MANILA ROPE, SIZE 1/2" DIA,MANILA ROPE, SIZE 1" DIA
National Fertilizers Limited (nfl)
ROHTAK, HARYANA
Bid Publish Date
15-Jun-2026, 10:58 am
Bid End Date
26-Jun-2026, 9:00 am
Location
Progress
Quantity
450
Category
Rope Loop Anchor Heavy Duty
Bid Type
Two Packet Bid
The procuring organization is the Indian Army under the Department Of Military Affairs, seeking Rope Loop Anchor Heavy Duty and Rope Manila 400 Mtr. The tender scope appears to cover hardware components used in rigging and climbing applications, with emphasis on heavy-duty rope and anchor assemblies. The contract contemplates quantity adjustments up to 25% of bid quantity during and after award, with delivery timelines linked to the original delivery period. A distinctive requirement is the post-award Detailed Design Drawings approval process, necessitating prompt submission within 5 days for buyer review and potential modification within 7 days. The procurement targets suppliers with ongoing availability, avoiding end-of-life products and ensuring at least 1 year of residual market life. The offer must align with the buyer’s schematic drawings and approved modifications to fulfill deliveries at contract rates. The terms indicate a structured, multi-stage approval and delivery cadence, and emphasize compliance with organizational procurement policies rather than explicit product specifications in the published data.
Quantity may be increased/decreased by up to 25% during contract execution
Detailed Design Drawings required within 5 days of award; approvals or changes within 7 days
Evidence of government/PSU supply experience for the last 3 years must be provided
Not specified in data; bidders should prepare per standard government terms and verify with buyer
Delivery period starts from last date of original delivery order; extended time computed as (increased quantity ÷ original quantity) × original period, min 30 days
Not specified in data; standard practice to confirm with issuing authority
Regularly manufactured and supplied same or similar category products to govt bodies for 3 years
Not under liquidation or court receivership; provide undertaking
OEM/Reseller channel capable of meeting 1 year residual market life
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Rope Loop Anchor Heavy Duty , Rope Manila 400 Mtr
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
TECHNICAL
GEM_GENERAL_TERMS_AND_CONDITIONS
National Fertilizers Limited (nfl)
ROHTAK, HARYANA
Indian Army
HARIDWAR, UTTARAKHAND
Bharat Heavy Electricals Limited (bhel)
TIRUCHIRAPPALLI, TAMIL NADU
Indian Navy
Bharat Heavy Electricals Limited (bhel)
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card
GSTIN
Cancelled Cheque
EFT Mandate certified by Bank
Contract copies evidencing 3 years of government/PSU supply
Power of Attorney / OEM authorizations (if applicable)
Brief undertaking regarding non-liquidation status
Documentation demonstrating adherence to non-obsolescence policy
Bidders should verify eligibility: 3 years govt/PSU supply experience, submit PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorizations. Prepare Detailed Design Drawings within 5 days of award and address modifications within 7 days. Understand the 25% quantity option and delivery extension rules before submission.
Required documents include PAN Card, GSTIN, cancelled cheque, EFT Mandate certified by bank, and vendor code creation papers. Demonstrate 3-year govt/PSU supply contracts with copies. Include OEM authorizations if applicable and an undertaking proving non-liquidation status.
No explicit numerical specs published; bidders must rely on buyer-approved Detailed Design Drawings. Ensure drawings are submitted within 5 days of award; respond to modification lists within 7 days. Comply with approved drawings and avoid obsolete products with at least 1 year residual market life.
Delivery begins after the original delivery order date. If quantity increases, extended time = (increased quantity ÷ original quantity) × original delivery period, with a minimum 30 days. The purchaser may extend time up to the original delivery period during the option clause.
Bidders must have regularly manufactured and supplied the same or similar category products to government entities for 3 years prior to bid opening. Provide copies of relevant contracts showing annual quantities during each year.
The data does not specify LD details. Standard practice implies penalties or LD may be applicable; bidders should confirm exact LD rate and schedule during final contract negotiations and ensure they have a robust delivery plan.
Bidders must ensure the offered rope products have at least 1 year residual market life as not to be declared end-of-life by the OEM within that period; provide OEM confirmation and relevant product lifecycle documentation.
Detailed Design Drawings must be submitted within 5 days of award; buyer will approve or list required modifications within 7 days. Supply must strictly follow approved drawings; delays in approvals may shift delivery timelines accordingly.
South Central Railway
📍 Nanded, MAHARASHTRA
National Fertilizers Limited (nfl)
📍 ROHTAK, HARYANA
Bokaro Steel Plant
📍 BOKARO, JHARKHAND
Rashtriya Ispat Nigam Limited
📍 VISAKHAPATNAM, ANDHRA PRADESH
Indian Army
📍 RI BHOI, MEGHALAYA
Sign up now to access all documents
Main Document
TECHNICAL
TECHNICAL
GEM_GENERAL_TERMS_AND_CONDITIONS