PUMP ASSLY, SUBMERSIBLE WITH MOTOR, 5.5KW
Bokaro Steel Plant
Bid Publish Date
25-Jun-2026, 9:13 am
Bid End Date
16-Jul-2026, 5:00 pm
Location
Progress
Quantity
3
Bid Type
Single Packet Bid
Product/service: PUMP, SUBMERSIBLE, 7.5HP
Possible quantity adjustment: up to 25% of bid quantity
Delivery formula: (Additional quantity รท Original quantity) ร Original delivery period; minimum 30 days
No BOQ items listed; no explicit ESQ/EMD values provided
ATC terms may contain delivery, warranty, or performance clauses not disclosed in data
Option Clause allows ยฑ25% quantity variation during contract
Delivery period computed with specific formula; minimum 30 days
EMD and start/end dates are not specified in provided data
Not specified in the provided data; ATC may define payment milestones in the final document
Delivery period starts from the last date of original delivery order; extended period uses the option clause formula
Not specified in the available data; may be detailed in ATC or seller terms
Demonstrated experience in supplying submersible pumps or related hydraulic equipment
Financial capacity evidenced by recent statements and turnover benchmarks
Compliance with standard procurement documentation (GST, PAN, OEM authorizations)
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PUMP, SUBMERSIBLE, 7.5HP
End-to-end support โ bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation ยท 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bokaro Steel Plant
Ntpc Limited
Raigarh, CHHATTISGARH
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
Bokaro Steel Plant
BOKARO, JHARKHAND
Rajasthan Electronics And Instruments Limited (reil) - Solar Pv Monitoring System Jaipur
JAIPUR, RAJASTHAN
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar submersible pump supply
Financial statements demonstrating turnover capabilities
EMD submission proof as per ATC (amount not specified here)
Technical bid documents and compliance certificates
OEM authorization letters (if applicable)
Bidders should prepare standard documents (GST, PAN, financials, experience certificates) and be ready to comply with the ATC terms. The tender allows quantity variation up to 25% and requires adherence to the delivery calculation formula. Review OEM authorizations if applicable and ensure ready compliance with delivery timelines and payment terms.
Required documents typically include GST certificate, PAN card, experience certificates for similar submersible pumps, financial statements, proof of EMD submission, and OEM authorizations. Ensure the ATC file is reviewed for any additional technical bid requirements.
The provided data lists the category as PUMP, SUBMERSIBLE, 7.5HP with no detailed performance metrics. Bid evaluators may expect standard industry parameters; bidders should await the ATC for exact head, flow rate, voltage, cable length, and motor enclosure specifications.
The explicit delivery timeline is not stated in the data. The ATC will define the original delivery period and how the extended period is calculated using the option clause, with a minimum extra time of 30 days. Prepare to align project schedules accordingly once the final terms are published.
Payment terms are not disclosed in the extracted data. Final terms are expected in the ATC and contract documents, typically including milestones such as delivery acceptance and warranty activation, and may involve standard government procurement payment structures.
Quantity may be increased or decreased by up to 25% of the bid quantity at contract placement and during the contract period. The extended delivery duration is calculated via the specified formula, maintaining the base contracted rates, subject to supplier feasibility and agreed terms.
Eligibility includes demonstrated experience in supplying submersible pumps, sufficient financial strength, GST and PAN validity, and possession of OEM authorizations if required. Bidders should ensure capability to meet delivery terms and comply with ATC-specified standards and documentation.
OEM authorizations and technical compliance details are typically in the ATC file linked to procurement notices. Access the ATC document to confirm pump model, voltage, efficiency, warranty, and any ISI/ISO certifications required for Rashtriya Ispat Nigam Limited procurement.
Hindustan Copper Limited
๐ RAIGAD, MAHARASHTRA
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
๐ ETAH, UTTAR PRADESH
๐ ANDHRA PRADESH
Nuclear Power Corporation Of India Limited
๐ UTTARA KANNADA, KARNATAKA
MAWS
๐ TIRUNELVELI, TAMIL NADU
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS