Y3 5970-000575,B3 1005-002788,Z9 RP-6140-000393,Z9 RP-6140-MISC-CQAL-4484,Y3 RP-6135-001362
Indian Army
Bid Publish Date
02-Jun-2026, 11:20 am
Bid End Date
12-Jun-2026, 12:00 pm
EMD
₹2,47,117
Location
Progress
Quantity
1999
Category
Y3 6135-000008 BY DY 1.5 VT 5
Bid Type
Two Packet Bid
Organization: Indian Army (Department Of Military Affairs). Procurement scope covers multiple line items coded under Y3 WB-1502 BT DY LAP ELE, Y3 6135-000044 BT DY 9V, Z9 6140MISCCQAL4484 BSL 12 75WT BX, Z9 6140-005208 BY PT LITH 10A, and other related catalog codes. Estimated value and exact quantities are not disclosed; EMD: ₹247,117. Location: India; delivery/installation address specified as COMDT. Context: formal government procurement to supply or fabricate military-grade components, with design drawings and samples required prior to bulk manufacture. A distinguishing factor is the ATC-driven validation through advance samples and drawings approvals, with risk-sharing on approval delays.
Product/service category: military-grade components referenced by codes (Y3 WB-1502 BT DY LAP ELE, Y3 6135-000044 BT DY 9V, Z9 6140MISCCQAL4484 BSL 12 75WT BX, Z9 6140-005208 BY PT LITH 10A, Y3 6135-000008 BY DY 1.5 VT 5, Z9 MISCCQALBTY PRIMARY 114 BT AKLE 1.5 TYPE, Z9 6140-005301 BTY SNDY PTY LION)
EMD amount: ₹247,117
Delivery: COMDT address; on-site delivery as per contract drawings
Quality/approval: advance sample approval; detailed drawings approval; modifications as directed by Buyer
Advance sample must be submitted within 5 days of award and approvals completed within 5 days to avoid delivery delays
Detailed Design Drawings require Buyer approval within 5 days; deviations may lead to modifications or contract termination
Post-receipt inspection by BOARD OF OFFICERS; pre-dispatch inspection possible only if ATC selects it
Advance sample costs borne by seller; bulk supply aligned to approved sample; no LD specified for drawing/approval delays
Delivery timeline is contingent on approval of advance sample and detailed drawings; delays in buyer approvals extend delivery without LD
Penalties not explicitly stated; contract termination possible for major deviations in samples/drawings
Minimum average annual turnover criterion for last 3 financial years (exact threshold not disclosed)
Experience in supplying military-grade components or similar procurement
Compliance with ATC terms including sample approvals and drawings approvals
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Y3 WB-1502 BT DY LAP ELE , Y3 6135-000044 BT DY 9V , Z9 6140MISCCQAL4484 BSL 12 75WT BX , Z9 6140-005208 BY PT LITH 10A , Y3 6135-000008 BY DY 1.5 VT 5 , Z9 MISCCQALBTY PRIMARY 114 BT AKLE 1.5 TYPE , Z9 6140- 005301 BTY SNDY PTY LION
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
Indian Army
KANGRA, HIMACHAL PRADESH
N/A
KANGRA, HIMACHAL PRADESH
Indian Army
KANGRA, HIMACHAL PRADESH
Tender Results
Loading results...
Y3 WB-1502 BT DY LAP ELE
Y3 WB-1502 BT DY LAP ELE
Y3 6135-000044 BT DY 9V
Y3 6135-000044 BT DY 9V
Z9 6140MISCCQAL4484 BSL 12 75WT BX
Z9 6140MISCCQAL4484 BSL 12 75WT BX
Z9 6140-005208 BY PT LITH 10A
Z9 6140-005208 BY PT LITH 10A
Y3 6135-000008 BY DY 1.5 VT 5
Y3 6135-000008 BY DY 1.5 VT 5
Z9 MISCCQALBTY PRIMARY 114 BT AKLE 1.5 TYPE
Z9 MISCCQALBTY PRIMARY 114 BT AKLE 1.5 TYPE
Z9 6140-005301 BTY SNDY PTY LION
Z9 6140-005301 BTY SNDY PTY LION
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Y3 WB-1502 BT DY LAP ELE | Y3 WB-1502 BT DY LAP ELE | 1,179 | nos | hqjcoic | 60 | |
| 2 | Y3 6135-000044 BT DY 9V | Y3 6135-000044 BT DY 9V | 98 | nos | hqjcoic | 60 | |
| 3 | Z9 6140MISCCQAL4484 BSL 12 75WT BX | Z9 6140MISCCQAL4484 BSL 12 75WT BX | 495 | nos | hqjcoic | 60 | |
| 4 | Z9 6140-005208 BY PT LITH 10A | Z9 6140-005208 BY PT LITH 10A | 65 | nos | hqjcoic | 60 | |
| 5 | Y3 6135-000008 BY DY 1.5 VT 5 | Y3 6135-000008 BY DY 1.5 VT 5 | 100 | nos | hqjcoic | 60 | |
| 6 | Z9 MISCCQALBTY PRIMARY 114 BT AKLE 1.5 TYPE | Z9 MISCCQALBTY PRIMARY 114 BT AKLE 1.5 TYPE | 20 | nos | hqjcoic | 60 | |
| 7 | Z9 6140-005301 BTY SNDY PTY LION | Z9 6140-005301 BTY SNDY PTY LION | 42 | nos | hqjcoic | 60 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar procurements
Financial statements for last 3 years
EMD submission proof (electronic/DD as applicable)
Technical bid documents and compliance statements
OEM authorization letters (if required by ATC)
Detailed design drawings and advance sample submission documents
Bidders must submit the standard bid package with GST, PAN, financials, and experiences; include EMD of ₹247,117 and ensure compliance with ATC rules for advance sample and detailed drawings approvals within 5 days of award, else delays may occur.
Submit GST certificate, PAN, three-year financial statements, experience certificates, EMD proof, technical bid, OEM authorizations if applicable, and drawings/advance samples per ATC; ensure post-receipt inspection readiness by BOARD OF OFFICERS.
Board of Officers conducts post-receipt inspection; pre-dispatch inspection is available only if ATC specifies; ensure readiness for on-site assessment at COMDT delivery location.
Submit 1 advance sample within 5 days of award; the Buyer approves or lists modifications within 5 days; bulk supply must reflect the approved sample; delays adjust delivery period without LD.
EMD is ₹247,117; it demonstrates bid seriousness and secures performance risk; payments/return depend on tender terms and contract award conditions; ensure proper submission with bid documents.
Detailed Design Drawings must be submitted within 5 days of award; Buyer approval or modification list provided within 5 days; non-conformity can lead to contract termination or rework demands.
Delivery/installation is at the COMDT address; scope includes installation if specified in contract and must align with approved drawings and samples.
India Optel Limited
📍 DEHRADUN, UTTARAKHAND
Indian Army
📍 SAGAR, MADHYA PRADESH
Indian Army
📍 SAGAR, MADHYA PRADESH
Indian Army
📍 SAGAR, MADHYA PRADESH
Hindustan Aeronautics Limited (hal)
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS