TenderDekho Logo
GEM

Bids are Invited For 47113040 PRIMARY ELEMENT,537 16200 W A TAPPERED DITCHING BUCKET,332 Y6440 550 42854 SEAL KIT FOR 33 in WEST DELHI, DELHI

Bid Publish Date

03-Mar-2025, 4:29 pm

Bid End Date

08-Apr-2025, 10:00 am

Generate Docs

Progress

Issue03-Mar-2025, 4:29 pm
Technical22-03-2025 14:32:48
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

1261

Bid Type

Two Packet Bid

Categories 91

Indian Army announces a tender for 47113040 PRIMARY ELEMENT, 537 16200 W A TAPPERED DITCHING BUCKET, 332 Y6440 550 42854 SEAL KIT FOR 33 in WEST DELHI, DELHI. Quantity: 1261. Submission Deadline: 08-04-2025 10: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7558809.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

4203077630 BUCKET RMHP

Durgapur Steel Plant

BARDHAMAN, WEST BENGAL

Posted: 11 January 2025
Closed: 22 January 2025
GEM

BEML 220G Bucket Cylinder Assy 155HC09054,BEML 220G Ring Wear CGR0300720,BEML 220G U Packing CH0114

Indian Army

JAMMU, JAMMU & KASHMIR

Posted: 21 January 2025
Closed: 20 February 2025
GEM

1700074435 - S W E for Shovel Bucket

Nmdc Limited

DANTEWADA, CHHATTISGARH

Posted: 14 September 2025
Closed: 26 September 2025
GEM

NMDC Limited Bucket Cylinder ASSY P/N 4483567 Tender Dantewada Chhattisgarh 2026

Nmdc Limited

DANTEWADA, CHHATTISGARH

Posted: 25 March 2026
Closed: 4 April 2026
GEM

JCB, 400 N7762, FILTER SDX 1000HRS,JCB, 335 Y1459A, TOOTH KIT COOLER BUCKET FORGED,JCB, 335 Y9824,

Indian Army

JAMMU, JAMMU & KASHMIR

Posted: 18 February 2026
Closed: 28 February 2026
GEM

Bill of Quantities (BOQ) 170 Items Sign in for GEM prices

#1

47113040 PRIMARY ELEMENT

47113040 PRIMARY ELEMENT

4 nos Delivery: 120 days
#2

537 16200 W A TAPPERED DITCHING BUCKET

537 16200 W A TAPPERED DITCHING BUCKET

4 nos Delivery: 120 days
#3

332 Y6440 550 42854 SEAL KIT FOR 332 Y7055P 92

332 Y6440 550 42854 SEAL KIT FOR 332 Y7055P 92

4 nos Delivery: 120 days
#4

550 42855 SEAL KIT BUCKET 40 303876

550 42855 SEAL KIT BUCKET 40 303876

4 nos Delivery: 120 days
#5

613 01200 HOSE

613 01200 HOSE

4 nos Delivery: 120 days
#6

613 22000613 02000 HOSE

613 22000613 02000 HOSE

4 nos Delivery: 120 days
#7

646 04389 BULB 12V 55 W

646 04389 BULB 12V 55 W

4 nos Delivery: 120 days
#8

730 90820 LIGHT COVER

730 90820 LIGHT COVER

4 nos Delivery: 120 days
#9

831 00096 OILITE BEARING

831 00096 OILITE BEARING

4 nos Delivery: 120 days
#10

921 02000 SHIM KIT

921 02000 SHIM KIT

4 nos Delivery: 120 days
#11

9030996 TERMINAL NEGATIVE

9030996 TERMINAL NEGATIVE

4 nos Delivery: 120 days
#12

535 00104 SIDE CUTTER

535 00104 SIDE CUTTER

4 nos Delivery: 120 days
#13

9400030356 FUEL PUMP ASSY

9400030356 FUEL PUMP ASSY

4 nos Delivery: 120 days
#14

40 302822 BATTERY COVER

40 302822 BATTERY COVER

4 nos Delivery: 120 days
#15

320 06279 GASKET TURBO OUTLET

320 06279 GASKET TURBO OUTLET

4 nos Delivery: 120 days
#16

320 A7161 PUMP LIFT 3DX SUPER ENG XXXVII B

320 A7161 PUMP LIFT 3DX SUPER ENG XXXVII B

4 nos Delivery: 120 days
#17

25 101100 SOLENOID VALVE

25 101100 SOLENOID VALVE

4 nos Delivery: 120 days
#18

03 305076 BANJO BOLT 3DX SUPER CH XXX A

03 305076 BANJO BOLT 3DX SUPER CH XXX A

3 nos Delivery: 120 days
#19

904 M9407 04 500219 SEAL RADIAL SHAFT

904 M9407 04 500219 SEAL RADIAL SHAFT

3 nos Delivery: 120 days
#20

120 93202 HANDLE L H 3DX SUPER CH IV Q

120 93202 HANDLE L H 3DX SUPER CH IV Q

3 nos Delivery: 120 days
#21

130 06908 L V RETURN ADAPTOR

130 06908 L V RETURN ADAPTOR

3 nos Delivery: 120 days
#22

130 99518 D E SPANNER 1 point 1 16X1 point 1

130 99518 D E SPANNER 1 point 1 16X1 point 1

3 nos Delivery: 120 days
#23

1370 0402 NUT NYLOCK M12 THIN

1370 0402 NUT NYLOCK M12 THIN

3 nos Delivery: 120 days
#24

2105 1505 DOWEL

2105 1505 DOWEL

3 nos Delivery: 120 days
#25

2401 0218 O RING

2401 0218 O RING

3 nos Delivery: 120 days
#26

25 606133 O RING

25 606133 O RING

3 nos Delivery: 120 days
#27

331 69234 REAR VIEW MIRROR

331 69234 REAR VIEW MIRROR

3 nos Delivery: 120 days
#28

531 03205 BUCKET TOOTH

531 03205 BUCKET TOOTH

3 nos Delivery: 120 days
#29

701 15400 MICRO SWITCH

701 15400 MICRO SWITCH

3 nos Delivery: 120 days
#30

714 17400 WIPER BLADE

714 17400 WIPER BLADE

3 nos Delivery: 120 days
#31

716 05706 FUSE 15 AMP 3DX SUPER CH IX E

716 05706 FUSE 15 AMP 3DX SUPER CH IX E

3 nos Delivery: 120 days
#32

730 01035 FUEL GAUGE

730 01035 FUEL GAUGE

3 nos Delivery: 120 days
#33

730 01039 WARNING LIGHT CLUSTER

730 01039 WARNING LIGHT CLUSTER

3 nos Delivery: 120 days
#34

335 Y0786 730 01041 REV MOTOR DUMP RELAY

335 Y0786 730 01041 REV MOTOR DUMP RELAY

3 nos Delivery: 120 days
#35

730 01058 F R DUMP RELAY HARNESS

730 01058 F R DUMP RELAY HARNESS

3 nos Delivery: 120 days
#36

332 Y6914 730 02070 COLUMN SWITCH MANUAL 3DX SUPER CH XII E

332 Y6914 730 02070 COLUMN SWITCH MANUAL 3DX SUPER CH XII E

3 nos Delivery: 120 days
#37

730 03503 TECHO CABLE

730 03503 TECHO CABLE

3 nos Delivery: 120 days
#38

826 00600 QR PIN

826 00600 QR PIN

3 nos Delivery: 120 days
#39

904 09400 PISTON SEAL

904 09400 PISTON SEAL

3 nos Delivery: 120 days
#40

911 00500 PIVOT PIN

911 00500 PIVOT PIN

3 nos Delivery: 120 days
#41

926 05007 R H REAR QUARTER PANE GLAZING

926 05007 R H REAR QUARTER PANE GLAZING

3 nos Delivery: 120 days
#42

926 09706 R H WINDOW GLAZING

926 09706 R H WINDOW GLAZING

3 nos Delivery: 120 days
#43

220998 VALVE SOLENOID ASSY

220998 VALVE SOLENOID ASSY

3 nos Delivery: 120 days
#44

001 00518 POSITIVE LEAD

001 00518 POSITIVE LEAD

3 nos Delivery: 120 days
#45

2201 0013 CLIP WORMDRIVE 59 by 83MM 3DX SUPER CH XIII G CH XXVI A

2201 0013 CLIP WORMDRIVE 59 by 83MM 3DX SUPER CH XIII G CH XXVI A

3 nos Delivery: 120 days
#46

0604001000 ELEMENT FILTER OIL

0604001000 ELEMENT FILTER OIL

3 nos Delivery: 120 days
#47

612 72012 629 80130 HOSE

612 72012 629 80130 HOSE

3 nos Delivery: 120 days
#48

333 Y1373 FUEL TANK CAP 3DX SUPER CH III C

333 Y1373 FUEL TANK CAP 3DX SUPER CH III C

3 nos Delivery: 120 days
#49

320 06047 TURBOCHARGER 68 and 74 KW

320 06047 TURBOCHARGER 68 and 74 KW

3 nos Delivery: 120 days
#50

128 C5857 C5857 WA WINDOW FRAME RH 3DX SUPER CH IV Q

128 C5857 C5857 WA WINDOW FRAME RH 3DX SUPER CH IV Q

3 nos Delivery: 120 days
#51

333 Y6534 SIDE WINDOW SEAL R H P391 3DX SUPER CH IV Q

333 Y6534 SIDE WINDOW SEAL R H P391 3DX SUPER CH IV Q

3 nos Delivery: 120 days
#52

120 99400 SEAL KIT

120 99400 SEAL KIT

2 nos Delivery: 120 days
#53

122 36702 BEARING

122 36702 BEARING

2 nos Delivery: 120 days
#54

130 15018 TUBE

130 15018 TUBE

2 nos Delivery: 120 days
#55

130 15063 O RING

130 15063 O RING

2 nos Delivery: 120 days
#56

130 99513 SPANNER DE

130 99513 SPANNER DE

2 nos Delivery: 120 days
#57

130 99515 SPANNER DE

130 99515 SPANNER DE

2 nos Delivery: 120 days
#58

2407 0227 O RING

2407 0227 O RING

2 nos Delivery: 120 days
#59

550 42483 30182010 THERMOSTAT ELEMENT

550 42483 30182010 THERMOSTAT ELEMENT

2 nos Delivery: 120 days
#60

334 Y1270 WA EXC BUCKET 0 point 24 0 point 26 CUM 3DX SUPER CH II

334 Y1270 WA EXC BUCKET 0 point 24 0 point 26 CUM 3DX SUPER CH II

2 nos Delivery: 120 days
#61

40 302324 HOSE

40 302324 HOSE

2 nos Delivery: 120 days
#62

40 303384 BUZZER 12V 3DX SUPER CH IX E

40 303384 BUZZER 12V 3DX SUPER CH IX E

2 nos Delivery: 120 days
#63

47113050 ELEMENT SECONDARY

47113050 ELEMENT SECONDARY

2 nos Delivery: 120 days
#64

4811704000 FUEL FILTER ELEMENT

4811704000 FUEL FILTER ELEMENT

2 nos Delivery: 120 days
#65

550 42607 48173300 WATER PUMP ASSY

550 42607 48173300 WATER PUMP ASSY

2 nos Delivery: 120 days
#66

611 42200 HOSE

611 42200 HOSE

2 nos Delivery: 120 days
#67

612 00100 HOSE

612 00100 HOSE

2 nos Delivery: 120 days
#68

656 00555 PIPE

656 00555 PIPE

2 nos Delivery: 120 days
#69

730 01056 DUMP RELAY

730 01056 DUMP RELAY

2 nos Delivery: 120 days
#70

730 02068 HARNESS SHUTTLE

730 02068 HARNESS SHUTTLE

2 nos Delivery: 120 days
#71

814 00168 SPRING

814 00168 SPRING

2 nos Delivery: 120 days
#72

816 00189 PIPE CAP G3 by 8 3DX SUPER CH VII D CH XXXI B

816 00189 PIPE CAP G3 by 8 3DX SUPER CH VII D CH XXXI B

2 nos Delivery: 120 days
#73

904 50024 SEAL RING 3DX SUPER CH XXI F

904 50024 SEAL RING 3DX SUPER CH XXI F

2 nos Delivery: 120 days
#74

926 09705 L H WINDOW GLAZING

926 09705 L H WINDOW GLAZING

2 nos Delivery: 120 days
#75

438 00013 CASING ASSY DIFF

438 00013 CASING ASSY DIFF

2 nos Delivery: 120 days
#76

320 07042 PIPE LIFT PUMP TO FILTER 3DX SUPER ENG XXXVII F

320 07042 PIPE LIFT PUMP TO FILTER 3DX SUPER ENG XXXVII F

2 nos Delivery: 120 days
#77

332 Y8134 BRAKE COUNTER PLATE 3DX SUPER CH XIX C

332 Y8134 BRAKE COUNTER PLATE 3DX SUPER CH XIX C

2 nos Delivery: 120 days
#78

509 00064 40 302905 BUCKET CAPACITY 0 point 09

509 00064 40 302905 BUCKET CAPACITY 0 point 09

2 nos Delivery: 120 days
#79

48173100 WATER PUMP ASSY WITH PIPES

48173100 WATER PUMP ASSY WITH PIPES

2 nos Delivery: 120 days
#80

716 30255 SOLENOID ESOS

716 30255 SOLENOID ESOS

2 nos Delivery: 120 days
#81

817 00380 FUEL FILTER 3DX SUPER CH VII A

817 00380 FUEL FILTER 3DX SUPER CH VII A

2 nos Delivery: 120 days
#82

334 Y3895 CARRIER PLANETARY HUB 3DX SUPER CH XVIII H I

334 Y3895 CARRIER PLANETARY HUB 3DX SUPER CH XVIII H I

2 nos Delivery: 120 days
#83

904 M6779 SEAL 3DX SUPER CH XIX C

904 M6779 SEAL 3DX SUPER CH XIX C

2 nos Delivery: 120 days
#84

333 Y2681 40 303832 EXTENSION EXHAUST 3DX SUPER CH XXV A

333 Y2681 40 303832 EXTENSION EXHAUST 3DX SUPER CH XXV A

2 nos Delivery: 120 days
#85

334 Y0829 1 by 6 TINTED GLASS LH 3DX SUPER CH IV R

334 Y0829 1 by 6 TINTED GLASS LH 3DX SUPER CH IV R

2 nos Delivery: 120 days
#86

128 17413 BUCKET 0 point 30 CUM

128 17413 BUCKET 0 point 30 CUM

1 nos Delivery: 120 days
#87

130 07240 FORKLIFT KIT

130 07240 FORKLIFT KIT

1 nos Delivery: 120 days
#88

130 07243 PIN LOCKING 3DX SUPER CH XXXI T

130 07243 PIN LOCKING 3DX SUPER CH XXXI T

1 nos Delivery: 120 days
#89

130 07244 FORKLIFT FRAME 3DX SUPER CH XXXI T

130 07244 FORKLIFT FRAME 3DX SUPER CH XXXI T

1 nos Delivery: 120 days
#90

130 15041 SPLIT FIN

130 15041 SPLIT FIN

1 nos Delivery: 120 days
#91

332 Y3028 25 615600 ECAVATOR VALVE BLOCK

332 Y3028 25 615600 ECAVATOR VALVE BLOCK

1 nos Delivery: 120 days
#92

30 600151 ENGINE RADIATOR TURBO

30 600151 ENGINE RADIATOR TURBO

1 nos Delivery: 120 days
#93

331 38532 HANDLE

331 38532 HANDLE

1 nos Delivery: 120 days
#94

332 Y110 RADIATOR TOP HOSE

332 Y110 RADIATOR TOP HOSE

1 nos Delivery: 120 days
#95

9451037430 3403260000 VALVE OVER FLOW

9451037430 3403260000 VALVE OVER FLOW

1 nos Delivery: 120 days
#96

35 10081 SEAL KIT

35 10081 SEAL KIT

1 nos Delivery: 120 days
#97

35 400508 BALL

35 400508 BALL

1 nos Delivery: 120 days
#98

40 303364 WEAR PAD YELLOW

40 303364 WEAR PAD YELLOW

1 nos Delivery: 120 days
#99

459 10097 CLUTCH ASSY INPUT REVERSE

459 10097 CLUTCH ASSY INPUT REVERSE

1 nos Delivery: 120 days
#100

48145100 AIR CLEANER ASSY

48145100 AIR CLEANER ASSY

1 nos Delivery: 120 days
#101

49182100 LUB OIL FILTTER ASSY

49182100 LUB OIL FILTTER ASSY

1 nos Delivery: 120 days
#102

49329010 V BELT B 57

49329010 V BELT B 57

1 nos Delivery: 120 days
#103

500 00654 V BELT

500 00654 V BELT

1 nos Delivery: 120 days
#104

531 19500 BUCKET 37 IN 950MM

531 19500 BUCKET 37 IN 950MM

1 nos Delivery: 120 days
#105

581 05604 SEAL

581 05604 SEAL

1 nos Delivery: 120 days
#106

648 01306 RUBBER HOSE

648 01306 RUBBER HOSE

1 nos Delivery: 120 days
#107

730 70200 TANK UNIT

730 70200 TANK UNIT

1 nos Delivery: 120 days
#108

730 90700 SIDE LIGHT

730 90700 SIDE LIGHT

1 nos Delivery: 120 days
#109

914 10803 SPIDER UNIVERSAL

914 10803 SPIDER UNIVERSAL

1 nos Delivery: 120 days
#110

914 10902 FLANGE YOKE

914 10902 FLANGE YOKE

1 nos Delivery: 120 days
#111

335 A8878 STEERING UNIT HYDROSTATIC 200CC 3DX SUPER CH XV F

335 A8878 STEERING UNIT HYDROSTATIC 200CC 3DX SUPER CH XV F

1 nos Delivery: 120 days
#112

914 88100 PROPALER SHAFT 3DX SUPER CH XVIII F H

914 88100 PROPALER SHAFT 3DX SUPER CH XVIII F H

1 nos Delivery: 120 days
#113

904 2020 SEAL FILTER CAP

904 2020 SEAL FILTER CAP

1 nos Delivery: 120 days
#114

334 Y1274 128 17412 WA EXC BUCKET 0 point 18 CU M 3DX SUPER CH XXXI C

334 Y1274 128 17412 WA EXC BUCKET 0 point 18 CU M 3DX SUPER CH XXXI C

1 nos Delivery: 120 days
#115

122 23511 SIDE WINDOW LOCKING HAND

122 23511 SIDE WINDOW LOCKING HAND

1 nos Delivery: 120 days
#116

332 Y1446 STONE GUARD L H 3DX SUPER CH III X

332 Y1446 STONE GUARD L H 3DX SUPER CH III X

1 nos Delivery: 120 days
#117

334 Y2352 REAR RIM 16 point 9 X 28

334 Y2352 REAR RIM 16 point 9 X 28

1 nos Delivery: 120 days
#118

904 20336 PISTON CARRIAGE CLAMP3DX SUPER CH VI FH

904 20336 PISTON CARRIAGE CLAMP3DX SUPER CH VI FH

1 nos Delivery: 120 days
#119

335 E5836 WA BUCKET 400 MM 0 point 09 3DX SUPER CH XXXI E

335 E5836 WA BUCKET 400 MM 0 point 09 3DX SUPER CH XXXI E

1 nos Delivery: 120 days
#120

128 H2997 ABI EXHAUST SILENCER TURBO T3 3DX SUPER CH XXV AB

128 H2997 ABI EXHAUST SILENCER TURBO T3 3DX SUPER CH XXV AB

1 nos Delivery: 120 days
#121

0450226028 FILTER FUEL 1 point 1 LTR

0450226028 FILTER FUEL 1 point 1 LTR

1 nos Delivery: 120 days
#122

730 90002 BULB

730 90002 BULB

41 nos Delivery: 120 days
#123

103 77101 GASKET FUEL LEVEL SENSOR 3DX SUPER CH III C

103 77101 GASKET FUEL LEVEL SENSOR 3DX SUPER CH III C

34 nos Delivery: 120 days
#124

40 302604 TAIL LAMP LH

40 302604 TAIL LAMP LH

34 nos Delivery: 120 days
#125

40 302828 GROMMET BUMPER

40 302828 GROMMET BUMPER

25 nos Delivery: 120 days
#126

613 02900 HOSE

613 02900 HOSE

21 nos Delivery: 120 days
#127

2410 0304 RUBBER GROMMET

2410 0304 RUBBER GROMMET

21 nos Delivery: 120 days
#128

828 00135 O RING 3DX SUPER CH XIII F

828 00135 O RING 3DX SUPER CH XIII F

17 nos Delivery: 120 days
#129

332 Y1145 128 12634 GA KNOB WITH SWITCH

332 Y1145 128 12634 GA KNOB WITH SWITCH

10 nos Delivery: 120 days
#130

130 99554 SOCKET 24 MM 3DX SUPER CH VII D

130 99554 SOCKET 24 MM 3DX SUPER CH VII D

10 nos Delivery: 120 days
#131

730 01010 PARKING BREAK SWITCH

730 01010 PARKING BREAK SWITCH

8 nos Delivery: 120 days
#132

130 99539 PLIER INSULATED 6 Inch LONG 3DX SUPER CH VII D

130 99539 PLIER INSULATED 6 Inch LONG 3DX SUPER CH VII D

6 nos Delivery: 120 days
#133

828 00096 828 00096 O RING

828 00096 828 00096 O RING

6 nos Delivery: 120 days
#134

335 Y0631 531 03208 SIDE CUTTER LH

335 Y0631 531 03208 SIDE CUTTER LH

5 nos Delivery: 120 days
#135

2401 0213 O RING 38 point 1X44 point 5 3DX SUPER CH XIII G

2401 0213 O RING 38 point 1X44 point 5 3DX SUPER CH XIII G

5 nos Delivery: 120 days
#136

2401 0506 O RING

2401 0506 O RING

5 nos Delivery: 120 days
#137

40 302662 42 600250 FRONT RIM 9 point 00X16

40 302662 42 600250 FRONT RIM 9 point 00X16

4 nos Delivery: 120 days
#138

40 303963 CABLE SHUT OFF

40 303963 CABLE SHUT OFF

1 nos Delivery: 120 days
#139

612 02100 HOSE

612 02100 HOSE

1 nos Delivery: 120 days
#140

40 30291 CABLE ASSSY TROTTLE

40 30291 CABLE ASSSY TROTTLE

1 nos Delivery: 120 days
#141

730 02087 BTY CABLE

730 02087 BTY CABLE

1 nos Delivery: 120 days
#142

02 100284 OIL FILTER

02 100284 OIL FILTER

5 nos Delivery: 120 days
#143

03 301303 FUEL PIPE

03 301303 FUEL PIPE

5 nos Delivery: 120 days
#144

03 301625 DRIVE SHAFT

03 301625 DRIVE SHAFT

1 nos Delivery: 120 days
#145

1019 2053 PIVOT PIN

1019 2053 PIVOT PIN

15 nos Delivery: 120 days
#146

1019 2062 BUCKET DIPPER PIVOT PIN 3DX SUPER CH VI S

1019 2062 BUCKET DIPPER PIVOT PIN 3DX SUPER CH VI S

9 nos Delivery: 120 days
#147

1021 2016 PIVOT PIN

1021 2016 PIVOT PIN

2 nos Delivery: 120 days
#148

120 93201 R H HANDLE M6 3DX SUPER CH IV P

120 93201 R H HANDLE M6 3DX SUPER CH IV P

12 nos Delivery: 120 days
#149

122 67484 GAS STRUT

122 67484 GAS STRUT

1 nos Delivery: 120 days
#150

123 01427 REAR FRAME HOSE RETAINER

123 01427 REAR FRAME HOSE RETAINER

10 nos Delivery: 120 days
#151

123 02451 LOCK DOOR RIGHT HAND

123 02451 LOCK DOOR RIGHT HAND

8 nos Delivery: 120 days
#152

123 04237 SEAL 3DX SUPER CH VI Y

123 04237 SEAL 3DX SUPER CH VI Y

10 nos Delivery: 120 days
#153

126 12800 32 700473 IND PRE CLE GA

126 12800 32 700473 IND PRE CLE GA

4 nos Delivery: 120 days
#154

128 C5856 WINDOW FRAME LEFT HAND SIDE 3DX SUPER CH IV P

128 C5856 WINDOW FRAME LEFT HAND SIDE 3DX SUPER CH IV P

5 nos Delivery: 120 days
#155

128 C5955 DOOR RIGHT SIDE 3DX SUPER CH IV O

128 C5955 DOOR RIGHT SIDE 3DX SUPER CH IV O

5 nos Delivery: 120 days
#156

130 14022 INNER CABLE

130 14022 INNER CABLE

17 nos Delivery: 120 days
#157

130 15049 GREASE NIPPLE

130 15049 GREASE NIPPLE

119 nos Delivery: 120 days
#158

130 50150 DOOR HANDLE

130 50150 DOOR HANDLE

7 nos Delivery: 120 days
#159

1305 0410Z SET PIN BOLT 3DX SUPER CH XX E

1305 0410Z SET PIN BOLT 3DX SUPER CH XX E

9 nos Delivery: 120 days
#160

1315 3412Z M10 X 1 point 50 X 50 DIN 931 HEX CAP 3DX SUPER CH XXXI P

1315 3412Z M10 X 1 point 50 X 50 DIN 931 HEX CAP 3DX SUPER CH XXXI P

21 nos Delivery: 120 days
#161

1315 3416Z BOLT M10X70 GR8 point 8 3DX SUPER CH XIII R S CH XXXI P AC

1315 3416Z BOLT M10X70 GR8 point 8 3DX SUPER CH XIII R S CH XXXI P AC

9 nos Delivery: 120 days
#162

1315 3419Z BOLT M10 X 90MM 3DX SUPER CH IV E CH VI S CH X S

1315 3419Z BOLT M10 X 90MM 3DX SUPER CH IV E CH VI S CH X S

30 nos Delivery: 120 days
#163

1316 3821Z BOLT HEX

1316 3821Z BOLT HEX

30 nos Delivery: 120 days
#164

1340 0701 NUT 3 by 4 Inch UNF GRADE I TO BS 1768

1340 0701 NUT 3 by 4 Inch UNF GRADE I TO BS 1768

18 nos Delivery: 120 days
#165

1370 0101Z STD PLAIN NUT M6 PLAIN GRADE 8 3DX SUPER CH III R CH XVII A CH XXXI X

1370 0101Z STD PLAIN NUT M6 PLAIN GRADE 8 3DX SUPER CH III R CH XVII A CH XXXI X

9 nos Delivery: 120 days
#166

1370 0303Z NUT LOCK M10 3DX SUPER CH III B G K L N X Y Z CH IV KAJ CH V J K L N O P CH VI NOP CH VI AA CH X V CH XV A CH XXIII D CH XXV B CH XXXI IPAC

1370 0303Z NUT LOCK M10 3DX SUPER CH III B G K L N X Y Z CH IV KAJ CH V J K L N O P CH VI NOP CH VI AA CH X V CH XV A CH XXIII D CH XXV B CH XXXI IPAC

69 nos Delivery: 120 days
#167

1370 0402Z THIN PLAIN NUT3DX SUPER CH VI DJK

1370 0402Z THIN PLAIN NUT3DX SUPER CH VI DJK

3 nos Delivery: 120 days
#168

1406 0026 WASHER BONDED 3DX SUPER CH III E

1406 0026 WASHER BONDED 3DX SUPER CH III E

30 nos Delivery: 120 days
#169

1450 0001 GREASE NIPPLE 1 by 8 Inch BSP 3DX SUPER CH I CH V GIMNOP CH VI B D L M N O P Q R S Y CH XXXI BFIK

1450 0001 GREASE NIPPLE 1 by 8 Inch BSP 3DX SUPER CH I CH V GIMNOP CH VI B D L M N O P Q R S Y CH XXXI BFIK

240 nos Delivery: 120 days
#170

1450 1002 GREASE NIPPLE

1450 1002 GREASE NIPPLE

28 nos Delivery: 120 days

Corrigendum Updates

2 Updates
#1

Update

01-Apr-2025

Extended Deadline

08-Apr-2025, 10:00 am

Opening Date

08-Apr-2025, 10:30 am

#2

Update

22-Mar-2025

Extended Deadline

01-Apr-2025, 9:00 am

Opening Date

01-Apr-2025, 9:30 am

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-22-03-2025 14:32:48
2
**********   Under PMA
-31-03-2025 20:04:40
3
**********   Under PMA
-29-03-2025 16:53:38
4
**********   Under PMA
-27-03-2025 13:15:42

Frequently Asked Questions

Key insights about DELHI tender market

What are the eligibility requirements for GEM/2025/B/5982176?

The eligibility requirements include being a registered entity that has demonstrated experience in supplying spare parts for heavy machinery like JCBs. Bidders must show financial stability through proven performance and should comply with government procurement procedures.

What technical specifications are required for the JCB spare parts?

The technical specifications for JCB spare parts require that all components must match the manufacturer's standards for performance and quality. Bidders must provide comprehensive technical documentation that verifies the compatibility of their offered products with the relevant JCB machinery.

What are the EMD details for participating in the tender?

The Earnest Money Deposit (EMD) requirements may vary, but generally, it serves as a security measure from bidders participating in the tender. Specific amounts and submission procedures will be specified in the tender documentation.

How should submissions be made for this tender?

Submissions should be made electronically via the designated government procurement platform. Bidders must follow the guidelines laid out for document formats, and ensure all necessary documents are securely attached to avoid disqualification.

Are there benefits available for MSEs and startups participating in this tender?

Yes, there are specific benefits for Micro, Small, and Medium Enterprises (MSEs) aimed at simplifying the bidding process. Additionally, startups are encouraged through incentives that support local manufacturing in alignment with the Make in India policies.

Similar Tenders

5 found
Urgent

Bucket Cylinder Part No. 4450651 of Tata Hitachi EX1200 Hydraulic Excavator

Moil Limited

📍 BHANDARA, MAHARASHTRA

EMD: ₹25,000
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

BEML Bharat Earth Movers Limited Outrigger Cylinder Spares Seal Kit Tender Palakkad Kerala 459SD00034 2026

Bharat Earth Movers Limited (beml)

📍 PALAKKAD, KERALA

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM

SEAL KIT Part no 130HC02134

Central Coalfields Limited

📍 HAZARIBAG, JHARKHAND

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

Material No. 110000000000015768 BALL VALVE 65 NB for Yard 16401,Material No. 110000000000015286 BAL

Mazagon Dock Shipbuilders Limited

📍 MUMBAI, MAHARASHTRA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

ST040170088 SEAL OILVAPOUR EXTRACTOR BLOWER

Nlc India Limited

📍 CUDDALORE, TAMIL NADU

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM