TenderDekho Logo
GEM

Bharat Petroleum Corporation Ltd Supply and Installation of Two Inverter Split AC Shahjahanpur Uttar Pradesh 2026

Bid Publish Date

15-Jul-2026, 12:08 am

Bid End Date

25-Jul-2026, 10:00 am

Progress

Issue15-Jul-2026, 12:08 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Key Highlights

  • BPCL procurement for Shahjahanpur depot
  • Two inverter split AC units as scope
  • 25% quantity flex and extension terms under option clause
  • Depot installation and commissioning requirement
  • ATC document to be reviewed for site-specific terms
  • Delivery timeline tied to original delivery order with extensions

Tender Overview

Bharat Petroleum Corporation Ltd invites bids for the supply and installation of two inverter split air conditioners at the Shahjahanpur depot, Uttar Pradesh (242001). The scope specifies 2 inverter split units, with BPCL retaining the right to adjust quantities by up to 25% during contract placement or currency. Location-focused procurement under BPCL’s depots requires timely delivery post-order, with extension possibilities driven by the option clause. This tender emphasizes on-site installation capabilities and adherence to depot operating schedules in Shahjahanpur.

Technical Specifications & Requirements

  • Product: 2 inverter split air conditioners for Shahjahanpur depot
  • Category: AC supply, installation, and commissioning at BPCL depot
  • Delivery/Installation: On-site installation at Shahjahanpur, Uttar Pradesh; delivery timeline governed by original delivery period; option clause may adjust during currency with minimum 30 days extension when applicable
  • Vendor Capability: Demonstrated ability to install and commission split AC systems in a depot environment; supplier must align with BPCL terms for depot equipment
  • BOQ: No items listed in BOQ; bidders should prepare for two-unit scope and installation support
  • Standards/Compliance: Not specified in data; please align with standard electrical safety and indoor unit requirements as per depot guidelines

Terms, Conditions & Eligibility

  • Quantity Flexibility: BPCL may increase/decrease quantity up to 25% at bid or contract stage; extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • Delivery Window: Delivery period begins from the last date of the original delivery order; extension terms apply per option clause
  • Payment Terms: Not specified in tender data; bidders should anticipate BPCL standard terms and prepare for possible milestone-based payments
  • EMD/Bid Security: Not specified in data; bidders must verify and prepare typical EMD as per BPCL procurement norms
  • ATC/ATC Document: Buyer uploaded ATC document; bidders should review for any depot-specific conditions
  • Documentation: Ensure submission of standard tender documents per BPCL guidelines, including GST, PAN, and installation certifications when issued

Key Specifications

  • Product/service names: inverter split air conditioners

  • Quantities: 2 units

  • Estimated value: not specified

  • Experience: prior installation of split AC systems in depot environments

  • Quality/standards: on-site installation, electrical safety compliance to be ensured

  • Testing/commissioning: post-installation commissioning at Shahjahanpur depot

  • Warranty: not specified in data; bidders should clarify warranty terms in bid

Terms & Conditions

  • Quantity may be increased up to 25% during contract

  • Delivery period starts from last date of original order

  • Payment terms and EMD to be confirmed in ATC and BPCL norms

Important Clauses

Delivery Schedule

Delivery period commences from the last date of the original delivery order; extended time is (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Payment Terms

Detailed payment terms are not specified in data; bidders should align with BPCL standard procurement terms

Penalties/Liquidated Damages

Not specified in data; bidders must review ATC for any LD provisions

Bidder Eligibility

  • Experience in supplying/installing inverter split AC systems

  • Ability to perform on-site depot installation at Shahjahanpur

  • Comply with BPCL procurement norms and provide required documentation

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply and installation of two Inverter Split AC at Shahjahanpur depot

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Shahjahanpur

Delivery Pincodes

242307

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Prankur Yadav242307,Banthra Depot, Near Banthra Railway Station, Village BanthraShahjahanpurUttar Pradesh242307115-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9606984.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Installation of Inverter AC,Supply of Inverter Split AC

Indian Army

Posted: 20 February 2025
Closed: 13 March 2025
GEM

Contract Bidding Open For Supply, Installation, Testing, Commissioning of 2 ton Inverter Split AC at CEPT, 3rd floor,Chinchubandar HO,Mumbai. in MUMBAI, MAHARASHTRA

N/A

MUMBAI, MAHARASHTRA

Posted: 18 March 2024
Closed: 25 March 2024
EPROCURE

Contract Bidding Open For SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF INVERTER TYPE SPLIT AC UNITS IN IT AND CRC SECTIONS AT KTDC CORPORATE OFFICE, THIRUVANANTHAPURAM in THIRUVANANTHAPURAM, KERALA

Kerala Tourism Development Corporation

THIRUVANANTHAPURAM, KERALA

Posted: 5 May 2026
Closed: 16 May 2026
EPROCURE

Open Tender for SITC of 1.5 ton Inverter Split AC and repairing of second AC at Mahim HO, Mumbai. 2nd Call in MUMBAI, MAHARASHTRA

N/A

MUMBAI, MAHARASHTRA

Posted: 3 April 2024
Closed: 9 April 2024
EPROCURE

Tender Notice for Supply and Installation of Split Air Conditioner in JODHPUR, RAJASTHAN

N/A

JODHPUR, RAJASTHAN

Posted: 20 April 2023
Closed: 1 May 2023
EPROCURE

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar AC installation

4

Financial statements or turnkey project summary

5

EMD documents (as per BPCL norms)

6

Technical bid documents and compliance certificates

7

OEM authorizations or brand approvals (if required by BPCL)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for Shahjahanpur BPCL air conditioner tender 2026?

Bidders must submit standard BPCL bid documents, provide GST and PAN, include experience certificates for AC installation, and furnish EMD as per BPCL norms. Review the ATC for site-specific terms and ensure on-site commissioning capability at Shahjahanpur depot.

What documents are required for BPCL AC installation tender in UP?

Required documents include GST certificate, PAN card, company profile, experience certificates for depot installations, financial statements, EMD, technical compliance certificates, and OEM authorizations if applicable. Ensure installation capability and safety certifications before submission.

What are the delivery terms for BPCL Shahjahanpur AC project 2026?

Delivery terms reference the original delivery order with a potential 25% quantity adjustment. If exercised, the extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What standards or compliance are required for BPCL AC installation?

Data lacks explicit standards; bidders should align with electrical safety and depot installation guidelines. Include warranty terms, post-installation service, and compliance with local electrical codes during installation and commissioning.

What is the scope of work for BPCL Shahjahanpur AC tender?

Scope includes the supply and installation of 2 inverter split air conditioners at the Shahjahanpur depot, with on-site commissioning and potential quantity adjustments up to 25% during contract execution.

When is the BPCL AC installation bid expected to close?

Exact bid submission deadlines are not provided in data; bidders should monitor BPCL portal updates and ATC document for submission timelines and site access arrangements in Shahjahanpur, Uttar Pradesh.

How will BPCL handle payment terms for the AC contract?

Payment terms are not specified in the provided data. Bidders should expect standard BPCL procurement practices and confirm terms in the ATC; prepare for milestone-based payments following delivery and installation acceptance.

Are OEM authorizations required for BPCL Shahjahanpur AC bid?

OEM authorizations may be required; the ATC must be reviewed for branding or authorization clauses. If applicable, provide official manufacturer authorization and ensure product is compatible with BPCL depot electrical standards.

Similar Tenders

5 found

Energy Efficiency Services Limited 1.5 TR Inverter Split AC Tender Procurement 83 Units with Installation 1-Year Warranty 2026

Energy Efficiency Services Limited

📍 GAUTAM BUDDHA NAGAR, UTTAR PRADESH

EMD: ₹50,000
Est: ₹19.1 L
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

SUPPLY INSTALLATION TESTING AND COMMISSIONING OF SPLIT AIR CONDITIONER(AC)

Nagar Palika Parishad Garhmukteshwar

📍 GHAZIABAD, UTTAR PRADESH

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

Tender Notice for Providing and Installation of 70 nos. 1.5 ton, 5-star inverter technology Split ACs at Shakti Sadan Building PSTCL Patiala in PATIALA, PUNJAB

Department of Power

📍 PATIALA, PUNJAB

EMD: ₹65,400
Est: ₹32.7 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View EPROCURE
Urgent

Procurement Opportunity: INSTALLATION OF SPLIT AIR CONDITIONER IN OFFICE CABIN AT M.C. PETROL PUMP, SECTOR 51, CHANDIGARH in CHANDIGARH, CHANDIGARH

Municipal Corporation

📍 CHANDIGARH, CHANDIGARH

EMD: ₹1,050
Est: ₹52,479
⏰ Deadline: 6 days left
🛒 Type: Works
View EPROCURE
Urgent

Bids are Invited For Providing, Fixing, Installing and handing over of Split Type Air Conditioners at Govt. Art College Sector 10, Chandigarh in CHANDIGARH, CHANDIGARH

Chandigarh Administration

📍 CHANDIGARH, CHANDIGARH

EMD: ₹20,825
Est: ₹10.4 L
⏰ Deadline: 3 days left
🛒 Type: Works
View EPROCURE