AC Fuse, 900 Amps, 700V, Make: Bussmann 170M6663,DC Fuse, 1000 Amps, 1250V, Make: Bussmann 170M6498
Hindustan Copper Limited
EAST SINGHBHUM, JHARKHAND
Bid Publish Date
04-Jul-2026, 11:43 am
Bid End Date
14-Jul-2026, 12:00 pm
Location
Progress
Quantity
104
Category
FUSE, 15A, 1000V DC, PV-15A10F- as per item# 1 of attached specification
Bid Type
Single Packet Bid
Organization: Bharat Heavy Electricals Limited (BHEL) – Jhansi unit. Procurement of fuse components described as 15A, 1000V DC (PV-15A10F) per item #1 and 350A, 1250/170M3397 per item #2, to be supplied as a single package from the same source. No BOQ items listed; supplier must align with PQR and ensure single-source package fulfillment. The agreement includes a flexible quantity clause up to ±25% at contract award and during execution. Key differentiator is the mandatory package sourcing and post-acceptance warranty.
Product names: fuse components as per item #1 (PV-15A10F, 15A, 1000V DC) and item #2 (350A, 1250/170M3397).
Delivery: to BHEL Jhansi; packaging and sourcing from a single supplier.
Warranty: 1 year from date of receipt at BHEL Jhansi.
Payment: 90 days for standard suppliers; 45 days for MSE; 60 days for Medium Enterprises.
Inspection: after receipt at BHEL store, Jhansi.
Option clause: quantity may be increased/decreased by up to 25% at contract/extended periods.
Option to adjust quantity up to 25% at the time of contract and during execution.
Warranty period fixed at 1 year from receipt at BHEL Jhansi.
Payment terms differentiated by bidder type (MSE vs non-MSE; 45–60 days).
100% payment within 90 days from receipt and acceptance; MSE terms: 45 days for MSME, 60 days for Medium Enterprises; UDYAM certificate validity required for MSME benefits.
Option clause allows ±25% quantity adjustment; delivery period measured from last date of original DO; minimum extra time 30 days.
Not explicitly stated; penalties to be governed by general purchase terms; inspection after receipt implies acceptance testing before final payment.
Must satisfy PQR criteria with signed copy.
Must qualify for MSME/NSIC payment benefits if claiming; ensure UDYAM certificate validity.
Must supply both fuse items from a single source as a package.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
FUSE, 15A, 1000V DC, PV-15A10F- as per item# 1 of attached specification , Fuse 350A, 1250/ 170M3397- as per item# 2 of attached specification
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Jhansi
Delivery Pincodes
284120
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sunay Shrivastava | 284120,BHEL Khailar | Jhansi | Uttar Pradesh | 284120 | 100 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Copper Limited
EAST SINGHBHUM, JHARKHAND
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
Directorate Of Purchase And Stores
KHAMMAM, TELANGANA
Directorate Of Purchase And Stores
CHITRADURGA, KARNATAKA
Advanced Weapons And Equipment India Limited
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Duly filled and signed PQR document (Qualifying Criteria) with seal.
GST registration certificate and PAN card.
Experience certificates showing relevant fuse procurement or similar assemblies.
Financial statements or turnover information as required by PQR.
Technical bid documents and any OEM authorizations (if applicable).
EMD/Security deposit documents (if applicable under terms).
Udyam/ MSME registration details for MSME payment benefits.
Key insights about UTTAR PRADESH tender market
Bidders must submit a signed PQR, GSTIN, PAN, experience certificates, and financials, along with OEM authorizations if applicable. Ensure bid includes package sourcing for both fuse items and complies with the 25% quantity option. Payment terms vary by bidder type and require acceptance testing at BHEL Jhansi.
Submit PQR, GST certificate, PAN card, experience certificates, financial statements, technical bid, OEM authorizations (if any), and EMD documentation if applicable. MSME benefit claims require valid UDYAM certificate; ensure status is current at PO time.
Delivery is to BHEL Jhansi store; quantity may be adjusted by ±25% under the option clause. Extended delivery time uses the formula (increased quantity/original quantity) × original period with a 30-day minimum; supplier must adhere to this during contract execution.
Warranty is fixed at 1 year from the date of receipt of material at BHEL Jhansi; supplier must ensure proper installation and acceptance testing prior to warranty activation.
MSME suppliers receive 45-day payment from receipt and acceptance of material, subject to documentation; non-MSME suppliers are paid in 90 days; ensure UDYAM certificate validity to receive MSME benefits.
Inspection occurs after material receipt at BHEL Jhansi store; acceptance testing precedes final payment; any non-conformance may affect payment timing and warranty activation.
Yes, the tender requires the two fuse items to be procured as a single package from the same source, ensuring synchronized delivery and warranty coverage under one contract.
Specify compliance with internal PQR standards; but current data does not list explicit IS/ISO codes. Ensure all documentation aligns with PQR and OEM approvals; confirm any item-specific certifications with BHEL during bid submission.
Indian Army
📍 BARMER, RAJASTHAN
Indian Army
📍 KAMRUP, ASSAM
Madhya Pradesh Paschim Kshetra Vidyut Vitran Company Ltd
📍 UJJAIN, MADHYA PRADESH
Indian Army
📍 Pathankot, PUNJAB
Yantra India Limited
📍 NAGPUR, MAHARASHTRA
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS