Distribution Transformer, 3 Phase, upto and Including 200 KVA ISI Marked To IS 1180 (Part 1)
N/a
JAMMU, JAMMU & KASHMIR
Bid Publish Date
13-Jul-2026, 3:32 pm
Bid End Date
23-Jul-2026, 3:00 pm
Progress
Quantity
1
Bid Type
Single Packet Bid
Modern Coach Factory Raebareli invites bids for Distribution Transformer, 3 Phase, upto and Including 200 KVA ISI Marked To IS 1180 (Part 1) (Q2). Quantity: 1. Submission Deadline: 23-07-2026 15: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Distribution Transformer, 3 Phase, upto and Including 200 KVA ISI Marked To IS 1180 (Part 1) (Q2)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Rae Bareli
Delivery Pincodes
229120
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| HIMANSHU BANSAL | 229120,Modern Coach Factory (MCF), Lalganj, Raebareli | Rae Bareli | Uttar Pradesh | 229120 | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
JAMMU, JAMMU & KASHMIR
N/a
JAMMU, JAMMU & KASHMIR
East Central Railway
CHANDAULI, UTTAR PRADESH
Eastern Railway
MALDA, WEST BENGAL
Indian Army
KANGRA, HIMACHAL PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| STANDARDS | Energy Efficiency Level | 2 |
| STANDARDS | BEE Star Rating | 2, 3, 4, 5 Or higher |
| RATINGS | Nominal System Voltage, HV ( in kV) | 11 |
| RATINGS | Nominal System Voltage, LV ( in Volt) | 433 |
| RATINGS | Standard Ratings (in kVA) | 63 |
| RATINGS | Minimum Basic Insulation Level (in kVp) | 75 |
| RATINGS | No Load Voltage Ratios (in Volts) | 11000/433-250 |
| RATINGS | Highest System Voltage for Equipment (in kV) | 12 |
| RATINGS | Rated Lightning Impulse withstand Voltage (in kV Peak) | 75 |
| CONSTRUCTION | Core Material | CRGO (as per IS:3024 latest) |
| CONSTRUCTION | Conductor (Winding) Material | Copper |
| CONSTRUCTION | Type of Mounting | Pole Mounted, Ground Mounted |
| CONSTRUCTION | Method of System Earthing | solidly earthed |
| CONSTRUCTION | Noise Level at Rated Voltage and Freqeuncy, Maximum (in dB) | 45 |
| TRANSFORMER TANK | Transformer Tank Cover Construction | Non-sealed, Bolted |
| TRANSFORMER TANK | Tank Configuration | With radiator fins |
| TRANSFORMER TANK | Minimum Thickness of Top and Bottom Material of Transformer Tank (in mm) | 5 |
| TRANSFORMER TANK | Minimum Thickness of Side Material of Transformer Tank (in mm) | 3.15 |
| TRANSFORMER TANK | Material of Bolts/Nuts/Washers | Stainless steel (for upto 12 mm size), Brass (for upto 12 mm size), Electro Galvanized (for above 12 mm size), Hot Dip Galvanized (for above 12 mm size) |
| TRANSFORMER TANK | Provision of Conservator | No |
| PAINTING | Type of Painting on Inside of Tank | Oil resistant paint |
| PAINTING | Type of Painting on External Surface of Tank | Epoxy (Primer), Polyurethane (finish coat) |
| TAP CHANGER | Tap Changing Arrangement | Off circuit , externally operated switch with mechanical locking device and a position indicator |
| TAP CHANGER | Winding Tapped | Not applicable |
| TAP CHANGER | Number of Positions | 0 |
| TAP CHANGER | Voltage Variation | +5% to -10% in steps of 2.5% for variation of HV |
| TERMINAL ARRANGEMENT | Transformer Fitted with Bushings of Appropriate Voltage and Current Ratings on LV Side | Yes. 4 Nos. (Conforming to IS:7421) |
| TERMINAL ARRANGEMENT | Provision for Adoption of Cables of Suitable Size on LV Side | No |
| TERMINAL ARRANGEMENT | Cable End Box on HV side | No |
| TERMINAL ARRANGEMENT | Cable End Box on LV side | No |
| AIR CLEARANCE | Minimum Air Clearances in Cable Box | Without cable box |
| AIR CLEARANCE | Provision of Suitable Clamp-Type Bimetallic Connectors on HV and LV Terminals | Not applicable |
| MARKING | Material of Rating Plate | Stainless steel |
| MARKING | Marking Method on Rating Plate | Engraved |
| MARKING | Combined Rating and Terminal Marking Plate | No |
| OPTIONAL FITTINGS | Provision of Dehydrating Breather in lieu of Plain Breathing Device for Transformer | No |
| OPTIONAL FITTINGS | Provision of Filter Valve for Transformers | No |
| OPTIONAL FITTINGS | Provision of Rating Lightning Arrestors | No |
| OPTIONAL FITTINGS | Provision of Bird Guard | No |
| OPTIONAL FITTINGS | Provision of Terminal Connectors | No |
| OPTIONAL FITTINGS | Provision of Non return Valve | No |
| OPTIONAL FITTINGS | Provision of Pressure Relief Device or Explosion Vent (upto 200 KVA doe non-sealed type transformer) | No |
| OPTIONAL FITTINGS | Provision of Protection Relay for Sealed-Type Transformers for Monitoring Internal Parameters (Pressure, Temperature, Oil Level, and Gas Detection) | No |
| OPTIONAL FITTINGS | Provision of Anti-theft Stainless Steel Fasteners with Breakway Nut at top Cover | No |
| OPTIONAL FITTINGS | Provision of Drain Cum Sampling Valve | No |
| OPTIONAL FITTINGS | Provision of Self Protection/Disconnection Devices | No |
| OPTIONAL FITTINGS | Provision of Expulsion Fuse as Disconnection Device | No |
| SPECIAL TEST REPORTS | Availability of Test Report for Determination of Sound Level Test | No |
| SPECIAL TEST REPORTS | Availability of Test Report for No Load Current at 112.5% Voltage | No |
| SPECIAL TEST REPORTS | Availability of Test Report for Paint Adhesion Test | No |
| SPECIAL TEST REPORTS | BDV and Moisture Content of Oil in the Transformer | No |
| SPECIAL TEST REPORTS | Other Requirements | Losses and Impedance values as per Cl.6.8 and Table 3 of IS:1180 (Part 1):2014 latest, Limits of temepraturerise as per Cl.6.10 of IS:1180 (Part 1):2014 latest, Short circuit withstand test, Lightning impulse test as per IS:1180, Pressure test as per IS:1180 |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
East Central Railway
📍 CHANDAULI, UTTAR PRADESH
Iocl- Wrpl
📍 JAMNAGAR, GUJARAT
Hindustan Petroleum Corporation Ltd
📍 VISAKHAPATNAM, ANDHRA PRADESH
N/a
📍 PANIPAT, HARYANA
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS