Indian Army Lamination Machine, Fevicol, Registers tender Darjeeling West Bengal 2026
Indian Army
DARJEELING, WEST BENGAL
Bid Publish Date
27-Jan-2026, 4:57 pm
Bid End Date
07-Feb-2026, 5:00 pm
EMD
₹50,000
Location
Progress
Quantity
5
Bid Type
Two Packet Bid
Urban Development And Housing Department Bihar invites bids for a Drinking Water ATM / Water Vending Machine (Version 2). Bid scope includes water purification with RFID/NFC card, coin/card payments, and mobile wallet acceptance across multiple dispensing points. The system must supply purified water via an integrated RO/UV/Multi-Media filtration train, with an in-built 15°C chiller and 20-liter container vending support. Key differentiators include a comprehensive display of water purity parameters, robust enclosure, and on-site installation with training. Estimated value is not disclosed; bidders should anticipate a project scale aligned to municipal water vending deployments in Bihar. The tender emphasizes end-to-end compliance with central/national lab reporting and a strong after-sales support framework.
Water Quality Monitoring: real-time pH, TDS, temperature display; backlit touch display
Payment Methods: coin acceptor, RFID/NFC card, and mobile wallet acceptance
Chiller: integrated 15°C cooling; in-built chiller tank; material specs to be defined
Filtration: multi-media pre-filtration; RO membrane; post-UV disinfection; prescribed number of stages
Enclosure: MS frame with PU insulation; anti-skid flooring; enclosed grill/mesh protection
Power: standard supply with backup capabilities; CIP tank for membrane cleaning
Test & Compliance: NABL/ILAC lab test reports; RoHS/GreenGuard/5S certifications
Warranty: 1 year on tanks, motors, filters; training and trial run included
EMD ₹50,000; bid submission via DD or online where applicable
25% quantity variation rights; extended delivery period rules apply
ISO certifications and OEM authorization mandatory; local service center required
EMD payable; 25% quantity variation allowed; payment terms aligned to contract milestones
Delivery period linked to original order date with possible extensions per option clause
Penalties and LDs apply as per contract terms; detailed schedule to be provided in purchase order
Operational local service center with verifiable documents
Minimum 1 civil engineer and 1 mechanical engineer in firm
OEM authorization and ISO certifications as specified
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
DARJEELING, WEST BENGAL
Purnia District Panchayats
PURNIA, BIHAR
Purnia District Panchayats
PURNIA, BIHAR
Panchayati Raj Department
DARBHANGA, BIHAR
Panchayati Raj Department
DARBHANGA, BIHAR
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Coin / Card Acceptor / Quantity of Dispensing Water | Number of Dispensing points | 4, 5, 6 Or higher |
| Coin / Card Acceptor / Quantity of Dispensing Water | Water Dispensing using coin acceptor | Yes |
| Coin / Card Acceptor / Quantity of Dispensing Water | Coins accepted for payment | Rs. 5 |
| Coin / Card Acceptor / Quantity of Dispensing Water | Water Dispensing using RFID/NFC card | Yes |
| Coin / Card Acceptor / Quantity of Dispensing Water | Mobile Wallet accepted for payment | Yes |
| CAPACITY / TYPE / WATER SOURCE / OUTLET WATER QUALITY | Purification Capacity of Water ATM (LPH) | 500, 1000, 2000 Or higher |
| CAPACITY / TYPE / WATER SOURCE / OUTLET WATER QUALITY | Type of Operation | Manual, Semi-Automatic, Automatic with Multi-Processor Integrated Control System and remotely conrolled web based Server system Or higher |
| CAPACITY / TYPE / WATER SOURCE / OUTLET WATER QUALITY | Water Source | Municipal Tap water |
| TECHNOLOGY | Technology | Reverse Osmosis (RO) |
| TECHNOLOGY | Anti scalant dosing pump | Yes |
| TECHNOLOGY | pH Correction Dosing Pump | Yes |
| CONSTRUCTIONAL | Raw water Storage capacity (Indicate '0' for direct connection to continuous Tap Water source) | 500, 1000, 2000, 3000, 5000, 8000, 10000 Or higher |
| CONSTRUCTIONAL | Raw water Storage Tank Material of Construction | HDPE |
| CONSTRUCTIONAL | Location of the Raw Water Storage Tank | Outside the ATM Enclosure |
| CONSTRUCTIONAL | Treated water Storage capacity | 401-500, 501-600, 601-700, 701-800, 801-1000 Or higher |
| CONSTRUCTIONAL | Treated water Storage Tank Material of Construction | Stainless Steel 316 Gr, Stainless Steel 304 Gr Or higher |
| CONSTRUCTIONAL | Equipped with an in-built chiller unit for providing continuous cold water of temperature around 15 degree Celcius | Yes |
| CONSTRUCTIONAL | In-built Chiller Tank Capacity (Liter) | 301-350, 351-400, 401-500, 501-600, 601-700, 701-800, 801-1000 Or higher |
| CONSTRUCTIONAL | Chiller Tank Material of Construction | Stainless Steel 316 Gr, Stainless Steel 304 Gr Or higher |
| CONSTRUCTIONAL | Number of Filtration steps | 5 |
| CONSTRUCTIONAL | Provided with suitable vending place for filling container of 20 liters capacity | Yes |
| DISPLAY | Display of water purity parameters | Yes |
| DISPLAY | Display Type | LED Or higher |
| DISPLAY | Backlit Display | Yes |
| DISPLAY | Touch Screen Display | Yes |
| DISPLAY | Display Size (Characters x Lines) | 4 x 2 (4 Ch x 2 lines) |
| DISPLAY | Display of oulet water TDS level | Yes |
| DISPLAY | Display of outlet water pH level | Yes |
| DISPLAY | Display of outlet water Temperature | Yes |
| Inlet / Feed Pump to feed water from raw water storage tank to filter | Inlet / Feed Pump Type | Horizontal Centrifugal |
| Inlet / Feed Pump to feed water from raw water storage tank to filter | Number of Inlet / Feed Pumps | 1 |
| Multi Media Filter Vessels for First stage filtration for suspended particles | Material Of Construction for Multi Media Filter Vessels | FRP, Steel Or higher |
| Multi Media Filter Vessels for First stage filtration for suspended particles | Number of Multi Media Filter Vessels | 2, 1 Or higher |
| Multi-Port Valve to control filtration and backwash for media filter having sand & carbon | Type of Multi-Port Valve | Manual |
| Multi-Port Valve to control filtration and backwash for media filter having sand & carbon | Multi-Port Valve Material of Construction | ABS |
| Multi-Port Valve to control filtration and backwash for media filter having sand & carbon | Number of Multi-Port Valves | 1 |
| Anti scalent Dosing Pump to inhibit scaling of hardness salt and silica on RO Membranes, doze pH and Cl as per water quality | Type of Anti scalent Dosing Pump | Electronic diaphragm |
| Anti scalent Dosing Pump to inhibit scaling of hardness salt and silica on RO Membranes, doze pH and Cl as per water quality | Material Of Construction for Anti scalent Dosing Pump | ABS |
| Anti scalent Dosing Pump to inhibit scaling of hardness salt and silica on RO Membranes, doze pH and Cl as per water quality | Number of Anti scalent Dosing Pumps | 1 |
| pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals | Type of pH Correction Pump | NA |
| pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals | Material Of Construction for pH Correction Dosing Pump | NA |
| pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals | Number of pH Correction Dosing Pumps | NA |
| pH Correction Dosing Pump & Dosing Tank to dilute water with dosing chemicals | Dosing Tank Material of Construction | NA |
| High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes | Type of High Pressure Pump | Vertical Centrifugal Pump |
| High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes | Material Of Construction for High Pressure Pump | SS |
| High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes | Number of High Pressure Pumps | 1, 2, 3 Or higher |
| High Pressure Pump to develop required pressure for Reverse Osmosis on RO Membranes | Low pressure switch for Protection of HP pump from burn-out | Yes |
| RO Pressure Vessel | Type of RO Pressure Vessel | Membrane housing mounted on skid - End port type |
| RO Pressure Vessel | Material Of Construction for RO Pressure Vessel | FRP |
| RO Pressure Vessel | Number of RO Pressure Vessels | 2, 3, 4 Or higher |
| Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms | Material Of Construction for UV System | SS |
| Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms | Number of UV Systems | 1, 2 Or higher |
| Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms | Number of UV Lights | 1, 2, 3, 4, 5, 6 Or higher |
| Ultra Violet (UV) System to disinfect water, kill bacteria and micro-organisms | Total UV Power | 12 Watts |
| CIP (Clean-In-Place)Tank to mix / Dilute chemicals for membrane cleaning and permeate back wash | CIP Tank | No |
| CIP (Clean-In-Place)Tank to mix / Dilute chemicals for membrane cleaning and permeate back wash | CIP Tank Material of Construction | NA |
| CIP (Clean-In-Place)Tank to mix / Dilute chemicals for membrane cleaning and permeate back wash | Number of CIP Tanks | NA Or higher |
| Power Source | Power Source | AC Power Supply |
| Power Source | Power Supply | 230 ±10 V AC |
| Power Source | Battery back-up time (Hours) | 6, 8, 10, 12, 14, 16, 18, 20, 22, 24 Or higher |
| Water ATM - Enclosure | Structure | Rigid structure made of SS frame(3), Or higher |
| Water ATM - Enclosure | Thickness of the frame of structure (mm) | 2.5 Or higher |
| Water ATM - Enclosure | Material of Construction of Side Panels of Water ATM | Stainless Steel Sheet Or higher |
| Water ATM - Enclosure | Side Panel Sheet Thickness (mm) | 0.6, 0.8, 1, 1.2 Or higher |
| Water ATM - Enclosure | PUF insulation of Side Panels of Water ATM | With, Without Or higher |
| Water ATM - Enclosure | PUF insulation of the door of Water ATM | With, Without Or higher |
| Water ATM - Enclosure | Provision for in-built litter space | Yes |
| Water ATM - Enclosure | Covered area of treatment plant enclosure (Square Foot) | 10.1-15, 15.1-20, 20.1-30, 30.1-40, 40.1-50, 50.1-60, 60.1-70, 70.1-80, 80.1-90, 90.1-100, 100.1-110, 110.1-120 Or higher |
| Water ATM - Enclosure | Shape of the Water ATM housing | Hexagonal |
| Water ATM - Enclosure | Top Canopy of the Water ATM housing | Flat |
| Water ATM - Enclosure | Headroom for the Water ATM enclosure (Foot) | 7.1-8.0, 8.1-9.0, 9.1-10.0 Or higher |
| Water ATM - Enclosure | Floor area around the Water ATM enclosure covered with anti-skid tiles | Yes |
| Water ATM - Enclosure | Water ATM enclosure protected with enclosed MS grill / mesh | Yes |
| Installation & Commissioning / Warranty | Trial Run and Training provided (inclusive in the Scope of Supply) (Days) | 5, 10 Or higher |
| Installation & Commissioning / Warranty | Warranty for storage Tanks (Year) | 1, 2, 3, 4, 5 Or higher |
| Installation & Commissioning / Warranty | Warranty for electrical motors (Year) | 1, 2, 3 Or higher |
| Installation & Commissioning / Warranty | Warranty for the filters (Year) | 1, 2, 3 Or higher |
| Installation & Commissioning / Warranty | Warranty for the system (Year) | 1, 2, 3 Or higher |
| Test Reports | Availability of Test Report from Central Govt /NABL/ILAC accredited lab to prove confirmity to specification | No |
| Test Reports | All the test reports and certificates shall furnish by the supplier to the buyer/consignee on demand | Yes |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
CA certificate for turnover
ISO 9001:2015, ISO 14001:2015, ISO 45001:2018 certificates
OEM authorization certificate
Notarised Non-Blacklisting affidavit
GSTR-3B latest clearance
CAD product drawings
Proof of local service center
Chiller, RO, UV system test reports from NABL/ILAC lab
Company/firm/proprietor/partnership/LLP registration certificates
Key insights about BIHAR tender market
Bidders must submit GST registration, PAN, CA turnover certificate, ISO 9001/14001/45001 certificates, OEM authorization, CAD drawings, Notarised non-blacklisting affidavit, latest GSTR-3B, and proof of local service center. These documents validate compliance, financial stability, and technical capability for the Drinking Water ATM project.
Demonstrate eligibility with CA turnover certificate, ISO certifications (9001/14001/45001), OEM authorization, and proof of a local service center. Also provide CAD drawings, MSME/ZED certificates if applicable, and at least one civil and one mechanical engineer affidavit as required.
Essential specs include RFID/NFC card and coin payment, 15°C chiller, RO/UV filtration with multiple stages, real-time display of pH/TDs/temperature, 20 L vessel support, anti-scalant dosing, pH dosing, and CIP tank. NABL/ILAC test reports must be available on demand.
The bid end date is not specified in the data provided. bidders should monitor the procurement portal for endpoint notifications; ensure EMD ₹50,000 is ready and all mandatory documents are uploaded before submission closes.
Payment terms align with the contract milestones; EMD submitted; 25% quantity variation rights at purchaser's discretion; detailed payment schedule will be in the purchase order after bid evaluation.
Warranty includes 1 year on storage tanks, electrical motors, and filters; trial run and training included; service support matrices and local service center obligations; OEM support required for ongoing maintenance.
Mandatory certifications include ISO 9001:2015, 14001:2015, 45001:2018, RoHS/GreenGuard/5S where applicable, and OEM authorization. CAD drawings and NABL/ILAC compliant test reports must be available on demand.
The purchaser may increase/decrease quantity by up to 25% and extend delivery time using the option clause; delivery period is calculated as (Additional quantity/Original quantity) × Original delivery period, minimum 30 days, with extension rules outlined in contract.
Rural Development Department
📍 SAMASTIPUR, BIHAR
Indian Army
Bhabha Atomic Research Centre
📍 MUMBAI, MAHARASHTRA
Mumbai Port Trust
📍 MUMBAI, MAHARASHTRA
Indo Tibetan Border Police (itbp)
📍 SHIVPURI, MADHYA PRADESH
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS