CACW COOLER ASSY-1,CACW COOLER (ORDERING) -2,CACW COOLER (ORDERING) -3
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Bid Publish Date
07-Jul-2026, 9:37 am
Bid End Date
17-Jul-2026, 6:00 pm
Location
Progress
Quantity
29
Category
CACW COOLER (ORDERING) -1
Bid Type
Two Packet Bid
Organization: Bharat Heavy Electricals Limited (BHEL) governs a multi-line CACW COOLER procurement with ordering and assembly for CACW COOLER (ORDERING) -1, -2, -3, AIR COOLER CACW (RHS) ASSY-4, and AIR COOLER CACW (LHS) -5. The contract references quantity flexibility up to 25% of bid quantity during order placement and extended periods, with delivery time adjustments calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Inspection terms include post-receipt inspection at the consignee site (BHEL Bhopal) and pre-dispatch at seller premises if ATC selects it. Material Test Certificate (MTC) must accompany supply. Tender emphasizes compliance with uploaded certificates and ATC/Corrigendum requirements. No BOQ items exist in this notice, indicating scope is tied to the CACW cooler assemblies rather than a fixed quantity list.
25% quantity variation during contract and currency
Delivery period adjustments with a minimum 30 days
Post-receipt MTC-based acceptance at BHEL Bhopal
No explicit payment terms stated; standard terms imply adjustment rights and termination rights if terms are not met
Delivery starts from the last date of original Delivery Order; added time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Buyer may terminate for non-performance; penalties or LDs not explicitly detailed in data
Experience in supplying CACW or similar air cooler assemblies
Financial stability with audited statements
Ability to provide Material Test Certificates (MTC) with delivery
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
CACW COOLER (ORDERING) -1 , CACW COOLER ASSY. -2 , CACW COOLER (ORDERING) -3 , AIR COOLER CACW (RHS) ASSY-4 , AIR COOLER CACW (LHS) -5
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
2
Delivery Locations
1
Delivery Cities
Bhopal
Delivery Pincodes
462022
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Arun Kumar | 462022,BHARAT HEAVY ELECTRICAL LTD, PIPLANI | Bhopal | Madhya Pradesh | 462022 | - | 2 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar CACW cooler/air cooler assemblies
Financial statements (audited) or turnover proof
EMD documentation as per ATC (amount not disclosed in data)
Technical bid documents showing compliance with ATC
OEM authorizations or dealership certifications if applicable
Material Test Certificate (MTC) to accompany supply
Key insights about MADHYA PRADESH tender market
Bidders should prepare GST, PAN, and audited financials, plus Experience certificates for CACW/air cooler systems. Upload Material Test Certificate (MTC) with the bid and ensure ATC certificates are current. Ensure post-receipt inspection terms at BHEL Bhopal are understood and quantity variation up to 25% is accepted.
Submit GST registration, PAN card, experience certificates for similar cooling assemblies, audited financial statements, MTC, OEM authorizations if applicable, and technical bid per ATC. Ensure all uploaded certificates match bid requirements to avoid rejection.
Delivery begins from the last date of the original Delivery Order. An increase up to 25% can be ordered with a recalculated extended period using (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Material Test Certificate (MTC) must accompany each supply and will be used by BHEL’s lab to determine acceptance. Nonconformity may lead to rejection; ensure MTC aligns with project standards and supplier QA documentation.
Post-receipt inspection occurs at BHEL Bhopal; pre-dispatch inspection at seller premises if ATC selects it, with QA per QAP. Third-party inspections may be used as per ATC terms to validate conformity before acceptance.
The buyer may terminate for material breach, failure to deliver, insolvency, or misrepresentation. The ATC allows termination if delivery is not met or terms are violated, providing a remedy framework for non-performance.
Bharat Heavy Electricals Limited (bhel)
📍 BHOPAL, MADHYA PRADESH
Indian Army
📍 GWALIOR, MADHYA PRADESH
Indian Army
📍 PUNE, MAHARASHTRA
Bharat Heavy Electricals Limited (bhel)
📍 MUMBAI, MAHARASHTRA
National Institute Of Water And Sanitation (spm-niwas)
📍 SOUTH 24 PARGANAS, WEST BENGAL
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS