TenderDekho Logo
GEM

Government Tender Published for Off Season Checking. Inspection. Overhouling. Testing calibration and AMC for Crushing Season 2025. in MUZAFFARNAGAR, UTTAR PRADESH

Bid Publish Date

17-Jun-2026, 4:17 pm

Bid End Date

03-Jul-2026, 5:00 pm

Value

₹3,00,000

Progress

Issue17-Jun-2026, 4:17 pm
Corrigendum17-Jun-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

16

Category

Off Season Checking. Inspection. Overhouling. Testing calibration and AMC for Crushing Season 2025.26 for Fibrizer ACB.1600 AMP Capacity LandT and Havells Make

Bid Type

Two Packet Bid

Categories 52

A tender has been published for N/a Off Season Checking. Inspection. Overhouling. Testing calibration and AMC for Crushing Season 2025. 26 for Fibrizer ACB. 1600 AMP Capacity LandT and Havells Make, Off Season Checking. Inspection. Overhouling. Testing calibration and AMC for L and T Make Main Panel ACB Capacity 4000 Amp. and Bus Bar Coupler ACB, Off Season Checking. Overhouling. Inspection. Calibration and AMC for Crushing Season 2025. 26 for all protection Relay of Main Pannel, Off Season Checking. Overhouling. Inspection. Calibration of 3750 KVA of AVR Pannel with mode of. M. s KEC Make Power Alternator along with AMC for Crushing Season 2025. 26, Testing and Calibration of Metering System for 3MW KEC Alternator Panel, Dismantling and Re alignment of 3000KW AEC MAKE Alternator, Charges for trouble shooting repairs, Off Season Checking. Testing. Alternator earthing of Main Pannel earting system, Supervision and overhaulingl and Elecfrical Testing of AC, Exciter. along with Rotating Diodes for 3MW KEC Make Alternator, OFF SEASON CHECKING INSPECTION. OVERHAULING. TESTING. CALIBRATION FOR CRUSHING SEASON 2025. 26 SUPERVISORY. OVERHAULING FOR 3000KW KEC MAKE ALTERNATOR in MUZAFFARNAGAR, UTTAR PRADESH. Quantity: 16 by. Submission Deadline: 03-07-2026 17: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Off Season Checking. Inspection. Overhouling. Testing calibration and AMC for Crushing Season 2025.26 for Fibrizer ACB.1600 AMP Capacity LandT and Havells Make , Off Season Checking. Inspection. Overhouling. Testing calibration and AMC for L and T Make Main Panel ACB Capacity 4000 Amp. and Bus Bar Coupler ACB , Off Season Checking.Overhouling.Inspection.Calibration and AMC for Crushing Season 2025.26 for all protection Relay of Main Pannel , Off Season Checking. Overhouling.Inspection.Calibration of 3750 KVA of AVR Pannel with mode of. M.s KEC Make Power Alternator along with AMC for Crushing Season 2025.26 , Testing and Calibration of Metering System for 3MW KEC Alternator Panel , Dismantling and Re alignment of 3000KW AEC MAKE Alternator , Charges for trouble shooting repairs , Off Season Checking. Testing.Alternator earthing of Main Pannel earting system , Supervision and overhaulingl and Elecfrical Testing of AC, Exciter. along with Rotating Diodes for 3MW KEC Make Alternator , OFF SEASON CHECKING INSPECTION .OVERHAULING .TESTING .CALIBRATION FOR CRUSHING SEASON 2025.26 SUPERVISORY. OVERHAULING FOR 3000KW KEC MAKE ALTERNATOR

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9482302.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

ROUTINE ELECTRICAL MAINTENANCE OF DEPOT,TRANSFORMER OIL TESTING,INSTALLATION OF ACB SPARES,SRVC F I

Hindustan Petroleum Corporation Ltd

CHANDAULI, UTTAR PRADESH

Posted: 28 May 2025
Closed: 18 June 2025
GEM

Operation and Maintenance of Electrical and Mechanical Installations etc.,Rewinding of Ceiling fan

Airports Authority Of India ,rhq Nr - Rangpuri

BUDGAM, JAMMU & KASHMIR

Posted: 14 January 2025
Closed: 4 February 2025
GEM

Electrical Preventiv,Extra Mandays Electr,Over Time Hours,Supply of Spring Type Earthing cable for

Hindustan Petroleum Corporation Ltd

HASSAN, KARNATAKA

Posted: 8 February 2025
Closed: 18 February 2025
GEM

For Operation and Maintenance , Supervisor Highly Skilled- 1 No.,For Operation and Maintenance , El

Ans,finance,hr,engineering,tech,ops,commercial,general Store,it

WEST DELHI, DELHI

Posted: 14 May 2025
Closed: 29 May 2025
GEM

Isolator 400A,Vacuum Circuit Breaker 3.3KV,Potential Transformer 3.3 KV,HRC HT PT Fuse,Primary side

South Eastern Coalfields Limited

ANUPPUR, MADHYA PRADESH

Posted: 24 May 2025
Closed: 9 June 2025
GEM

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

Off Season Checking. Inspection. Overhouling. Testing calibration and AMC for Crushing Season 2025.26 for Fibrizer ACB.1600 AMP Capacity LandT and Havells Make

Off Season Checking/ Inspection /Overhouling/ Testing calibration and AMC for Crushing Season 2025.26 for Fibrizer ACB.1600 AMP Capacity LandT and Havells Make

2 nos Delivery: 45 days
#2

Off Season Checking. Inspection. Overhouling. Testing calibration and AMC for L and T Make Main Panel ACB Capacity 4000 Amp. and Bus Bar Coupler ACB

Off Season Checking/ Inspection/ Overhouling /Testing calibration and AMC for L and T Make Main Panel ACB Capacity 4000 Amp. and Bus Bar Coupler ACB

4 nos Delivery: 45 days
#3

Off Season Checking.Overhouling.Inspection.Calibration and AMC for Crushing Season 2025.26 for all protection Relay of Main Pannel

Off Season Checking/Overhouling/Inspection/Calibration and AMC for Crushing Season 2025.26 for all protection Relay of Main Pannel

1 job Delivery: 45 days
#4

Off Season Checking. Overhouling.Inspection.Calibration of 3750 KVA of AVR Pannel with mode of. M.s KEC Make Power Alternator along with AMC for Crushing Season 2025.26

Off Season Checking/ Overhouling/Inspection/Calibration of 3750 KVA of AVR Pannel with mode of. M/s KEC Make Power Alternator along with AMC for Crushing Season 2025.26

2 nos Delivery: 45 days
#5

Testing and Calibration of Metering System for 3MW KEC Alternator Panel

Testing and Calibration of Metering System for 3MW KEC Alternator Panel

1 job Delivery: 45 days
#6

Dismantling and Re alignment of 3000KW AEC MAKE Alternator

Dismantling and Re alignment of 3000KW AEC MAKE Alternator

1 nos Delivery: 45 days
#7

Charges for trouble shooting repairs

Charges for trouble shooting repairs

1 per day Delivery: 45 days
#8

Off Season Checking. Testing.Alternator earthing of Main Pannel earting system

Off Season Checking/ Testing/Alternator earthing of Main Pannel earting system

2 nos Delivery: 45 days
#9

Supervision and overhaulingl and Elecfrical Testing of AC, Exciter. along with Rotating Diodes for 3MW KEC Make Alternator

Supervision and overhaulingl and Elecfrical Testing of AC, Exciter. along with Rotating Diodes for 3MW KEC Make Alternator

1 nos Delivery: 45 days
#10

OFF SEASON CHECKING INSPECTION .OVERHAULING .TESTING .CALIBRATION FOR CRUSHING SEASON 2025.26 SUPERVISORY. OVERHAULING FOR 3000KW KEC MAKE ALTERNATOR

OFF SEASON CHECKING INSPECTION /OVERHAULING /TESTING /CALIBRATION FOR CRUSHING SEASON 2025.26 SUPERVISORY/ OVERHAULING FOR 3000KW KEC MAKE ALTERNATOR

1 nos Delivery: 45 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

17-Jun-2026

Similar Tenders

5 found

Uttar Pradesh Cooperative Sugar Factories Federation Limited Jyoti Make Alternator Servicing Tender Sultanpur UP 1500 KW AVR Testing 2026

N/a

📍 SULTANPUR, UTTAR PRADESH

Est: ₹2.0 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Checking Servicing testing & Calibration of AVR Kirloskar Make Alternators

N/a

📍 SHAHJAHANPUR, UTTAR PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Overhauling servicing and AMC of Alternator 1500 kw 1,Overhauling servicing and AMC of AVR 2,Overha

N/a

📍 BUDAUN, UTTAR PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Servicing and testing,Protaction Relay EE make of 3MW Alternator,Metering and Alarm Annunciator Sys

N/a

📍 PILIBHIT, UTTAR PRADESH

Est: ₹1.7 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Thermography of Pannel,Testing and Calibration WTI andOTI of Transformer,Tan Delta VCB Dissovled Ga

Bharat Petroleum Corporation Ltd

📍 GULBARGA, KARNATAKA

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM