BEND, CB-L, FLG, MS, 90DEG, 450MM,BEND, CB-L, PE, MS, 90DEG, 300MM,BEND, CB-L, FLG, MS, 45DEG, 450M
Ntpc Limited
Raigarh, CHHATTISGARH
Bid Publish Date
09-Jul-2026, 7:52 pm
Bid End Date
30-Jul-2026, 10:00 am
Progress
Quantity
3
Bid Type
Two Packet Bid
The opportunity is issued by Northern Coalfields Limited under the Coal India Limited framework, seeking supply of Goods with a flexible quantity model and delivery terms embedded in the Buyer Added Terms. While the BOQ contains 0 items and there is no detailed product list, the tender retains scope for altered quantity up to 25% of bid/contracted quantities and extended delivery windows calculated by a defined formula. The procurement location is not disclosed in the data, but relates to the NCL/Coal India supply chain. The emphasis is on compliant bid pricing that includes all costs and adheres to the option clause mechanics. A notable differentiator is the precise delivery-time calculation when quantities are increased, ensuring bidders model their schedules accordingly.
Product/service names: Not specified in BOQ; procurement is for generic 'Goods' supply under option-based quantity clause
Quantities/values: 25% quantity increase/decrease allowed; exact numbers to be defined in purchase order
EMD/Estimated value: Not provided in data; bidders should verify ATC for amount
Category/scope: Supply of goods only; no installation or services indicated
Delivery/installation: Extended delivery period formula; minimum 30 days when increased quantity
Experience: Not specified; refer to ATC for eligibility requirements
Testing/quality: Not specified in data; await BOQ/ATC guidance
Option clause allows 25% quantity variation at order and during contract
Delivery period calculation uses (Increased/Original) × Original period with min 30 days
Scope is supply-only; all costs must be included in bid price
ATC document governs additional terms not present in data
No BOQ items or explicit EMD/estimated value provided
Not specified in provided data; refer to ATC for terms, ensure price includes all costs
Delivery period starts from last date of original delivery order; extended time formula applies with minimum 30 days
Not stated in data; ATC may define LD or penalties; bidders should verify
Must submit GST registration and PAN
Demonstrate experience with similar supply contracts
Financial statements showing stability for bid evaluation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
CPLNG; RESILIENT, SPLIT, 5706NM, 251MM, 246MM
Payment Timelines
Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Singrauli
Delivery Pincodes
486884
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sahil Watta | 486884,DEPOT OFFICE, REGIONAL STORES, NIGAHI PROJECT, NCL, PO - NIGAHI | Singrauli | Madhya Pradesh | 486884 | 3 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Ntpc Limited
Raigarh, CHHATTISGARH
Patratu Vidyut Utpadan Nigam Limited
HAZARIBAG, JHARKHAND
Bokaro Steel Plant
BOKARO, JHARKHAND
Rourkela Steel Plant
SUNDERGARH, ODISHA
Bokaro Steel Plant
BOKARO, JHARKHAND
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply contracts
Financial statements (last 2-3 years)
EMD/Security deposit documentation as per ATC
Technical bid documents demonstrating compliance with scope
OEM authorizations or confirmations if applicable
Any specific IS or ISO certifications if later specified in ATC
Bidders should prepare all-inclusive pricing, await ATC guidance, and ensure GST, PAN, and financials are ready. The tender allows a 25% quantity variation and a delivery-extension rule. Verify the exact EMD amount in the ATC, and ensure compliance with the delivery-computation formula for extended timelines.
Required documents include GST registration, PAN, experience certificates for similar supply contracts, recent financial statements, EMD/security deposit, technical bid, and OEM authorizations if applicable. ATC may specify additional items; ensure submission as per ATC guidance.
If quantity increases are exercised, additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend up to the original delivery period during the option exercise.
Data shows generic 'Goods' supply scope with no itemized BOQ. Bidders must rely on ATC to identify exact product categories, ensuring compliance with any standards or OEM requirements specified there.
ATC clarifies all buyer-specific terms, including scope, payment, warranties, and any special conditions. Bidders must study ATC to align pricing, documentation, and delivery plans with the purchaser's expectations.
EMD amount is not disclosed in the summary; bidders should check the ATC for the exact EMD and mode of payment. Prepare an EMD submission accordingly and ensure compliance with tender timing.
Kerala State Electricity Board (kseb)
📍 KOTTAYAM, KERALA
Bokaro Steel Plant
📍 BOKARO, JHARKHAND
Hindustan Petroleum Corporation Ltd
📍 MUMBAI, MAHARASHTRA
Iisco Steel Plant
📍 BARDHAMAN, WEST BENGAL
Ntpc Limited
📍 AMBEDKAR NAGAR, UTTAR PRADESH
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS