Indian Army Con Pentrometer Extension Rod 1000 mm Load Board Perimeter Sign Tender Jhansi Uttar Pradesh 2025
Indian Army
JHANSI, UTTAR PRADESH
Bid Publish Date
05-Jan-2026, 2:20 pm
Bid End Date
16-Jan-2026, 3:00 pm
Location
Progress
Quantity
3
Bid Type
Two Packet Bid
Mangalore Refinery & Petrochemicals Limited invites bids for the procurement of a MINEBEA compression 30 ton load cell under the Materials Department. The tender references a quantity option clause allowing up to 25% quantity variation at contracted rates and a delivery policy tied to the original delivery period. The vendor must align with GeM bidding processes, ensure GST handling as per actuals, and provide necessary banking and GST documentation for Vendor Code creation. The opportunity focuses on precise load cell specification and supplier readiness to support refinery measurement instrumentation. Notable differentiators include the explicit option to increase order quantity within contract terms and the requirement for GST-compliant invoicing.
This tender emphasizes strict adherence to delivery timelines, finance controls, and post-award invoice accuracy, with inspection managed by a nominated agency. The procurement scope centers on a single critical equipment item rather than a broad Bill of Quantities, signaling a focused capital asset purchase rather than a multi-line supply. The emphasis on GST invoicing and EFT mandates reflects MRPL’s financial governance and compliance expectations.
Product/service: MINEBEA compression 30 TON LOAD CELL
Quantity: Not specified (25% option on scale) - contract quantity flexible
EMD/Estimated value: Not disclosed in available data
Standards/certifications: Not specified; ensure OEM-compliant load cell
Delivery/Installation: Delivery period tied to original delivery order date; extended period rules apply
Warranty/Support: Not specified; assess during contract finalization
Testing/Inspection: Nominated Inspection Agency to conduct inspection
Delivery period starts from last date of original delivery order; option increases require calculated time
GST handling and invoicing must align with GeM portal processes and consignee specifications
Up to 25% quantity variation allowed at contracted rates during and after award
GST invoicing through GeM; GST paid as actuals or at the lower quoted rate; payment confirmation required on GST portal
Delivery period calculated from original order date; additional time determined by (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days
Contract termination for failure to deliver, misrepresentation, or bankruptcy; LD not explicitly stated in data
Must have GST registration and PAN
Must provide EFT Mandate and bank-certified documentation
Must comply with GeM-based invoicing and verification
Indian Army
JHANSI, UTTAR PRADESH
Directorate General Of Quality Assurance ( Dgqa)
HOSHANGABAD, MADHYA PRADESH
Indian Army
TINSUKIA, ASSAM
Indian Army
KUPWARA, JAMMU & KASHMIR
Dg Of Defence Estate
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate copy certified by Bank
GST invoice uploaded in GeM portal with GST payment screenshot
Key insights about KARNATAKA tender market
Bidders must submit PAN, GSTIN, Cancelled Cheque, and Bank-certified EFT Mandate. GST invoice and GST payment screenshot must be uploaded on the GeM portal. Ensure vendor code creation documents are complete for MRPL materials department procurement.
The Purchaser reserves the right to increase or decrease the quantity by up to 25% at contracted rates. Additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Invoices must be raised in the consignee’s name with the consignee GSTIN. GST payment confirmation must be captured as a screenshot on the GeM portal, and the GST invoice must accompany the GeM submission for payment processing.
Delivery period starts from the last date of the original delivery order. If the option clause is exercised, the extension follows the formula with a minimum 30 days. Exact dates are defined in the purchase order issued by MRPL.
Eligible bidders must have GST registration, PAN, and an EFT mandate. They must comply with GeM-based processes for vendor code creation and invoicing, and suppliers should be capable of delivering refinery-grade 30-ton load cells with proper documentation.
A Nominated Inspection Agency will conduct the acceptance inspection on MRPL’s behalf. Suppliers should anticipate an inspection to verify product specifications, packaging, and compliance before final acceptance and payment.
The tender category specifies MINEBEA compression load cell as the referenced model. Suppliers must ensure OEM alignment or approval for supplying a compatible MINEBEA 30-ton unit or equivalent with verifiable compatibility.
MRPL can terminate for material non-compliance, failure to deliver on time, insolvency, or misrepresentation. The contract allows corrective action within defined terms, but unresolved failures may lead to contract termination and potential penalties as per terms.
Office Of Dg (mss)
📍 BASTAR, CHHATTISGARH
Brahmaputra Valley Fertilizer Corporation Limited (bvfcl)
📍 DIBRUGARH, ASSAM
National Fertilizers Limited (nfl)
📍 RUPNAGAR, PUNJAB
Indian Navy
Indian Air Force
📍 CACHAR, ASSAM
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS