TenderDekho Logo
GEM

Government Tender Published for 1 TIP,2 BRACKET,3 FITTING OF FRAME 9K,4 FITTING OF FRAME 9K,5 FITTING OF FRAME 10K,6 FITTING,7 FITT in NASHIK, MAHARASHTRA

Bid Publish Date

23-Jun-2026, 3:48 pm

Bid End Date

14-Jul-2026, 5:00 pm

Progress

Issue23-Jun-2026, 3:48 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

4515

Category

1 TIP

Bid Type

Two Packet Bid

Categories 9

Hindustan Aeronautics Limited (hal) has released a public tender for 1 TIP, 2 BRACKET, 3 FITTING OF FRAME 9K, 4 FITTING OF FRAME 9K, 5 FITTING OF FRAME 10K, 6 FITTING, 7 FITTING, 8 FITTING OF FRAME26K, 9 FITTING OF FRAME26K, 10 DOUBLER, 11 UPPER PANEL BETWEEN FRAME 35-38, 12 FORK, 13 ROD, 14 TERMINAL, 15 TERMINAL, 16 TERMINAL, 17 BUSH, 18 JAW, 19 ROD, 20 SPERICAL BEARING, 21 TERMINAL, 22 HATCH COVER, 23 HATCH COVER, 24 BRACKET, 25 BRACKET, 26 SKIN, 27 SKIN, 28 ECCENTRIC BUSH, 29 TOP BUSH, 30 LEADING EDGE N15A, 31 LEADING EDGE N15A, 32 LONGERON N2 UPPER UNIT, 33 BOLT, 34 WASHER, 35 BELL CRANK, 36 BELL CRANK, 37 PLUG, 38 BOLT, 39 WASHER, 40 WASHER, 41 WASHER, 42 WASHER, 43 BUSH, 44 BUSH, 45 SHAFT, 46 BUSH, 47 ADAPTOR, 48 FLANGE, 49 NUT, 50 NUT, 51 NUT, 52 ADAPTOR, 53 PIPE CONNECTION, 54 PIPE CONNECTION, 55 CONTACT BOLT, 56 FLANGE, 57 COUPLING, 58 BRACKET, 59 JET, 60 PIPE CONNECTION, 61 PLATE, 62 LEVER, 63 FITTING, 64 ADAPTOR, 65 PIPE CONNECTION, 66 FLANGE, 67 SLIDE BLOCK, 68 FLANGE, 69 FLANGE, 70 BRACKET, 71 STRUT, 72 PROFILE, 73 END PIECE, 74 COUPLING, 75 COUPLING, 76 COUPLING, 77 NUT, 78 NUT, 79 END PIECE, 80 COUPLING, 81 PIN, 82 HANDLE, 83 END PIECE, 84 END PIECE, 85 END PIECE, 86 LOCATOR, 87 ROD, 88 HANDLE, 89 NUT, 90 BRACKET, 91 PIN, 92 FITTING OF FRAME 10K, 93 FITTING OF FRAME 10K, 94 FITTING, 95 FITTING, 96 FITTING OF FRAME26K, 97 FITTING OF FRAME26K, 98 WALL OF FRAME 38 MIDDLE COMPARTMENT, 99 ADAPTER, 100 ROLLER THROTTLE ASSLY, 101 BELL CRANK, 102 BELL CRANK in NASHIK, MAHARASHTRA. Quantity: 4515. Submission Deadline: 14-07-2026 17: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

1 TIP , 2 BRACKET , 3 FITTING OF FRAME 9K , 4 FITTING OF FRAME 9K , 5 FITTING OF FRAME 10K , 6 FITTING , 7 FITTING , 8 FITTING OF FRAME26K , 9 FITTING OF FRAME26K , 10 DOUBLER , 11 UPPER PANEL BETWEEN FRAME 35-38 , 12 FORK , 13 ROD , 14 TERMINAL , 15 TERMINAL , 16 TERMINAL , 17 BUSH , 18 JAW , 19 ROD , 20 SPERICAL BEARING , 21 TERMINAL , 22 HATCH COVER , 23 HATCH COVER , 24 BRACKET , 25 BRACKET , 26 SKIN , 27 SKIN , 28 ECCENTRIC BUSH , 29 TOP BUSH , 30 LEADING EDGE N15A , 31 LEADING EDGE N15A , 32 LONGERON N2 UPPER UNIT , 33 BOLT , 34 WASHER , 35 BELL CRANK , 36 BELL CRANK , 37 PLUG , 38 BOLT , 39 WASHER , 40 WASHER , 41 WASHER , 42 WASHER , 43 BUSH , 44 BUSH , 45 SHAFT , 46 BUSH , 47 ADAPTOR , 48 FLANGE , 49 NUT , 50 NUT , 51 NUT , 52 ADAPTOR , 53 PIPE CONNECTION , 54 PIPE CONNECTION , 55 CONTACT BOLT , 56 FLANGE , 57 COUPLING , 58 BRACKET , 59 JET , 60 PIPE CONNECTION , 61 PLATE , 62 LEVER , 63 FITTING , 64 ADAPTOR , 65 PIPE CONNECTION , 66 FLANGE , 67 SLIDE BLOCK , 68 FLANGE , 69 FLANGE , 70 BRACKET , 71 STRUT , 72 PROFILE , 73 END PIECE , 74 COUPLING , 75 COUPLING , 76 COUPLING , 77 NUT , 78 NUT , 79 END PIECE , 80 COUPLING , 81 PIN , 82 HANDLE , 83 END PIECE , 84 END PIECE , 85 END PIECE , 86 LOCATOR , 87 ROD , 88 HANDLE , 89 NUT , 90 BRACKET , 91 PIN , 92 FITTING OF FRAME 10K , 93 FITTING OF FRAME 10K , 94 FITTING , 95 FITTING , 96 FITTING OF FRAME26K , 97 FITTING OF FRAME26K , 98 WALL OF FRAME 38 MIDDLE COMPARTMENT , 99 ADAPTER , 100 ROLLER THROTTLE ASSLY , 101 BELL CRANK , 102 BELL CRANK

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9509198.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Reel Spring,Air Filter,Feeder Slats,C 130,Flat,UC 205 patti,UC 206 patti,Third Arm Bolt,Prong Nut B

Agriculture Department

Posted: 26 May 2025
Closed: 10 June 2025
GEM

CRANK FOR STRAW WAKER,SHAFT,PRONG SHAFT HOLDER,RAIL,COUNTER SPROCKET 15 TEETH 19 point 5 CHAIN,COUN

National Seeds Corporation Limited (nsc)

Posted: 29 January 2025
Closed: 11 February 2025
GEM

61 1 61 JCB 333 Y 9762 Bracket Lock assembly,61 1 61 JCB 333 Y 9356 Hinge assembly Left side,61 1 6

Indian Army

NORTH 24 PARGANAS, WEST BENGAL

Posted: 1 October 2025
Closed: 11 October 2025
GEM

3048027 Cap Main Brg,3048028 Cap Main Brg,3048029 Cap Main Brg,67211 Dowel main brg,100670 Bushing

Indian Army

KOTA, RAJASTHAN

Posted: 1 July 2025
Closed: 22 July 2025
GEM

91702700 Bearing,90750000 Bearing,90709600 Bearing,83100098 Bearing,40 302818 Bty Lead,64604548 Bul

Indian Army

HARIDWAR, UTTARAKHAND

Posted: 18 August 2025
Closed: 28 August 2025
GEM

Bill of Quantities (BOQ) 102 Items Sign in for GEM prices

#1

1 TIP

11.6201.I.171.900

135 nos Delivery: 300 days
#2

2 BRACKET

11.0212.I.002.900

15 nos Delivery: 300 days
#3

3 FITTING OF FRAME 9K

11.0409.3.001.001

30 nos Delivery: 300 days
#4

4 FITTING OF FRAME 9K

11.0409.3.001.002

30 nos Delivery: 300 days
#5

5 FITTING OF FRAME 10K

11.0410.3.001.001

15 nos Delivery: 300 days
#6

6 FITTING

11.0414.3.003.003

15 nos Delivery: 300 days
#7

7 FITTING

11.0414.3.003.004

15 nos Delivery: 300 days
#8

8 FITTING OF FRAME26K

11.0426.3.002.001

15 nos Delivery: 300 days
#9

9 FITTING OF FRAME26K

11.0426.3.002.002

15 nos Delivery: 300 days
#10

10 DOUBLER

11.0610.3.874.900

15 nos Delivery: 300 days
#11

11 UPPER PANEL BETWEEN FRAME 35-38

11.0670.3.814.900

15 nos Delivery: 300 days
#12

12 FORK

11.0730.4.017.900

15 nos Delivery: 300 days
#13

13 ROD

11.0730.4.287.900

15 nos Delivery: 300 days
#14

14 TERMINAL

11.0730.4.303.003

15 nos Delivery: 300 days
#15

15 TERMINAL

11.0730.4.315.001

15 nos Delivery: 300 days
#16

16 TERMINAL

11.0730.4.315.003

15 nos Delivery: 300 days
#17

17 BUSH

11.0740.0.229.900

30 nos Delivery: 300 days
#18

18 JAW

11.0770.0.021.900

30 nos Delivery: 300 days
#19

19 ROD

11.0770.4.072.900

15 nos Delivery: 300 days
#20

20 SPERICAL BEARING

11.0795.I.026.900

30 nos Delivery: 300 days
#21

21 TERMINAL

11.0795.I.104.900

15 nos Delivery: 300 days
#22

22 HATCH COVER

11.1000.4.116.001

15 nos Delivery: 300 days
#23

23 HATCH COVER

11.1000.4.116.002

15 nos Delivery: 300 days
#24

24 BRACKET

11.1005.7.053.001

15 nos Delivery: 300 days
#25

25 BRACKET

11.1005.7.053.002

15 nos Delivery: 300 days
#26

26 SKIN

11.1022.I.801.900

15 nos Delivery: 300 days
#27

27 SKIN

11.1022.I.803.900

15 nos Delivery: 300 days
#28

28 ECCENTRIC BUSH

11.1025.3.902.900

30 nos Delivery: 300 days
#29

29 TOP BUSH

11.2000.2.072.900

120 nos Delivery: 300 days
#30

30 LEADING EDGE N15A

11.2010.2.043.001

15 nos Delivery: 300 days
#31

31 LEADING EDGE N15A

11.2010.2.043.002

15 nos Delivery: 300 days
#32

32 LONGERON N2 UPPER UNIT

11.3422.I.503.900

30 nos Delivery: 300 days
#33

33 BOLT

11.4804.3.607.900

30 nos Delivery: 300 days
#34

34 WASHER

11.4960.3.013.900

15 nos Delivery: 300 days
#35

35 BELL CRANK

11.5002.3.162.001

30 nos Delivery: 300 days
#36

36 BELL CRANK

11.5002.3.162.002

30 nos Delivery: 300 days
#37

37 PLUG

11.5090.I.256.900

30 nos Delivery: 300 days
#38

38 BOLT

11.5101.I.501.900

30 nos Delivery: 300 days
#39

39 WASHER

11.5101.I.503.001

60 nos Delivery: 300 days
#40

40 WASHER

11.5101.I.503.003

60 nos Delivery: 300 days
#41

41 WASHER

11.5101.I.503.005

60 nos Delivery: 300 days
#42

42 WASHER

11.5101.I.503.007

60 nos Delivery: 300 days
#43

43 BUSH

11.5105.0.012.900

15 nos Delivery: 300 days
#44

44 BUSH

11.5105.I.171.900

15 nos Delivery: 300 days
#45

45 SHAFT

11.5200.I.176.900

60 nos Delivery: 300 days
#46

46 BUSH

11.5301.I.069.900

15 nos Delivery: 300 days
#47

47 ADAPTOR

11.5303.I.014.900

15 nos Delivery: 300 days
#48

48 FLANGE

11.6100.3.888.900

30 nos Delivery: 300 days
#49

49 NUT

11.6103.3.804.900

30 nos Delivery: 300 days
#50

50 NUT

11.6103.3.901.900

60 nos Delivery: 300 days
#51

51 NUT

11.6103.I.008.900

60 nos Delivery: 300 days
#52

52 ADAPTOR

11.6110.3.014.001

90 nos Delivery: 300 days
#53

53 PIPE CONNECTION

11.6120.3.071.900

15 nos Delivery: 300 days
#54

54 PIPE CONNECTION

11.6120.3.978.900

15 nos Delivery: 300 days
#55

55 CONTACT BOLT

11.6120.I.071.900

45 nos Delivery: 300 days
#56

56 FLANGE

11.6121.3.086.900

15 nos Delivery: 300 days
#57

57 COUPLING

11.6121.I.186.900

15 nos Delivery: 300 days
#58

58 BRACKET

11.6123.3.736.900

30 nos Delivery: 300 days
#59

59 JET

11.6126.1.318.900

15 nos Delivery: 300 days
#60

60 PIPE CONNECTION

11.6126.3.626.900

15 nos Delivery: 300 days
#61

61 PLATE

11.7404.I.214.900

15 nos Delivery: 300 days
#62

62 LEVER

11.7420.I.279.900

15 nos Delivery: 300 days
#63

63 FITTING

11.7420.I.282.900

15 nos Delivery: 300 days
#64

64 ADAPTOR

11.7420.I.804.900

15 nos Delivery: 300 days
#65

65 PIPE CONNECTION

11.7510.1.078.900

30 nos Delivery: 300 days
#66

66 FLANGE

11.7601.1.521.900

15 nos Delivery: 300 days
#67

67 SLIDE BLOCK

11.7601.I.028.900

30 nos Delivery: 300 days
#68

68 FLANGE

11.7603.3.807.900

15 nos Delivery: 300 days
#69

69 FLANGE

11.7604.3.007.900

15 nos Delivery: 300 days
#70

70 BRACKET

11.7724.I.516.900

30 nos Delivery: 300 days
#71

71 STRUT

11.8601.I.831.900

60 nos Delivery: 300 days
#72

72 PROFILE

11.9265.I.007.900

30 nos Delivery: 300 days
#73

73 END PIECE

30.6100.0044.019

105 nos Delivery: 300 days
#74

74 COUPLING

30.6100.0176.011

15 nos Delivery: 300 days
#75

75 COUPLING

30.6100.0177.023

15 nos Delivery: 300 days
#76

76 COUPLING

30.6100.0177.031

60 nos Delivery: 300 days
#77

77 NUT

30.6100.0178.031

75 nos Delivery: 300 days
#78

78 NUT

30.6100.0178.033

75 nos Delivery: 300 days
#79

79 END PIECE

30.6100.0211.021

345 nos Delivery: 300 days
#80

80 COUPLING

30.6100.0214.015

60 nos Delivery: 300 days
#81

81 PIN

30.6100.8022.900

75 nos Delivery: 300 days
#82

82 HANDLE

30.6100.8023.001

45 nos Delivery: 300 days
#83

83 END PIECE

30.6100.8033.017

30 nos Delivery: 300 days
#84

84 END PIECE

30.6100.8034.005

30 nos Delivery: 300 days
#85

85 END PIECE

30.6100.8034.009

120 nos Delivery: 300 days
#86

86 LOCATOR

30.6100.8069.001

60 nos Delivery: 300 days
#87

87 ROD

30.7100.1041.900

180 nos Delivery: 300 days
#88

88 HANDLE

30.7200.1122.005

15 nos Delivery: 300 days
#89

89 NUT

30.7200.1859.900

15 nos Delivery: 300 days
#90

90 BRACKET

30.7200.8151.007

30 nos Delivery: 300 days
#91

91 PIN

30.8720.8023.001

900 nos Delivery: 300 days
#92

92 FITTING OF FRAME 10K

E10.0410.0001.001

15 nos Delivery: 300 days
#93

93 FITTING OF FRAME 10K

E10.0410.0001.002

15 nos Delivery: 300 days
#94

94 FITTING

E10.0414.0003.003

15 nos Delivery: 300 days
#95

95 FITTING

E10.0414.0003.004

15 nos Delivery: 300 days
#96

96 FITTING OF FRAME26K

E10.0426.0002.001

15 nos Delivery: 300 days
#97

97 FITTING OF FRAME26K

E10.0426.0002.002

15 nos Delivery: 300 days
#98

98 WALL OF FRAME 38 MIDDLE COMPARTMENT

E10.0620.I923.900

15 nos Delivery: 300 days
#99

99 ADAPTER

E10.5303.I002.900

15 nos Delivery: 300 days
#100

100 ROLLER THROTTLE ASSLY

E10.6501.0090.001

30 nos Delivery: 300 days
#101

101 BELL CRANK

11.5002.3.163.001

30 nos Delivery: 300 days
#102

102 BELL CRANK

11.5002.3.163.002

30 nos Delivery: 300 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

2

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found

1 STRINGER 20,2 STRINGER 20,3 PACKING,4 PACKING,5 COVER PLATE,6 COVER PLATE,7 FLANGE OF TOP ROD,8 I

Hindustan Aeronautics Limited (hal)

📍 NASHIK, MAHARASHTRA

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Urgent

1 ANGLE PLATE,2 ANGLE PLATE,3 CLAMP,4 GASKET,5 FLANGE,6 BRACKET,7 BRACKET,8 BRACKET,9 PANEL,10 SPAC

Hindustan Aeronautics Limited (hal)

📍 NASHIK, MAHARASHTRA

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

1 ANGLE WITH FLANGE,2 BLOCK,3 BODY,4 BODY,5 BODY,6 BODY,7 BODY,8 BODY,9 BODY,10 BODY,11 BODY,12 BOD

Hindustan Aeronautics Limited (hal)

📍 NASHIK, MAHARASHTRA

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM

1 BRACKET,2 BRACKET -RH,3 BRACKET -LH,4 BRACKET -RH,5 BRACKET -LH,6 PIPE,7 SLEEVE,8 BODY,9 ROD,10 B

Hindustan Aeronautics Limited (hal)

📍 NASHIK, MAHARASHTRA

⏰ Deadline: 4 weeks left
🛒 Type: Goods
View GEM
Urgent

1 INSERT,2 UPPER STOPPER,3 NUT,4 NUT,5 FORKED ADOPTER,6 WASHER,7 TUBE,8 LEVER,9 FORK,10 FORK,11 COV

Hindustan Aeronautics Limited (hal)

📍 NASHIK, MAHARASHTRA

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM