TenderDekho Logo
GEM

National Aluminium Company Limited Bhubaneswar Heat Sink Block Thyristor Tender 2026 | NIDEC Industrial Automation OEM Authorization | 154 Days

Bid Publish Date

14-Jul-2026, 12:27 pm

Bid End Date

28-Jul-2026, 9:00 am

Location

ANGUL , ODISHA

Progress

Issue14-Jul-2026, 12:27 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

13

Category

HEAT SINK BLOCK

Bid Type

Single Packet Bid

Categories 1

Tender Overview

National Aluminium Company Limited (Nalco), Bhubaneswar, seeks procurement of Heat Sink Block and Thyristor components under Materials division. The tender requires delivery of complete supply within 154 days of order placement to Nalco smelter stores, with a firm, fixed price basis including P&F, freight, transit insurance, and GST where applicable. Only Principal Vendor M/s. NIDEC Industrial Automation or their authorized dealers/distributors may participate, mandating authentic authorization certificates from the principal. A minimum one-year warranty must accompany the material from the date of acceptance at Nalco’s store, and GST treatment will follow actuals or the quoted rate, subject to GST norms. The payment term requests 100% payment within 10 days of CRAC, with GST reflected via the supplier’s invoice in Nalco’s GSTR 2A/ANX-2. This procurement emphasizes compliance with specific vendor authorization and timely delivery, with price-competitiveness as a core criterion. Nalco’s terms also include income tax compliance and holiday/negative list checks prior to award, ensuring vendor eligibility. The tender highlights a single-source OEM pathway and a rigid delivery window, shaping a high-conformity bidding process.

Technical Specifications & Requirements

  • Product category: Heat Sink Block and Thyristor components for Nalco smelter.
  • Delivery timeline: 154 days from order placement.
  • OEM requirement: Only M/s. NIDEC Industrial Automation or their authorized dealers/distributors may participate; submit authentic authorization from principal.
  • Warranty: One-year warranty from material acceptance at Nalco store; warranty certificate to be provided with material.
  • Price basis: Firm and fixed price including all costs: P&F, freight, transit insurance, GST as applicable.
  • GST handling: GST reimbursement as per actuals or applicable rates, subject to a maximum quoted GST percentage.
  • Tax compliance: Vendor TDS considerations under relevant IT acts; GST reflection in Nalco GST returns.
  • Delivery/acceptance: Material acceptance triggers warranty start; payment upon CRAC.
  • Exclusions: Not specified in detail; ensure compliance with Bid Terms and Conditions.

Terms, Conditions & Eligibility

  • Delivery schedule: Complete supply within 154 days of order.
  • OEM authorization: Only principal vendor M/s NIDEC Industrial Automation or authorized dealers may participate; submit valid authorization certificate.
  • Payment terms: 100% payment within 10 days of CRAC; GST reflected in Nalco’s GSTR 2A/ANX-2.
  • Warranty: Minimum one-year warranty from acceptance date; certificate to be submitted with material.
  • GST & Tax: GST handling per actuals or quoted rate; Nalco to reimburse accordingly.
  • Price basis: Firm, fixed price including all costs (P&F, freight, transit insurance, GST).
  • Debarment: Vendors listed as holiday/negative lists by Nalco are ineligible.
  • Documentation: Upload all certificates/documents sought in Bid document, ATC, Corrigendum; non-compliance leads to rejection.

Key Specifications

  • Product/service names: Heat Sink Block, Thyristor components for Nalco smelter

  • Delivery quantity and scope: Complete supply within 154 days; exact quantities not specified in data

  • Estimated value: Not disclosed in tender data

  • EMD: Not specified in provided data; submit as per Nalco terms if applicable

  • Experience requirements: Prior delivery of similar electrical/thermal components advisable

  • Quality/standards: Not explicitly specified; comply with OEM and Nalco terms

  • Warranty: 1-year warranty from acceptance with warranty certificate

Terms & Conditions

  • Key Term 1: OEM authorization required from M/s NIDEC Industrial Automation or authorized dealers

  • Key Term 2: 154-day delivery timeline from order placement

  • Key Term 3: 100% payment within 10 days of CRAC; GST as per actuals or quoted rate

Important Clauses

Payment Terms

100% payment within 10 days of CRAC; GST reflected in GSTR 2A/ANX-2

Delivery Schedule

Complete supply to Nalco smelter stores within 154 days from order placement

Penalties/Liquidated Damages

Not detailed in provided data; bidders should review Bid Terms and Conditions for LD or penalties

Bidder Eligibility

  • Participation restricted to M/s NIDEC Industrial Automation or its authorized dealers/distributors

  • Valid OEM authorization from principal vendor required

  • Compliance with Nalco terms on GST, IT, and payment processes

  • No holiday/negative list status with Nalco at time of due diligence

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

HEAT SINK BLOCK , THYRISTOR

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

154

Delivery Locations

1

Delivery Cities

Anugul

Delivery Pincodes

759145

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
SUBHENDU MISHRA759145,PURCHASE DEPARTMENT, NALCO SMELTER PLANT, NALCO NAGARAnugulOdisha7591451154-

Authority Records

MINISTRY OF MINESNATIONAL ALUMINIUM COMPANY LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9554197.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Tender Notice for THYRISTOR SET in Ranipet, TAMIL NADU

N/A

Ranipet, TAMIL NADU

Posted: 30 July 2025
Closed: 1 August 2025
EPROCURE

Bids are Invited For PHASE CONTROL THYRISTOR in BENGALURU URBAN, KARNATAKA

Bharat Heavy Electricals Limited

BENGALURU URBAN, KARNATAKA

Posted: 21 January 2026
Closed: 30 January 2026
EPROCURE

Thyristor Power Unit

Oil And Natural Gas Corporation Limited

EAST GODAVARI, ANDHRA PRADESH

Posted: 22 December 2025
Closed: 19 January 2026
GEM

Thyristor Power Unit

Directorate Of Purchase And Stores

HYDERABAD, TELANGANA

Posted: 31 May 2025
Closed: 17 June 2025
GEM

THYRISTOR BASED POWER CONTROLLER CUM CONTROL PANEL AS PER TECHNICAL SPECIFICATIONS ATTACHED

Directorate Of Purchase And Stores

HYDERABAD, TELANGANA

Posted: 5 June 2025
Closed: 27 June 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates showing prior similar supply, if any

4

Audited financial statements for the last 2 financial years

5

EMD/Security deposit as applicable (if required by Nalco terms)

6

Technical bid documents demonstrating compliance with Heat Sink Block and Thyristor components

7

OEM authorization certificate from M/s NIDEC Industrial Automation or authorized dealer/distributor

8

Warranty certificate sample or template

9

Any other certificates requested in Bid document, ATC and Corrigendum

Frequently Asked Questions

How to bid Nalco heat sink and thyristor tender in Bhubaneswar 2026

Bidders must join via Nalco’s procurement portal, submit OEM authorization from M/s NIDEC Industrial Automation or authorized dealer, provide GST, PAN, experience certificates, and financial statements. Ensure delivery within 154 days, price is firm, and a 1-year warranty is included. Include GST handling details and CRAC-based payment terms.

What documents are required for Nalco heat sink bid in Odisha

Required documents include GST registration, PAN, experience certificates for similar supply, audited financials, OEM authorization from NIDEC, technical bid, warranty certificate, and any atc/corrigendum-specified documents. Ensure submission before bid closing and upload all requested certificates.

What are the delivery terms for Nalco thyristor components tender

Delivery must be completed within 154 days from order placement to Nalco smelter stores. Ensure logistics include P&F, freight, and transit insurance within firm price. Late delivery may trigger penalties per Bid Terms; confirm LD specifics in the final contract.

What are the payment terms for Nalco heat sink block procurement

Nalco offers 100% payment within 10 days of CRAC. GST reflected via supplier invoice in GSTR 2A/ANX-2; ensure supplier invoices match quoted GST rate. Timely invoicing and compliant GST filings are essential to secure payment.

Who can participate in Nalco OEM tender for heat sink block

Only M/s NIDEC Industrial Automation or their authorized dealers/distributors may participate. Submit genuine authorization from the principal vendor; offers from non-authorized entities will be rejected per Section-A terms.

What warranty is required for Nalco heat sink and thyristor supply

A minimum one-year warranty from the date of acceptance at Nalco store is required. Submit a warranty certificate with the material; post-delivery support and replacement terms should align with Nalco’s technical documentation attached to the bid.

What are the GST implications for Nalco procurement bids

GST reimbursement is based on actuals or the quoted GST rate, subject to a maximum percentage. The vendor invoice must be reflected in Nalco’s GST returns (GSTR 2A/ANX-2). Ensure correct GST registration and billing formats to secure reimbursement.

How to verify eligibility before submitting Nalco bid in 2026

Verify inclusion on Nalco’s eligibility criteria: OEM authorization validity for NIDEC, no holiday/negative lists, compliant GST and IT filings, and capability to deliver within 154 days. Prepare all required certificates and ensure bidders meet the 1-year warranty requirement.

Similar Tenders

5 found

Electric Heater & Thyristor Control Panel

Hindustan Aeronautics Limited (hal)

📍 LUCKNOW, UTTAR PRADESH

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Urgent

Thyristor stack,Inverter Array R210SH08CL0 WEST CODE,Inverter Array R270CH08CL0 WEST CODE,Inverter

Bharat Heavy Electricals Limited (bhel)

📍 TIRUCHIRAPPALLI, TAMIL NADU

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM

Dry Block Heater

Captain Srinivasa Murthy Regional Ayurveda Drug Development Institute (csmraddi), Chennai

📍 CHENNAI, TAMIL NADU

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

AIIMS Thermal Block with Heated Lid Tender Jhajjar Haryana 2026 - 3 Years Govt/PSU Supply Experience

All India Institute Of Medical Sciences (aiims)

📍 JHAJJAR, HARYANA

⏰ Deadline: 4 weeks left
🛒 Type: Goods
View GEM

Office Of Dg ( Ns & M) Defence R&D PID Controller & Thyristor Power Unit PAC Only Tender 2026

Office Of Dg ( Ns & M)

📍 HYDERABAD, TELANGANA

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

Explore More Opportunities

Quick Access