-1 DAY , PVC PLASTIC CHAIR-2 DAY , PVC PLASTIC CHAIR-3 DAY , PVC PLASTIC CHAIR-20 TO 30 DAY , REVOLVING CHAIR-2 DAY , TIPOI-5 DAY , TABLE 3 BY 2 WITHOUT CLOTH-1 DAY , TABLE 3 BY 2 WITH CLOTH-2 DAY , TABLE 3 BY 2 WITHOUT CLOTH-3 DAY , TABLE 3 BY 2 WITH CLOTH-20 TO 30 DAY , SOFA 1 SEATER- 1 DAY , SOFA 2 SEATER-1 DAY , SOFA 3 SEATER-1 DAY , GALVANIZED IRON MESH-1 DAY , LED TUBELIGHT 22 WATT- 1 DAY , LED TUBELIGHT 22 WATT-2 DAY , LED TUBELIGHT 22 WATT-20 TO 30 DAY , FLOOD LIGHT 100 WATT-1 DAY , FLOOD LIGHT 100 WATT-2 DAY , FLOOD LIGHT 100 WATT- 20 TO 30 DAY , HALOGEN 500 WATT-1 DAY , HALOGEN 500 WATT-2 DAY , HALOGEN 500 WATT-20 TO 30 DAY , HALOGEN 1000 WATT-1 DAY , HALOGEN 1000 WATT-2 DAY , HALOGEN 1000 WATT-20 TO 30 DAY , SIMPLE SOUND SYSTEM-2 DAY , SIMPLE SOUND SYSTEM-20 TO 30 DAY , MICROPHONE-2 DAY , Pedal Stand Fan-2 DAY , Ceiling Fan- 2 DAY , TEMPORARY PLUG POINT 15AMP-1 DAY , DISTRIBUTION BOARD THREE PHASE 440 WATT 4-6 WAY-1 DAY , DISTRIBUTION BOARD THREE PHASE 440 WATT 8-12 WAY-1 DAY , GENERATOR SET 125 KVA-1 DAY , CHANGE OVER SWITCH 4 POLL 100-125 AMPERE-2 DAY , CHANGE OVER SWITCH 4 POLL 200-300 AMPERE-2 DAY , ELCB SWITCH SINGLE PHASE 40 AMPERE DP-2 DAY , 3.5 KV UPS 4 HOUR BACKUP-2 DAY , Podium
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Kendriya Vidyalaya Sangathan
PUNE, MAHARASHTRA
Indian Army
PANCHKULA, HARYANA
Indian Coast Guard
NORTH 24 PARGANAS, WEST BENGAL
Indian Coast Guard
DAMAN, DAMAN & DIU
Power Grid Corporation Of India Limited
Tender Results
Loading results...
MANDAP WITHOUT ZOOL-1 DAY
MANDAP WITHOUT ZOOL
MANDAP WITHOUT ZOOL-2 DAY
MANDAP WITHOUT ZOOL
MANDAP SIDE WALL 6 FT HEIGHT-1 DAY
6 FT HEIGHT
MANDAP SIDE WALL 6 FT HEIGHT-2 DAY
6 FT HEIGHT
TEMPORARY WOODEN RAMP-1 DAY
1,12- 3 FT WIDTH MINIMUM
100 MTR BOUNDRY WITH LIME
880 POLLING STATION
STAGE AND STAIR WITH CARPET-2 DAY
STAGE AND STAIR WITH CARPET
STAGE BACKDROP-1 DAY
BLUE-WHITE COLOUR
GREEN FLOORING-2 DAY
GREEN FLOORING
RAJAI-1 DAY
RAJAI
CHADAR-1 DAY
CHADAR
SHETRANJI-1 DAY
SHETRANJI
GADLA-1 DAY
GADLA
OSHIKU-1 DAY
OSHIKU
WOODEN BARRICATING-2 DAY
6 FT HEIGHT
BARRICATING OF IRON PIPE-2 DAY
6 FT HEIGHT
PVC PLASTIC CHAIR-1 DAY
PVC PLASTIC CHAIR
PVC PLASTIC CHAIR-2 DAY
PVC PLASTIC CHAIR
PVC PLASTIC CHAIR-3 DAY
PVC PLASTIC CHAIR
PVC PLASTIC CHAIR-20 TO 30 DAY
PVC PLASTIC CHAIR
REVOLVING CHAIR-2 DAY
REVOLVING CHAIR
TIPOI-5 DAY
STANDRAD SIZE
TABLE 3 BY 2 WITHOUT CLOTH-1 DAY
TABLE 3 BY 2 WITHOUT CLOTH
TABLE 3 BY 2 WITH CLOTH-2 DAY
TABLE 3 BY 2 WITH CLOTH
TABLE 3 BY 2 WITHOUT CLOTH-3 DAY
TABLE 3 BY 2 WITHOUT CLOTH
TABLE 3 BY 2 WITH CLOTH-20 TO 30 DAY
TABLE 3 BY 2 WITH CLOTH
SOFA 1 SEATER-1 DAY
SOFA 1 SEATER
SOFA 2 SEATER-1 DAY
SOFA 2 SEATER
SOFA 3 SEATER-1 DAY
SOFA 3 SEATER
GALVANIZED IRON MESH-1 DAY
GALVANIZED IRON MESH
LED TUBELIGHT 22 WATT-1 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
LED TUBELIGHT 22 WATT-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
LED TUBELIGHT 22 WATT-20 TO 30 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
FLOOD LIGHT 100 WATT-1 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
FLOOD LIGHT 100 WATT-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
FLOOD LIGHT 100 WATT-20 TO 30 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
HALOGEN 500 WATT-1 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
HALOGEN 500 WATT-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
HALOGEN 500 WATT-20 TO 30 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
HALOGEN 1000 WATT-1 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
HALOGEN 1000 WATT-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
HALOGEN 1000 WATT-20 TO 30 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
SIMPLE SOUND SYSTEM-2 DAY
WITH SPEAKER, EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT
SIMPLE SOUND SYSTEM-20 TO 30 DAY
WITH SPEAKER, EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT
MICROPHONE-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
Pedal Stand Fan-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
Ceiling Fan-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
TEMPORARY PLUG POINT 15AMP-1 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
DISTRIBUTION BOARD THREE PHASE 440 WATT 4-6 WAY-1 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
DISTRIBUTION BOARD THREE PHASE 440 WATT 8-12 WAY-1 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
GENERATOR SET 125 KVA-1 DAY
WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
CHANGE OVER SWITCH 4 POLL 100-125 AMPERE-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
CHANGE OVER SWITCH 4 POLL 200-300 AMPERE-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
CHANGE OVER SWITCH 4 POLL 200-300 AMPERE-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
ELCB SWITCH SINGLE PHASE 40 AMPERE DP-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
3.5 KV UPS 4 HOUR BACKUP-2 DAY
WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT
Podium
Podium
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | MANDAP WITHOUT ZOOL-1 DAY | MANDAP WITHOUT ZOOL | 10,000 | per sq feet | acc-vavtharad | 120 | |
| 2 | MANDAP WITHOUT ZOOL-2 DAY | MANDAP WITHOUT ZOOL | 95,000 | per sq feet | acc-vavtharad | 120 | |
| 3 | MANDAP SIDE WALL 6 FT HEIGHT-1 DAY | 6 FT HEIGHT | 5,000 | per running feet | acc-vavtharad | 120 | |
| 4 | MANDAP SIDE WALL 6 FT HEIGHT-2 DAY | 6 FT HEIGHT | 10,000 | per running feet | acc-vavtharad | 120 | |
| 5 | TEMPORARY WOODEN RAMP-1 DAY | 1,12- 3 FT WIDTH MINIMUM | 100 | per piece | acc-vavtharad | 120 | |
| 6 | 100 MTR BOUNDRY WITH LIME | 880 POLLING STATION | 880 | per polling station | acc-vavtharad | 120 | |
| 7 | STAGE AND STAIR WITH CARPET-2 DAY | STAGE AND STAIR WITH CARPET | 200 | per sq feet | acc-vavtharad | 120 | |
| 8 | STAGE BACKDROP-1 DAY | BLUE-WHITE COLOUR | 5,000 | per sq feet | acc-vavtharad | 120 | |
| 9 | GREEN FLOORING-2 DAY | GREEN FLOORING | 95,000 | per sq feet | acc-vavtharad | 120 | |
| 10 | RAJAI-1 DAY | RAJAI | 2,000 | per piece | acc-vavtharad | 120 | |
| 11 | CHADAR-1 DAY | CHADAR | 2,000 | per piece | acc-vavtharad | 120 | |
| 12 | SHETRANJI-1 DAY | SHETRANJI | 3,000 | per piece | acc-vavtharad | 120 | |
| 13 | GADLA-1 DAY | GADLA | 3,000 | per piece | acc-vavtharad | 120 | |
| 14 | OSHIKU-1 DAY | OSHIKU | 3,000 | per piece | acc-vavtharad | 120 | |
| 15 | WOODEN BARRICATING-2 DAY | 6 FT HEIGHT | 8,000 | per running feet | acc-vavtharad | 120 | |
| 16 | BARRICATING OF IRON PIPE-2 DAY | 6 FT HEIGHT | 8,000 | per running feet | acc-vavtharad | 120 | |
| 17 | PVC PLASTIC CHAIR-1 DAY | PVC PLASTIC CHAIR | 2,000 | per piece | acc-vavtharad | 120 | |
| 18 | PVC PLASTIC CHAIR-2 DAY | PVC PLASTIC CHAIR | 3,000 | per piece | acc-vavtharad | 120 | |
| 19 | PVC PLASTIC CHAIR-3 DAY | PVC PLASTIC CHAIR | 500 | per piece | acc-vavtharad | 120 | |
| 20 | PVC PLASTIC CHAIR-20 TO 30 DAY | PVC PLASTIC CHAIR | 80 | per piece | acc-vavtharad | 120 | |
| 21 | REVOLVING CHAIR-2 DAY | REVOLVING CHAIR | 20 | per piece | acc-vavtharad | 120 | |
| 22 | TIPOI-5 DAY | STANDRAD SIZE | 10 | per piece | acc-vavtharad | 120 | |
| 23 | TABLE 3 BY 2 WITHOUT CLOTH-1 DAY | TABLE 3 BY 2 WITHOUT CLOTH | 500 | per piece | acc-vavtharad | 120 | |
| 24 | TABLE 3 BY 2 WITH CLOTH-2 DAY | TABLE 3 BY 2 WITH CLOTH | 500 | per piece | acc-vavtharad | 120 | |
| 25 | TABLE 3 BY 2 WITHOUT CLOTH-3 DAY | TABLE 3 BY 2 WITHOUT CLOTH | 100 | per piece | acc-vavtharad | 120 | |
| 26 | TABLE 3 BY 2 WITH CLOTH-20 TO 30 DAY | TABLE 3 BY 2 WITH CLOTH | 100 | per piece | acc-vavtharad | 120 | |
| 27 | SOFA 1 SEATER-1 DAY | SOFA 1 SEATER | 10 | per piece | acc-vavtharad | 120 | |
| 28 | SOFA 2 SEATER-1 DAY | SOFA 2 SEATER | 30 | per piece | acc-vavtharad | 120 | |
| 29 | SOFA 3 SEATER-1 DAY | SOFA 3 SEATER | 30 | per piece | acc-vavtharad | 120 | |
| 30 | GALVANIZED IRON MESH-1 DAY | GALVANIZED IRON MESH | 8,000 | per sq feet | acc-vavtharad | 120 | |
| 31 | LED TUBELIGHT 22 WATT-1 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 130 | per piece | acc-vavtharad | 120 | |
| 32 | LED TUBELIGHT 22 WATT-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 700 | per piece | acc-vavtharad | 120 | |
| 33 | LED TUBELIGHT 22 WATT-20 TO 30 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 50 | per piece | acc-vavtharad | 120 | |
| 34 | FLOOD LIGHT 100 WATT-1 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 20 | per piece | acc-vavtharad | 120 | |
| 35 | FLOOD LIGHT 100 WATT-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 80 | per piece | acc-vavtharad | 120 | |
| 36 | FLOOD LIGHT 100 WATT-20 TO 30 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 10 | per piece | acc-vavtharad | 120 | |
| 37 | HALOGEN 500 WATT-1 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 40 | per piece | acc-vavtharad | 120 | |
| 38 | HALOGEN 500 WATT-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 80 | per piece | acc-vavtharad | 120 | |
| 39 | HALOGEN 500 WATT-20 TO 30 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 10 | per piece | acc-vavtharad | 120 | |
| 40 | HALOGEN 1000 WATT-1 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 20 | per piece | acc-vavtharad | 120 | |
| 41 | HALOGEN 1000 WATT-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 20 | per piece | acc-vavtharad | 120 | |
| 42 | HALOGEN 1000 WATT-20 TO 30 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 10 | per piece | acc-vavtharad | 120 | |
| 43 | SIMPLE SOUND SYSTEM-2 DAY | WITH SPEAKER, EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT | 10 | per piece | acc-vavtharad | 120 | |
| 44 | SIMPLE SOUND SYSTEM-20 TO 30 DAY | WITH SPEAKER, EMPLIFIER, CODELESS, MICROPHON REQUIREMENT OF ALL EQUIPMENT AND NESEESARY WIRING AND CABLING AND FROM SOURCE POINT TO DISTRIBUTION POINT | 10 | per piece | acc-vavtharad | 120 | |
| 45 | MICROPHONE-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 10 | per piece | acc-vavtharad | 120 | |
| 46 | Pedal Stand Fan-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 500 | per piece | acc-vavtharad | 120 | |
| 47 | Ceiling Fan-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 200 | per piece | acc-vavtharad | 120 | |
| 48 | TEMPORARY PLUG POINT 15AMP-1 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 100 | per piece | acc-vavtharad | 120 | |
| 49 | DISTRIBUTION BOARD THREE PHASE 440 WATT 4-6 WAY-1 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 80 | per piece | acc-vavtharad | 120 | |
| 50 | DISTRIBUTION BOARD THREE PHASE 440 WATT 8-12 WAY-1 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 80 | per piece | acc-vavtharad | 120 | |
| 51 | GENERATOR SET 125 KVA-1 DAY | WITH FUEL, FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 10 | per piece | acc-vavtharad | 120 | |
| 52 | CHANGE OVER SWITCH 4 POLL 100-125 AMPERE-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 4 | per piece | acc-vavtharad | 120 | |
| 53 | CHANGE OVER SWITCH 4 POLL 200-300 AMPERE-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 4 | per piece | acc-vavtharad | 120 | |
| 54 | CHANGE OVER SWITCH 4 POLL 200-300 AMPERE-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 4 | per piece | acc-vavtharad | 120 | |
| 55 | ELCB SWITCH SINGLE PHASE 40 AMPERE DP-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 10 | per piece | acc-vavtharad | 120 | |
| 56 | 3.5 KV UPS 4 HOUR BACKUP-2 DAY | WITH FITTING, HOLDER, WIRING AND CABLING AND OTHER NECESSARY ITEM AND FROM SOURCE POINT TO DISTRIBUTION POINT | 10 | per piece | acc-vavtharad | 120 | |
| 57 | Podium | Podium | 10 | per piece | acc-vavtharad | 120 |
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements for last 3 years or CA certificate indicating turnover
Turnover certificates for OEM if applicable
Experience certificates for similar event infrastructure procurements
OEM authorization letter (where applicable)
Technical bid documents and conforming compliance statements
Proof of EMD payment (DD/online receipt)
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | APPRIZE ENTERPRISE Under PMA | - | 26-03-2026 14:12:11 | |
| 2 | BAJRANG CATERERS Under PMA | - | 26-03-2026 16:52:03 | |
| 3 | GAYTRI CATERERS AND MANDAP DECORATION Under PMA | - | 23-03-2026 20:30:13 | |
| 4 | HETU ENTERPRISE Under PMA | - | 26-03-2026 17:01:03 | |
| 5 | KANAIYA MANDAP DECORATION AND CATTERERS Under PMA | - | 24-03-2026 13:29:38 | |
| 6 | MADALIA MANDAP SERVICE Under PMA | - | 16-03-2026 10:33:38 | |
| 7 | PATNI MANDAP DECORATORS Under PMA | - | 25-03-2026 11:07:04 | |
| 8 | SAVITRI MANDAP & DECORATORS Under PMA | - | 26-03-2026 16:15:26 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | PATNI MANDAP DECORATORS Under PMA | Item Categories : MANDAP WITHOUT ZOOL-1 DAY,MANDAP WITHOUT ZOOL-2 DAY,MANDAP SIDE WALL 6 FT HEIGHT-1 DAY,MANDAP SIDE | |
| L2 | GAYTRI CATERERS AND MANDAP DECORATION Under PMA | Item Categories : MANDAP WITHOUT ZOOL-1 DAY,MANDAP WITHOUT ZOOL-2 DAY,MANDAP SIDE WALL 6 FT HEIGHT-1 DAY,MANDAP SIDE | |
| L3 | SAVITRI MANDAP & DECORATORS Under PMA | Item Categories : MANDAP WITHOUT ZOOL-1 DAY,MANDAP WITHOUT ZOOL-2 DAY,MANDAP SIDE WALL 6 FT HEIGHT-1 DAY,MANDAP SIDE |
Please sign in or create an account to view contract details and download result documents.
Key insights about GUJARAT tender market
Bidders must meet essential eligibility: complete turnover criteria for last 3 financial years, provide audited statements or CA certificate, submit GST and PAN, include EMD of ₹105,000, and OEM authorization if applicable. Include service capability within Gujarat and a plan to establish if absent. Follow terms and upload required documents.
Submit GST registration, PAN, audited financials or CA turnover certificate for last 3 years, OEM authorization (if applicable), service center proof in Gujarat, EMD payment proof, experience certificates for similar procurements, technical bid; ensure bid documents align with terms and conditions in the tender package.
The tender covers mandap, stage, lighting, sound, chairs, tables, barricading, carpets, backdrop, podium, and power equipment. While item-level specs are not detailed, ensure IS/ safety compliance for electrical items, appropriate load ratings on distribution boards, UPS, generators, and compliance with standard maintenance practices.
Delivery timelines are governed by the option clause allowing up to 25% quantity variation at contract rates; the base delivery period is set by the purchase order and may include a minimum 30-day extension. Expect staged delivery aligned with last date of the original order.
EMD is set at ₹105,000. Submit via demand draft or online payment as per bid guidelines. Ensure EMD is valid for the bid validity period and accompanies the bid submission; failure to provide EMD can lead to bid rejection.
Bidder or OEM must maintain a functional service center in the consignee state; if not, establish one within 30 days of award. Carry-in warranty items require local service support; on-site warranty items may have different terms as per contract.
Submit audited balance sheets or CA certificate showing average annual turnover for last 3 years; if the OEM is <3 years old, use completed years post-incorporation. For bunch bids, the primary product’s OEM turnover must meet the threshold.
Payment terms typically follow milestones tied to delivery/acceptance; ensure EMD submission and compliance with tender terms. The contract may specify staged payments; confirm with the awarding authority and attach delivery/acceptance certificates to trigger payments.
N/a
📍 GHAZIABAD, UTTAR PRADESH
Bharat Dynamics Limited
📍 HYDERABAD, TELANGANA
N/a
Damodar Valley Corporation
📍 DHANBAD, JHARKHAND
Hll Infra Tech Services Limited
📍 GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS