AIR COMPRESSOR PLATE,TIE ROD END,TCI UNIT,REGULATOR ASSY 2 PIN,STARTER ASSY,FUEL PUMP MOTOR,BRAKE B
Indian Army
DARJEELING, WEST BENGAL
Progress
Quantity
79
Category
Suction hose hydraulic pump
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a broad range of loader and hydraulic components including suction hose hydraulic pump, loader arm pins and bushes, cylinder seals, hoses, gaskets, oil filters, cabin seals, and related fittings for delivery to BIKANER, RAJASTHAN. The procurement aims to source 35 items with potential quantity adjustments under an option clause, with bidder and OEM turnover criteria guiding eligibility. Unique requirements include vendor code creation documentation and GST invoice handling on the GeM platform. The contract duration hinges on original delivery terms with possible extensions up to 50% of bid quantity. The opportunity targets suppliers capable of supplying rugged, ISI/ISO-compliant components aligned to military standards.
Product/service names: Suction hose hydraulic pump, Loader arm pin tower end, Loader arm bushes (tower end / bucket end), Bucket cylinder head end hose, Loader arm bushings, Hose assemblies, Seal kits (bucket/hand/cabin), Cylinder seals, Gasket sets, Oil filters, Thermostat, Water outlet, Bracketry and fasteners, Isolator components
Quantities: 35 item categories listed; exact quantities not disclosed in BOQ
EMD/Estimated value: Not specified in data; turnover-based eligibility applies
Experience: OEM approvals and proven procurement of mechanical/hydraulic components to government/military-grade buyers
Quality/compliance: Generic requirement for OEM-grade, compatible with loader assemblies and hydraulic systems; no explicit IS/ISO codes provided in data
Option clause allows up to 50% quantity variation at contract and during currency with proportional delivery time extensions
GST invoice and GST portal payment screenshot must accompany GeM bid/invoicing
Minimum average turnover required for bidder and OEMs; audited accounts or CA certificates accepted
GST invoice upload and GST payment confirmation are mandatory on GeM; no explicit advance or milestone terms stated in data
Delivery period commences from last date of original delivery order; extended time scales with additional quantity as per option clause, minimum 30 days
Not explicitly stated in provided terms; standard government procurement penalties may apply per contract if delivery/default occurs
Minimum average annual turnover over last 3 years as per bid document, audited balance sheets or CA/Cost Accountant certificate
OEM turnover criteria satisfied for the offered product category
Documentation compliance: PAN, GSTIN, EFT mandate, cancelled cheque, vendor code creation
Indian Army
DARJEELING, WEST BENGAL
Indian Army
DARJEELING, WEST BENGAL
Indian Army
JALPAIGURI, WEST BENGAL
Indian Army
KUPWARA, JAMMU & KASHMIR
Controller General Of Defence Accounts
JALANDHAR, PUNJAB
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Suction hose hydraulic pump | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 2 | Loader Arm Pin Tower end | As Per specification att | 3 | nos | pankaj_dahiya | 40 |
| 3 | Loader Arm Bushes Tower end | As Per specification att | 4 | nos | pankaj_dahiya | 40 |
| 4 | Loader Arm Pin Bucket end | As Per specification att | 3 | nos | pankaj_dahiya | 40 |
| 5 | Bucket Cylinder Head End Hose | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 6 | Loader Arm Bushes Bucket end | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 7 | Suction hose charge pump | As Per specification att | 1 | nos | pankaj_dahiya | 40 |
| 8 | Bucket intermediate hose | As Per specification att | 3 | nos | pankaj_dahiya | 40 |
| 9 | Flat Face Coupling set | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 10 | Flat Face Coupling set | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 11 | Bucket cylinder seal kit | As Per specification att | 1 | nos | pankaj_dahiya | 40 |
| 12 | Hand pump seal kit | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 13 | Cabin cylinder seal kit | As Per specification att | 2 | pkt | pankaj_dahiya | 40 |
| 14 | Loader lift cylinder hose rod end | As Per specification att | 3 | pkt | pankaj_dahiya | 40 |
| 15 | Bushes cabin lift cylinder | As Per specification att | 2 | pkt | pankaj_dahiya | 40 |
| 16 | Bush lift cylinder | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 17 | Bushes bucket cylinder head end | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 18 | Bushes bucket cylinder rod end | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 19 | Arm cylinder seal kit | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 20 | Loader lift cylinder pipe rod end LH | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 21 | Loader lift cylinder pipe rod end RH | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 22 | Cap oil Filter | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 23 | Tube Turbo Inlet | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 24 | Tube Turbo Outlet | As Per specification att | 1 | nos | pankaj_dahiya | 40 |
| 25 | Nipple | As Per specification att | 4 | nos | pankaj_dahiya | 40 |
| 26 | Thermostat | As Per specification att | 3 | nos | pankaj_dahiya | 40 |
| 27 | Connectur, Water Outlet | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 28 | Spacer | As Per specification att | 1 | nos | pankaj_dahiya | 40 |
| 29 | Cover Valve | As Per specification att | 1 | nos | pankaj_dahiya | 40 |
| 30 | Gasket, Valve Cover | As Per specification att | 4 | nos | pankaj_dahiya | 40 |
| 31 | Nut Lock | As Per specification att | 3 | nos | pankaj_dahiya | 40 |
| 32 | Isolator Noise | As Per specification att | 3 | nos | pankaj_dahiya | 40 |
| 33 | Gasket | As Per specification att | 3 | nos | pankaj_dahiya | 40 |
| 34 | Bracket Rocker Lever | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
| 35 | Bracket Rocker Lever | As Per specification att | 2 | nos | pankaj_dahiya | 40 |
Discover companies most likely to bid on this tender
PAN card copy
GSTIN copy
Cancelled cheque copy
EFT mandate copy certified by bank
Audited balance sheets or CA/Cost Accountant turnover certificate covering last 3 financial years
OEM authorization/documentation for offered product category
GST invoice and GST portal payment screenshot (during GeM invoicing)
Vendor code creation documents (as applicable)
Key insights about RAJASTHAN tender market
Bidders should meet turnover criteria with audited balances or CA certificates, submit PAN/GSTIN, cancelled cheque and EFT mandate, and provide OEM authorizations. Upload GST invoice details on GeM, and ensure vendor code creation as required. Ensure compliance with 50% quantity option and delivery extensions.
Required documents include PAN card, GSTIN, cancelled cheque, EFT mandate, last 3-year turnover proof, OEM authorization for offered items, GST invoice proof on GeM, and vendor code creation documents. These ensure eligibility and proper accounting trail for military procurement.
The BoQ lists 35 categories such as suction hose hydraulic pump, loader arm pins/bushes, various cylinder seals, hoses, gaskets, oil filters, thermostat, water outlet, spacers, brackets, and isolators. Exact quantities are not disclosed; suppliers must ensure OEM-grade compatibility and component authenticity.
Delivery period is tied to the last delivery order date; with option clause, additional time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.
Bidders must upload scanned GST invoice and GST portal payment confirmation on GeM. No advance payment terms are specified; expect standard government payment processing after submission and compliance verification.
OEM turnover must meet the minimum average annual turnover over the last three years, evidenced by audited statements or CA/Cost Accountant certificates. If OEM is under 3 years old, turnover is calculated on completed years post-incorporation.
If quantity increases by up to 50%, the delivery period extends proportionally: (additional time) = (increased quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days.
Vendor code creation requires submitting PAN, GSTIN, cancelled cheque, and EFT mandate. This enables GeM vendor registration and ensures traceable financial transactions for the military procurement.
Indo Tibetan Border Police (itbp)
📍 LOHIT, ARUNACHAL PRADESH
Indo Tibetan Border Police (itbp)
📍 LEH, JAMMU & KASHMIR
Northern Coalfields Limited
📍 SONBHADRA, UTTAR PRADESH
Indian Oil Corporation Limited
📍 SULTANPUR, UTTAR PRADESH
Indian Army
📍 BIKANER, RAJASTHAN
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS