TenderDekho Logo
GEM

Patan District Panchayat Agricultural Trailer AIS 112 Compliant Tender Gujarat 2026

Bid Publish Date

21-Feb-2026, 11:06 am

Bid End Date

04-Mar-2026, 8:00 pm

Progress

Issue21-Feb-2026, 11:06 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2

Bid Type

Two Packet Bid

Tender Overview

Patan District Panchayat in Gujarat invites bids for an Agricultural Trailer compliant with AIS 112 (Q2). The procurement scope is supply of Goods for a trailer with configurable type of trailer, platform, sideboards, capacity (tonnes) with ±5% tolerance, number of wheels, overall width and length, and warranty period. The exact estimated value and EMD are not disclosed. The tender emphasizes AIS 112 compliance, warranty duration, and OEM/Importer obligations. Unique terms include a flexible quantity option clause allowing up to 25% variation during contract execution, with extension rules tied to the original delivery period and additional time calculation. This procurement targets Government agricultural logistics needs in PATAN, GUJARAT, focusing on durable, standards-compliant farm transport equipment.

Technical Specifications & Requirements

  • Standards/Compliance: AIS 112 compliance required; warranty to be specified in months by bidder.
  • Product Characteristics:
    • Type of Trailer and Type of Platform as per BOQ description
    • Sideboards configuration to meet load stability
    • Capacity: stated in tonnes with ±5% tolerance
    • Wheel count and overall chassis geometry (width in meters, length of platform in meters)
  • Delivery & Scope: Supply-only; installation not mentioned. Delivery terms align with option clause and currency of contract, subject to quantity variation.
  • OEM/Import Rules: For imported items, OEM with registered Indian office for after-sales service; submit accompanying certificate.
  • Warranty & Support: Minimum warranty period to be defined; ensure post-purchase support terms.

Terms, Conditions & Eligibility

  • Quantity Flexibility: Purchaser may increase/decrease up to 25% of bid quantity; extended delivery period calculations apply with minimum 30 days.
  • Scope: Bid price to include all cost components; scope limited to supply of goods.
  • Turnover Criteria: bidder and OEM must meet minimum average annual turnover over the last 3 years; provide audited balance sheets or CA certificate.
  • OEM Condition: If bunch bids, OEM of the primary product category with the highest bid value must meet turnover criteria.
  • Documentation/Compliance: Government procurement terms require certification/registration details; Indian after-sales support for imported items.

Key Specifications

  • AIS 112 compliant agricultural trailer

  • Capacity specification in tonnes with ±5% tolerance

  • Overall width and overall length dimensions (in meters)

  • Number of wheels

  • Type of trailer and type of platform

  • Warranty period (in months)

Terms & Conditions

  • 25% quantity variation permitted by purchaser during contract

  • Supply-only scope; no installation service included

  • Turnover criteria for bidder and OEM with required documentary evidence

  • Imported products require Indian OEM/Authorized Seller with registered office

  • Delivery terms tied to original and extended delivery periods per option clause

Important Clauses

Payment Terms

Not explicitly stated in tender data; bidder must align with government procurement norms and terms.

Delivery Schedule

Delivery period linked to original order date; extended time calculated as (increased quantity / original quantity) × original period, minimum 30 days.

Penalties/Liquidated Damages

Not detailed in tender data; standard L&D provisions may apply as per purchaser terms.

Bidder Eligibility

  • Audited turnover evidence for bidder and OEM (last 3 financial years)

  • AIS 112 compliance capability for agricultural trailers

  • Registered Indian office required for OEM/after-sales support for imported items

Documents 4

GeM-Bidding-9007254.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Agricultural Trailer Complying to AIS 112

Nagarpalika

VADODARA, GUJARAT

Posted: 12 December 2025
Closed: 24 December 2025
GEM

Agricultural Trailer Complying to AIS 112

Nagarpalika

JUNAGADH, GUJARAT

Posted: 27 March 2025
Closed: 7 April 2025
GEM

Agricultural Trailer Complying to AIS 112

Nagarpalika

VADODARA, GUJARAT

Posted: 12 December 2025
Closed: 23 December 2025
GEM

Agricultural Trailer Complying to AIS 112

Nagarpalika

VADODARA, GUJARAT

Posted: 12 December 2025
Closed: 23 December 2025
GEM

Agricultural Trailer Complying to AIS 112

N/a

MAHESANA, GUJARAT

Posted: 28 July 2025
Closed: 19 August 2025
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Generic Type of Trailer Semi Trailer (Single Axle)
Generic Type of Platform Tipping Platform
Generic Sideboards Fixed sideboards
Generic Capacity of Trailer (tonnes) (Tolerance ± 5%) 3.0
Generic Number of Wheels 2.0
Dimensions Overall width of trailer measured between extreme points (meter) <=1.25
Dimensions Overall length of platform (meter) <=2.5
Certification & Warranty Warranty (in months) 12, 24, 36, 48 Or higher

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited financial statements or CA certificate showing average turnover (last 3 years) for bidder

4

Audited financial statements or CA certificate showing average turnover (last 3 years) for OEM

5

OEM authorization or authentication for provided trailer (if applicable)

6

Evidence of registered Indian office for OEM/imported products

7

Technical compliance certificates demonstrating AIS 112 compatibility

8

EMD submission proof (amount not disclosed in tender data)

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid on the Patan Gujarat AIS 112 trailer tender in 2026

Bidders must submit GST, PAN, and turnover evidence for bidder and OEM, plus AIS 112 compliance certificates. Include OEM authorization if imported, and proof of Indian after-sales support. Ensure supply-only scope and adhere to the 25% quantity variation clause with delivery timelines.

What documents are required for the Patan trailer procurement

Required documents include GST certificate, PAN card, three-year turnover evidence (audited or CA-certified), OEM authorization, proof of Indian registered office for imported items, AIS 112 compliance certificates, and EMD submission proof. Ensure all documents reflect the latest financial year and procurement terms.

What are the technical specifications for AIS 112 trailer in Patan

Specifications cover trailer type, platform type, sideboards, wheel count, and overall width/length in meters, plus capacity in tonnes with ±5% tolerance. Ensure AIS 112 compliance, include warranty period in months, and confirm OEM/after-sales support in India.

What is the delivery period and extension rule for the Gujarat tender

Delivery begins from the original order date; quantity variances up to 25% may extend the period. Extra time = (increased quantity / original quantity) × original delivery period, with a minimum of 30 days for any extension.

What are the OEM turnover requirements for the Patan trailer tender

Both bidder and OEM must meet minimum average annual turnover over the last three years. Provide audited balance sheets or CA certificates; for new entities, turnover is calculated from completed years post-constitution with relevant criteria.

Is there a requirement for Indian after-sales support for imported trailers

Yes. Imported products must have an OEM or Authorized Seller with a registered Indian office to provide after-sales service; submit the supporting certificate with bid submission.

What does ‘supply of Goods’ scope imply for this Patan tender

Scope includes only the supply of the trailer and related components. Installation or commissioning is not explicitly mentioned; bidders should confirm installation terms during bid finalization and ensure all cost components are included in the quoted price.

How to ensure AIS 112 compliance in the bid submission

Attach AIS 112 compliance certificates or test reports confirming conformity to the standard. Include manufacturer datasheets, warranty terms, and any third-party conformity statements. Ensure alignment with Patan district requirements and submittal formats.

Similar Tenders

5 found
Urgent

Agricultural Trailer Complying to AIS 112

Surat District Panchayat

📍 SURAT, GUJARAT

EMD: ₹19,500
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

Agricultural Trailer Complying to AIS 112

Surat District Panchayat

📍 SURAT, GUJARAT

EMD: ₹19,500
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM

Agricultural Trailer Complying to AIS 112

N/a

📍 DANTEWADA, CHHATTISGARH

EMD: ₹8,000
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

Agricultural Trailer Complying to AIS 112

N/a

📍 DANTEWADA, CHHATTISGARH

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Urgent

E-municipalities UP Agricultural Trailer AIS 112 Compliant Tender Ghaziabad 2026

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

📍 GHAZIABAD, UTTAR PRADESH

EMD: ₹47,000
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM