W90415302617 PRIMARY WATER PUMP AND MOTOR SET DISCHARGE-135 M3/HR HEAD-75 M SPEC: TG60729 REV: 06
Bharat Heavy Electricals Limited (bhel)
HARIDWAR, UTTARAKHAND
Bid Publish Date
01-Jul-2026, 2:11 pm
Bid End Date
11-Jul-2026, 3:00 pm
Location
Progress
Quantity
4
Category
TG9041530002 PRIMARY WATER PUMP AND MOTOR S ET DISCHARGE-135 M3/HR HEAD-75 M WITH IE4 MOTOR N. STD: TG
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited (BHEL), Haridwar, Uttarakhand, invites bids for a Primary Water Pump and Motor Set with a discharge of 135 m3/hr and head of 75 m powered by an IE4 motor. The package includes the motor- pump assembly and a spare kit for PW pump motor set (800 MW material code W90415302617). Estimated quantum is unspecified; delivery terms follow customer approvals, with a 25% optional quantity increase/decrease during contract and currency periods. The context is compliance-driven procurement, targeting NTPC/Singareni project integration with BHEL SQP endorsement. Key differentiators include customer-approved vendor control, QT/COC-based acceptance for motors below 75 kW, and adherence to NTPC-specific ambient, voltage, and starting requirements. The tender emphasizes structured inline QC and ATC alignment, with emphasis on enabling only NTPC-approved vendors for price bid opening.
Product name: Primary Water Pump and Motor Set (135 m3/hr, 75 m head)
Motor efficiency: IE4
Material code: W90415302617
Project reference: 800 MW Singareni NTPC context
Acceptance: CAT-III for motors <50 kW; CAT-II for 50–75 kW
Approval: NTPC/customer approval required for bid opening
Option clause allows ±25% quantity variation during contract and currency
Delivery time tied to original + extended period formula with minimum 30 days
Bidders must be NTPC/customer-approved vendors; SQP endorsement required
CAT/IW standards: IS:12615 conformity for mid-range motors, COC required
Spare kit for PW pump motor set included per material code
No explicit payment terms in data; bidders should align with standard PSU practice and contract schedules
Delivery period calculated from last date of original delivery order; extended time uses formula with minimum 30 days
Not specified; expect standard clauses aligned with NTPC/BHEL integrations
Must be approved NTPC/customer vendor or obtain credentials per NTPC/customer format
Demonstrate SQP endorsement by BHEL
Provide COC and NTPC-approved test reports for motor categories
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
TG9041530002 PRIMARY WATER PUMP AND MOTOR S ET DISCHARGE-135 M3/HR HEAD-75 M WITH IE4 MOTOR N. STD: TG , TG9741530048 SPARE KIT FOR PW PUMP MOTOR SE T (800 MW Mat. Code-W904153026 17) comprising of: Mechan
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Heavy Electricals Limited (bhel)
HARIDWAR, UTTARAKHAND
Bharat Heavy Electricals Limited (bhel)
HARIDWAR, UTTARAKHAND
Bharat Heavy Electricals Limited (bhel)
HARIDWAR, UTTARAKHAND
Bharat Heavy Electricals Limited (bhel)
HARIDWAR, UTTARAKHAND
Bharat Heavy Electricals Limited (bhel)
HARIDWAR, UTTARAKHAND
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar water pump and motor sets
Financial statements / turnover evidence
EMD deposit proof (if applicable)
Technical bid documents demonstrating compliance with NTPC/Customer formats
OEM authorization / approved vendor credentials
COC and IS/NTPC test reports or equivalent
Key insights about UTTARAKHAND tender market
Bidders must be NTPC/customer-approved or seek approval in the NTPC format, endorse BHEL SQP, and submit COC along with IS/NTPC test reports. Ensure compliance with 135 m3/hr discharge and 75 m head specifications for the PW pump set.
Submit GST certificate, PAN, experience certificates for similar pump sets, financial statements, EMD proof, OEM authorization, NTPC-approved formats, SQP endorsement, and COC/test reports confirming IE4 motor compliance.
Motors <50 kW require CAT-III acceptance with manufacturer COC and contractor confirmation of NTPC-specific conditions; 50–75 kW use CAT-II acceptance with NTPC routine test and IS:12615 criteria.
Delivery time follows the option clause: (increase/original quantity ÷ original quantity) × original delivery period, with a minimum of 30 days; extensions may apply to evaluated quantity changes.
Required standards include NTPC-specific ambient/voltage/frequency compliance, IS:12615 testing where applicable, and BHEL SQP endorsement; motor IE4 efficiency must be demonstrated.
Verify NTPC/customer approval status, ensure OEM authorization is current, and confirm compliance with SQP; supply COC and NTPC-approved test documentation prior to bid opening.
The BOQ includes a spare kit for the PW pump motor set with material code W90415302617, intended for the 800 MW Singareni NTPC context, to accompany the primary pump-motor assembly.
Yes, quantity can vary ±25% at contract award and during currency, with delivery timing adjusted accordingly; minimum 30 days for additional delivery time as a baseline.
Bharat Petroleum Corporation Ltd
📍 MUMBAI, MAHARASHTRA
Indian Oil Corporation Limited
Bhilai Steel Plant
📍 DURG, CHHATTISGARH
📍 TELANGANA
Bharat Heavy Electricals Limited (bhel)
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS