Custom Bid for Services - Internal inspection or Overhauling or Replacement of HV bushing or Rewi
Nuclear Power Corporation Of India Limited
Progress
Quantity
824
Category
Rewinding of copper wound HT coils
Bid Type
Two Packet Bid
A tender has been published for Bharat Sanchar Nigam Limited Portal(bsnl) Thorough inspection, Transportation charge, Lifting of transformer, Draining out the existing, Rewinding of copper wound LT coils, Rewinding of copper wound HT coils, Replacement of worn out, Replacement of LV bushing, Replacement of HV bushing, Reassembling and fitting, Replacement of existing faulty changeover switch, Heating of core and winding, Supplying and pouring, Painting of complete outer surface, Transportation charges for repaired, Re-installation of the above repaired in PATNA, BIHAR. Quantity: 824 by. Submission Deadline: 05-09-2025 13: 00: 00. Check eligibility and apply.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Nuclear Power Corporation Of India Limited
Indian Army
JODHPUR, RAJASTHAN
Indian Army
Indian Army
JODHPUR, RAJASTHAN
Indian Army
POONCH, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Thorough inspection | Testing and checking of the above 400 KVA copper wound transformer | 1 | job | mukul_anthony22 | 15 |
| 2 | Transportation charge | For transformer from BSNL Sanchar Sadan Budh Marg Patna to workshop at Patna | 1 | job | mukul_anthony22 | 15 |
| 3 | Lifting of transformer | Core and coil asssembly including removal of all the burnt HV and LV coils | 1 | job | mukul_anthony22 | 15 |
| 4 | Draining out the existing | Unserviceable transformer oil including cleaning the tank core assembly | 1 | job | mukul_anthony22 | 15 |
| 5 | Rewinding of copper wound LT coils | 50 Kg per coil for 3 coils with the matching of existing gauge with electrolytic high conductivity paper insulated | 150 | kg | mukul_anthony22 | 15 |
| 6 | Rewinding of copper wound HT coils | 13 Kg per coil for 12 coils with the matching of existing gauge with electrolytic high conductivity paper insulated | 156 | kg | mukul_anthony22 | 15 |
| 7 | Replacement of worn out | Gaskits crape tape cotton tape press board with new one | 1 | job | mukul_anthony22 | 15 |
| 8 | Replacement of LV bushing | 1point1 KV with studs Copper complete with nut washers oil seal and cap fitting | 4 | job | mukul_anthony22 | 15 |
| 9 | Replacement of HV bushing | 12 KV with studs Copper complete with nut washers oil seal and cap fitting | 3 | job | mukul_anthony22 | 15 |
| 10 | Reassembling and fitting | Rewinded transformer core with accessories bushing stud including paper and press boards | 1 | job | mukul_anthony22 | 15 |
| 11 | Replacement of existing faulty changeover switch | New 630 A On load 4 Pole changeover switch open execution type | 1 | nos | mukul_anthony22 | 15 |
| 12 | Heating of core and winding | Assembly in heat chamber in order to remove all traces of moisture from the insulations | 1 | job | mukul_anthony22 | 15 |
| 13 | Supplying and pouring | Transformer oil as per IS 335 duly filtered thoroughly before topping up oil | 500 | ltrs | mukul_anthony22 | 15 |
| 14 | Painting of complete outer surface | With epoxy primary coat & finish coat with enamel paint matching with existing colour | 1 | job | mukul_anthony22 | 15 |
| 15 | Transportation charges for repaired | Repaired 400 KVA transformer from workshop to Sanchar Sadan Budh Marg Patna | 1 | job | mukul_anthony22 | 15 |
| 16 | Re-installation of the above repaired | 400 KVA copper wound transformer on the existing plinth of the substation including shifting from campus to the plinth with the help of suitable man power chain pulley tools MS channel | 1 | job | mukul_anthony22 | 15 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | COOL CONTROL Under PMA | - | 29-08-2025 14:28:38 | Qualified |
| 2 | pankaj electrical works Under PMA | - | 01-09-2025 13:03:32 | Disqualified |
| 3 | SINGH IMPRESSION Under PMA | - | 27-08-2025 16:49:14 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | SINGH IMPRESSION(MSE,MII)( MSE Social Category:General ) Under PMA | ₹5,08,399 | Item Categories : Thorough inspection,Transportation charge,Lifting of transformer,Draining out the existing,Rewindin |
| L2 | COOL CONTROL (MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹5,08,473 | Item Categories : Thorough inspection,Transportation charge,Lifting of transformer,Draining out the existing,Rewindin |
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS