TenderDekho Logo
GEM

Indian Army Air Conditioner & Fans Tender Sonitpur Assam 2026 – ISI/IS 550-like Standards, OEM Installation

Bid Publish Date

07-Jul-2026, 7:34 pm

Bid End Date

17-Jul-2026, 8:00 pm

Progress

Issue07-Jul-2026, 7:34 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

18

Category

BRACKET

Bid Type

Two Packet Bid

Key Highlights

  • Vendor must be prepared for quantity fluctuation up to 25% during contract and currency
  • OEM installation/commissioning must be performed by OEM-certified resources or OEM-authorised resellers
  • Mandatory Detailed Design Drawings approval within 5 days of contract award; modification cycle within 5 days
  • Advance sample approval required prior to bulk manufacturing
  • Non-disclosure declaration and NDA compliance are mandatory
  • No explicit EMD value provided; bidders should prepare per procurement norms and buyer terms
  • Section on altera delivery period calculation: (increased quantity ÷ original quantity) × Original delivery period with a minimum of 30 days

Tender Overview

Indian Army (Department of Military Affairs) invites bids for air conditioners, stabilizers, brackets, pedestal fans, and wall fans in Sonitpur, Assam 784001. The estimated value and EMD are not disclosed. The procurement covers multiple fan and cooling equipment categories under a single tender, with an emphasis on OEM installation and detailed design approvals. A key differentiator is the option clause allowing quantity variation up to 25% and potential extension of delivery time, calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. The tender requires alignment with approved designs and drawings before fabrication or supply, ensuring conformity to buyer-specified layouts.

  • Organization: Indian Army
  • Location: Sonitpur, Assam
  • Categories: Air Conditioners, Stabilizers, Brackets, Pedestal Fans, Wall Fans
  • Delivery/quantity flexibility: up to 25% variation
  • Critical process: Detailed Design Drawings approval within 5 days of award; approval/modification cycle within 5 days; advance sample approval prior to bulk manufacturing
  • Unique constraint: OEM/ OEM-certified resource or OEM-authorised reseller for installation and commissioning

Technical Specifications & Requirements

No explicit technical specifications are provided in the tender data. The terms specify that successful bidders must obtain Detailed Design Drawings approved by the buyer within 5 days of contract award, and that the seller must supply in strict accordance with the approved drawings. Installation, commissioning, testing, and training (if applicable) must be conducted by OEM-certified personnel or OEM-authorised resellers. The clause implies alignment with standard industry equipment for ACs and fans, with OEM accountability for post-award activities.

  • No explicit performance metrics or standard numbers are listed
  • Required to meet OEM installation standards and approved design drawings
  • Deployment must occur from the last date of the original delivery order if options are exercised
  • NDA and non-disclosure obligations from the bidder
  • Sample approval before bulk manufacturing

Terms, Conditions & Eligibility

  • EMD amount not disclosed; bidders must follow provided terms including option clause up to 25% quantity variation
  • Detailed Design Drawings must be approved within 5 days of award; buyer to respond within 5 days with modifications or approval
  • Bidder must demonstrate sound financial standing (no liquidation, court receivership)
  • Submission must include PAN, GSTIN, cancelled cheque, EFT mandate; advance sample approval required prior to bulk supply
  • Installation/commissioning must be performed by OEM-certified personnel or OEM-authorised reseller
  • Non-disclosure declaration must be uploaded on bidder letterhead
  • Sample clause requires advance sample approval before bulk manufacturing

Key Specifications

  • Product categories: Air Conditioners, Stabilizers, Brackets, Pedestal Fans, Wall Fans

  • Delivery location: Sonitpur, Assam 784001

  • Delivery lead-time: contingent on option clause; base delivery period defined in contract

  • Installation/commissioning: to be done by OEM-certified resource or OEM authorised reseller

  • Design approval timeline: 5 days from award; modification list within 5 days

Terms & Conditions

  • EMD amount not disclosed; comply with standard bidder requirements

  • Delivery quantity may vary by up to 25% during contract and currency

  • Detailed Design Drawings approval and advance sample process are mandatory

Important Clauses

Payment Terms

No explicit payment terms provided; bidders must comply with standard government procurement terms and OEM-based delivery and acceptance

Delivery Schedule

Delivery period begins from last date of original delivery order; extended delivery time for increased quantity follows (increased quantity ÷ original quantity) × Original delivery period with minimum 30 days

Penalties/Liquidated Damages

Penalties/LD terms are not explicitly stated; contract may include LD for delays per standard procurement norms

Bidder Eligibility

  • Should not be under liquidation, court receivership, or similar proceedings

  • Must provide PAN, GSTIN, Cancelled Cheque, and EFT Mandate

  • Installation and commissioning must be performed by OEM-certified personnel or OEM-authorised resellers

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

AIR CONDITIONER , STABILIZER , BRACKET , PEDESTAL FAN , WALL FAN

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9572562.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Air Conditioner,Stabilizer for AC,Water Dispenser,Wall Fan,Air Blower

Armed Forces Tribunal

SRINAGAR, JAMMU & KASHMIR

Posted: 8 February 2025
Closed: 1 March 2025
GEM

Air Conditioner,Heavy duty Air Cooler,Ceiling Fan,Exhaust Fan,Pen Camera,Wall Mounted Fan

Indian Army

HISAR, HARYANA

Posted: 14 December 2024
Closed: 6 January 2025
GEM

Indian Army Desert Air Cooler, Pedestal & Wall Fan Tender Ahmednagar Maharashtra 2026

Indian Army

AHMEDNAGAR, MAHARASHTRA

Posted: 17 January 2026
Closed: 28 January 2026
GEM

PEDESTAL FAN,WALL MOUNT FAN,EXHAUST FAN,PERSONAL FAN

Hindustan Aeronautics Limited (hal)

BANGALORE, KARNATAKA

Posted: 15 May 2025
Closed: 5 June 2025
GEM

Air Conditioner,Stabilizer,Cover,Stand,Installation

Ex-servicemen Contributory Health Scheme (echs)

DEOGHAR, JHARKHAND

Posted: 17 February 2025
Closed: 10 March 2025
GEM

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

AIR CONDITIONER

AIR CONDITIONER

2 nos Delivery: 15 days
#2

STABILIZER

STABILIZER

2 nos Delivery: 15 days
#3

BRACKET

BRACKET

2 nos Delivery: 15 days
#4

PEDESTAL FAN

PEDESTAL FAN

6 nos Delivery: 15 days
#5

WALL FAN

WALL FAN

6 nos Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate duly certified by Bank

5

Non-Disclosure Declaration (on Bidder Letter Head)

6

Advance Sample Approval documentation (as applicable)

7

OEM authorization certificate or OEM-certified/reseller documentation

8

Technical bid documents demonstrating OEM installation capability

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for air conditioner and fan tender in Sonitpur Assam 2026?

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide OEM authorization, NDA, and detailed design drawings approved within 5 days of award. Ensure installation by OEM-certified personnel, and be prepared for up to 25% quantity variation with delivery timelines adjusted accordingly.

What documents are required for the Indian Army fan procurement in Assam?

Submit PAN, GSTIN, cancelled cheque, EFT mandate, and NDA; provide OEM authorization and technical bid documents showing installation capability; also include non-disclosure agreement and advance sample approval documents prior to bulk manufacturing.

What are the installation requirements for OEM-certified resources in this tender?

Installation, commissioning, and testing must be performed by OEM-certified personnel or OEM-authorised resellers; ensure they hold valid OEM certifications and provide proof of authorization with the bid submission.

When is the design approval due after contract award for this tender?

Detailed Design Drawings must be submitted within 5 days of award; buyer will approve or specify modifications within 5 days; any delay shifts the delivery timeline accordingly without LD for buyer-caused delays.

What is the scope of quantity variation allowed in this Indian Army tender?

The purchaser may increase or decrease quantity up to 25% of bid quantity at contract placement and during the currency of the contract at contracted rates; delivery period adjusts per the specified formula with a minimum extension of 30 days.

What standards or certifications are required for this fan procurement?

The tender requires OEM installation capability and NDA compliance; while explicit standards like IS 550 or ISI are not listed, bidders should ensure equipment meets typical Indian Army equipment norms and OEM-verified specifications.

What is required to provide advance sample approval for bulk supply?

The bidder must secure advance sample approval from the buyer before bulk manufacturing; submit the sample along with drawings and compliance statements for evaluation prior to full-scale production.

What are the payment terms for the Indian Army fan contract in Assam?

Specific payment terms are not disclosed in the tender; bidders should align with standard government procurement norms, ensuring compliance with submission of required financial documents and OEM or supplier invoicing terms after delivery and acceptance.

Similar Tenders

5 found
Urgent

Air Conditioner,Voltage stabilizer,wiring,MCB,Socket

Indian Army

📍 JAMMU, JAMMU & KASHMIR

Est: ₹4.4 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

CROMPTON CEILING FAN,AC STABILIZER,AC INSTALLATION,FORK AND SALT BOX,PLASTIC TABLE

Director General Of National Cadet Corps (dgncc)

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM

Television,Television,Wall Fan,AC,Water Cooler,UPS,Revolving chair

Cpwd

📍 JODHPUR, RAJASTHAN

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

AC 1.5 Ton Hot and Cold,AC 2Ton,Water pipe,Stablizr 90 volt,Pedestal Fan,AC installation

Indian Army

📍 NAINITAL, UTTARAKHAND

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Indian Army Pedestal Fan Farata Silent, Fly Catcher, Spray Machine, Magnetic Door Net Tender Jhansi Uttar Pradesh 2026

Indian Army

📍 JHANSI, UTTAR PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM