Online Ups Modular Type
Directorate Of Municipal Administration
DAVANGARE, KARNATAKA
Progress
Quantity
14
Bid Type
Two Packet Bid
Rural Development And Panchayat Raj Department, Karnataka invites bids for a Modular Online UPS (Q3) to be supplied, installed, tested, and commissioned at Bijapur 586101. Project scope includes supply, installation, testing, and commissioning with on-site comprehensive warranty and PAN India 24x7 service support. Key differentiators include compliance with IS 13947 (Part 1)/1993 latest, CE marking, and full lifecycle support with spares readily available near sites. The tender emphasizes design drawings approval, optional quantity variation up to 25%, and advance sample approvals.
25% quantity variation allowed; delivery time adjusted accordingly with minimum 30 days.
Advance sample approval within 5 days; approved drawings required before fabrication.
GST as per actual; bidders must submit GST details; no responsibility on GST rate.
Scope includes supply, installation, testing, commissioning; post-warranty AMC available.
Pan-India service network requirement; spares availability near sites.
GST payable by bidder; reimbursement as actuals or lower of quoted rate; payment terms not detailed in data.
Delivery period tied to final draw approval and option exercise; extended time calculated as (increased quantity ÷ original quantity) × original delivery period with a floor of 30 days.
LD/penalties not explicitly stated; delivery delays tied to approved drawings imply potential schedule adjustments without LD.
Proven experience in supply, installation, testing and commissioning of modular UPS systems
Demonstrated post-warranty service capability across India (PAN India 24x7)
Financial capability to support bulk purchase and AMC commitments
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Online Ups Modular Type (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Directorate Of Municipal Administration
DAVANGARE, KARNATAKA
Indian Air Force
BIDAR, KARNATAKA
Kodagu Institute Of Medical Sciences
KODAGU, KARNATAKA
Indian Army
TINSUKIA, ASSAM
State Bank Of India (sbi)
Rangareddi, TELANGANA
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Output power capacity including redundancy/Expandable (Rack facility) upto/Minimum backuptime (including redundancy) /Minimum VAH (VAH shall be calculated Battery voltage x Battery Ah x No. of batteries = Total VAH) | 15 KVA/ 30 KVA/ 30 Minutes/ 24000 VAH |
| GENERIC | Noise level | |
| INPUT | In put Voltage Range | 340 V to AC to 470 V AC 3 Phase |
| INPUT | Input frequency range | 50 +/-10% Hz |
| INPUT | Distortion (current) | < / = 3% |
| OUTPUT | Output powr factor | >/=0.99 |
| CONSTRUCTION | Minimum thickness (in mm) of Rack Enclosure for Modular UPS duly powder coated | 1.2 |
| CONSTRUCTION | UPS enclosure's degree of protection as per IS:13947 (Part 1)/1993 latest | IP20 |
| CONSTRUCTION | Total Harmonic Distrotion (THD) for 100% linear load | < 2% |
| CONSTRUCTION | Total Harmonic Distrotion (THD) for 100% non-linear load | < 5% |
| CONSTRUCTION | Over all efficiency on rated full load of 0.8 PF (min.) AC output | >/=96% |
| CONSTRUCTION | Inverter efficiency on rated full load of 0.8 PF (min.) AC output | >/=95% |
| CONSTRUCTION | UPS shall withstand Over load capacity - 125% (Output with mains AC-AC) | for 5 Minutes (Minimum) |
| CONSTRUCTION | UPS shall withstand Over load capacity - 125% (Output in battery run DC-AC) | for 2 Minutes (Minimum) |
| BATTERY | Battery type | SMF VRLA |
| BATTERY | Battery recharge time (after complete discharge to 90% charge) and charge rating: Battery recharge time to 90% charge after 100% DoD | 4 to 8 hours |
| BATTERY | Batteries shall supply with | With metal rack |
| WARRANTY AND SERVICES | Warranty for Modular UPS (on site comprehensive warranty) (in years) | 3 |
| WARRANTY AND SERVICES | Warranty for battery (replacement warranty) (in years) | 3 |
| WARRANTY AND SERVICES | After sales and complaint service | within 48 hours |
| WARRANTY AND SERVICES | PAN India service support on 24 x 7 basis | Yes |
| WARRANTY AND SERVICES | AMC support available after 3 year warranty | Yes |
| WARRANTY AND SERVICES | Quarterly preventive maintenance | Yes |
| WARRANTY AND SERVICES | Manufacturer shall provide and support for installation, commissioning, spares, technical support all over India | Yes |
| WARRANTY AND SERVICES | Availability of spares in close proximity (Spares should be easily available close to the site) | Yes |
| CERTIFICATIONS | CE Certification and marking | No |
| CERTIFICATIONS | Damp Heat Test : in accordance with IS:9000(part 5/sec.2)1981 at Temperature of 40 degree C,two cycles of (12+12) hours each 2007) | Yes |
| CERTIFICATIONS | Dry Heat Test : in accordance with IS:9000 (part 3/sec.5)1977 (reaffirmed 2007) at 55 degree C for 16 hrs | Yes |
| CERTIFICATIONS | Cold Test : in accordance with IS:9000 (Part 2/Sec.4)1977 (Reaffirmed 2007) at -10 degree C for 4 hrs. | Yes |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar Modular UPS projects
Financial statements (latest) demonstrating cash flow/turnover
EMD/Security deposit documentation (as applicable)
Technical compliance certificates and OEM authorizations
Detailed design drawings (within 5 days of award) and advance sample submissions
Warranty/AMC proposals and service level commitments
Key insights about KARNATAKA tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD, OEM authorizations, and technical compliance; ensure 25% quantity variation readiness and advance sample approval within 5 days of award; provide detailed design drawings for buyer approval and confirm 24x7 PAN India service commitment.
Required documents include GST certificate, PAN card, experience certificates for UPS projects, financial statements, EMD documentation, OEM authorizations, and technical bid documents; ensure the advance sample is approved and detailed drawings are submitted within 5 days after award.
The bid requires compliance with IS 13947 (Part 1)/1993 (latest) for enclosure protection, CE marking, and environmental tests per IS9000 series (Damp Heat, Dry Heat, Cold). Battery specs include recharge time to 90% after DoD; THD limits depend on linear/non-linear loads.
The purchaser may increase/decrease quantity by up to 25%; extended delivery time is calculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days, subject to contract terms.
On-site comprehensive UPS warranty is required; battery replacement warranty specified; 24x7 PAN India service; AMC available after 3 years with quarterly preventive maintenance; installation, commissioning, and spares support across India.
Within 5 days of award, submit 5 advance samples for buyer approval; buyer may approve or list modifications within 5 days; delays shift the delivery period without LD; bulk supply must adhere to approved samples and modifications.
GST is payable by the bidder; the buyer reimburses GST at actuals or the lower quoted rate, whichever is applicable; bidder must confirm GST registration and applicable rates in their bid submission.
Bid includes supply, installation, testing, and commissioning of UPS units; manufacturer must provide support for installation, commissioning, spares, and technical assistance nationwide; spares should be near the site for quick replacement.
Hindustan Aeronautics Limited (hal)
📍 LUCKNOW, UTTAR PRADESH
Sanjay Gandhi Post Graduate Institute Of Medical Sciences Lucknow
📍 LUCKNOW, UTTAR PRADESH
Border Security Force (bsf)
📍 DHUBRI, ASSAM
Karnataka Neeravari Nigam Limited (knnl)
📍 GADAG, KARNATAKA
Directorate of Technical Education
📍 TIRUCHIRAPPALLI, TAMIL NADU
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS