BHEL Procurement of Electrical Equipment by Department of Heavy Industry India 2026 – GEM Tender Requirements
Bharat Heavy Electricals Limited (bhel)
MEDAK, TELANGANA
Progress
Quantity
5
Category
TC9761748006
Bid Type
Two Packet Bid
Organization: Bharat Heavy Electricals Limited (BHEL) in Medak, Telangana. Procurement opportunity with an option clause allowing up to 25% quantity increase at contracted rates, and a similar extension approach during the contract period. A detailed ATC document has been uploaded. The BOQ lists 5 items though individual scales are not specified. The tender title is unavailable, and the estimated value and EMD are not disclosed. The project context appears to involve heavy industry equipment procurement under the Department of Heavy Industry. The unique clause is the flexible quantity/delivery framework intended to manage demand shifts.
Item quantity and unit specifications are not disclosed; bidders must refer to BOQ/ATC
Delivery schedule subject to option clause with minimum 30 days extension
Is there IS 550/ISO standards reference? Not specified
ATC indicates compliance requirements but exact product specs are not listed
BOQ consists of 5 items; detailed specs to be clarified in subsequent documentation
Quantity variation up to 25% with corresponding price and delivery changes
Delivery extension governed by original and increased quantities
ATC document governs technical and contractual requirements
Delivery period can be extended based on the option clause with a minimum 30-day extension; timing linked to quantity changes.
Purchaser may increase/decrease quantity up to 25% during placement and currency of contract at contracted rates.
Bidders must review the uploaded ATC document and ensure bid alignment with its requirements.
Experience in similar heavy industry procurements
GST registration and valid PAN card
Financial stability evidenced by recent financial statements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
TC9761748006 , DUMMY1 , DUMMY2 , DUMMY3 , DUMMY4
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
160
Delivery Locations
1
Delivery Cities
Sangareddy
Delivery Pincodes
502032
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sangala Raghaja | 502032,TC Stores , BHEL HPEP , Ramachandrapura | Sangareddy | Telangana | 502032 | 1 | 160 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Heavy Electricals Limited (bhel)
MEDAK, TELANGANA
Bharat Heavy Electricals Limited (bhel)
MEDAK, TELANGANA
Bharat Heavy Electricals Limited (bhel)
MEDAK, TELANGANA
Bharat Heavy Electricals Limited (bhel)
MEDAK, TELANGANA
Bharat Heavy Electricals Limited (bhel)
MEDAK, TELANGANA
Tender Results
Loading results...
TC9761748006
SCREW PUMP WITH GEAR/PINION WHEEL
DUMMY1
DUMMY 1
DUMMY2
DUMMY 2
DUMMY3
DUMMY 3
DUMMY4
DUMMY 4
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | TC9761748006 | SCREW PUMP WITH GEAR/PINION WHEEL | 1 | ea | hpep_tc_con_001 | 160 | |
| 2 | DUMMY1 | DUMMY 1 | 1 | ea | hpep_tc_con_001 | 160 | |
| 3 | DUMMY2 | DUMMY 2 | 1 | ea | hpep_tc_con_001 | 160 | |
| 4 | DUMMY3 | DUMMY 3 | 1 | ea | hpep_tc_con_001 | 160 | |
| 5 | DUMMY4 | DUMMY 4 | 1 | ea | hpep_tc_con_001 | 160 |
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience Certificates for similar procurements
Financial Statements (last 2-3 years)
EMD/Security Deposit as per GEM rules (amount not disclosed in data)
Technical bid documents aligned to ATC
OEM Authorization or Manufacturer Certificate
Authorized Signatory Power of Attorney
Key insights about TELANGANA tender market
Bidders must review the uploaded ATC, ensure compliance with the option clause allowing up to 25% quantity change, and prepare documents listed in the Terms. Include GST, PAN, experience certificates, financial statements, and OEM authorizations. Ensure alignment with delivery extension rules and submit through GEM.
Required documents include GST registration, PAN card, experience certificates for similar work, financial statements for the last 2-3 years, EMD as per GEM, technical bid documents aligned to ATC, OEM authorizations, and power of attorney for signatory. Prepare in per the ATC guidelines.
Delivery extensions use the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If the original period is under 30 days, the extension equals the original period. The 25% quantity option affects timing and delivery windows.
The BOQ specifies 5 items, but individual quantities and units are not disclosed in the available data. Bidders should review the BOQ and ATC to determine exact procurement scope, and ensure all five items are addressed in the bid with compliant specifications.
The tender data does not specify exact standards; bidders should rely on the ATC for compliance requirements and ensure OEM authorizations and quality credentials are in order. Prepare ISI/ISO certifications only if mandated by the ATC or BOQ later.
Timeline details are not provided in the data; bidders should monitor GEM postings for start/end dates and ATC updates. Prepare bid documents in advance, ensure EMD submission per GEM norms, and align with the 25% quantity option when planning delivery milestones.
Verify eligibility by ensuring GST registration, valid PAN, and experience in similar heavy industry procurements. Financial stability evidenced by recent statements, and OEM authorizations. Review ATC for any location-specific requirements and ensure bid submission through GEM with the required documents.
Key risks include unclear exact BOQ quantities, reliance on ATC for technical specs, and delivery extensions tied to quantity changes. Ensure robust BOM planning for all 5 items, secure reliable suppliers for OEM components, and align with the 25% quantity variation clause to avoid penalties.
Bharat Heavy Electricals Limited (bhel)
📍 MEDAK, TELANGANA
Bharat Heavy Electricals Limited (bhel)
📍 MEDAK, TELANGANA
📍 MEDAK, TELANGANA
Bharat Heavy Electricals Limited (bhel)
📍 MEDAK, TELANGANA
Bharat Heavy Electricals Limited (bhel)
📍 MEDAK, TELANGANA
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS