The Indian Council of Agricultural Research (ICAR), Department of Agricultural Research and Education, seeks to procure a Fish Smoking Kiln system suitable for two delivery locations in India. The scope includes Supply, Installation, Testing, Commissioning, and Operator Training, with statutory clearances as applicable. Locations include Manipur and Arunachal Pradesh per ATC directives, totaling 5 units (2 at Manipur, 3 at Arunachal Pradesh) as indicated by the Buyer Added ATC. The contract allows quantity variation up to 25% and delivery timelines anchored to original delivery terms, with extensions calculated per the option clause. This procurement emphasizes turnkey deployment and post-installation training to ensure operability at the two sites.
Product/service: Fish Smoking Kiln systems for government procurement
Quantities/locations: 2 units at Manipur, 3 units at Arunachal Pradesh per ATC
EMD/Value: Not specified in data; confirm in ATC
Experience: Prior turnkey supply, installation, testing, commissioning, and training
Quality/standards: Confirm IS/ISO certifications in ATC and supplier's quality management
Option Clause allows +/-25% quantity variation at contract rates
Delivery period begins after last date of original delivery order with minimum 30 days
Scope includes supply, installation, testing, commissioning, and operator training
Delivery period starts from the last date of the original delivery order; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Bid price must cover all cost components for Supply, Installation, Testing, Commissioning, and Training of operators; statutory clearances if required
Purchaser may increase/decrease quantity by up to 25% during contract and extend delivery within contracted rates
Demonstrated ability to supply and install turnkey fish smoking kiln systems at two regional sites
Financial capacity evidenced by recent statements
Compliance with ATC terms and ability to provide operator training
Quantity
5
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Fish Smoking Kiln
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Nainital
Delivery Pincodes
263136
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ankesh Kumar Sinha | 263136,Anusandhan Bhawan, Industrial area, Bhimtal | Nainital | Uttarakhand | 263136 | 5 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration
PAN card
Experience certificates for similar turnkey equipment supply, installation, and commissioning
Financial statements demonstrating current financial capacity
EMD/Security deposit documentation (if required by ATC)
Technical bid documents showing compliance with scope of supply
OEM authorizations or manufacturer’s consent (if applicable)
Any statutory clearance certificates relevant to installation at two sites
Key insights about UTTARAKHAND tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD (if required) along with technical bid. Ensure ATC compliance, turnkey scope including installation, testing, commissioning, and operator training. Confirm delivery at Manipur and Arunachal Pradesh sites per ATC.
Required documents include GST certificate, PAN card, experience certificates for similar turnkey projects, financial statements, EMD evidence, OEM authorizations, and technical bid detailing installation, testing, commissioning, and training plans; ATC may specify additional statutory clearances.
Delivery is specified at two locations: Manipur (2 units) and Arunachal Pradesh (3 units) as per the Buyer Added ATC document; ensure site readiness and installation logistics for remote regional sites.
Scope includes Supply, Installation, Testing, Commissioning, and Operator Training; bid must include all costs and any required statutory clearances; ATC governs site-specific requirements.
Yes. The purchaser reserves the right to increase or decrease the quantity up to 25% of bid quantity at contract signing and during currency at the same contracted rates; delivery period adjusts accordingly with a minimum 30 days extension.
Bidders should verify IS/ISO certifications and any OEM/brand requirements in the ATC; ensure quality management and installation standards align with government procurement expectations.
The ATC requires turnkey delivery including installation, testing, commissioning, and operator training; timelines align with the original delivery schedule and any extended period as per the option clause, with site-specific readiness ensured.
Payment terms are to be detailed in ATC; bidders should anticipate milestone-based payments tied to delivery, installation, testing, and training, with potential requirement for statutory clearances and acceptance testing before final payment.