TenderDekho Logo
GEM

Indian Army Plastic Pallets Tender for Palletized 130 mm Ammunition - 2026 Defence Procurement

Bid Publish Date

06-Jan-2026, 7:42 pm

Bid End Date

09-Jan-2026, 8:00 pm

Progress

Issue06-Jan-2026, 7:42 pm
Technical01-Aug-2026, 11:20 am
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

119

Bid Type

Two Packet Bid

Key Highlights

  • Critical brand/standard expectations: NABL/ILAC accredited lab tests for all pallet parameters
  • Technical standards: explicit dimensioning for base/middle/top pallets with 9-leg base and 4-way entry
  • Unique clause: 25% quantity variation and extended delivery timelines at buyer discretion
  • Eligibility: mandatory PAN, GSTIN, cancelled cheque, EFT mandate for vendor code creation
  • Warranty/quality: on-demand provision of central government test reports and ongoing certification transparency
  • Delivery integration: compatibility with palletized 130 mm ammunition handling workflows
  • Penalties: adherence to delivery schedules and conformity milestones with potential LDs
  • No BOQ items listed; focus on spec-driven procurement and test documentation

Categories 6

Tender Overview

The tender is issued by the Indian Army under the Department Of Military Affairs for the procurement of Plastic Pallets for Palletized 130 mm Ammunition (Defence). The scope emphasizes pallets with a base, middle, and top configuration, each with specified dimensions and design features, including a chequered top surface and stopper arrangements. Key requirements include acceptable static and dynamic load capacities and formal availability of central government/NABL/ILAC accredited test reports. The lack of a BOQ implies a bulk or spec-driven purchase with emphasis on conformity to military packaging standards and interoperability with existing pallet handling systems. A notable differentiator is the need for documented test reports on demand, ensuring traceability and quality assurance. This tender highlights rigid compliance with defense-grade packaging norms and a probable batch-wise delivery cadence aligned to military readiness.

Technical Specifications & Requirements

  • Product: Plastic Pallets (base, middle, top) for 130 mm ammunition pallets
  • Base pallet: dimensions with 9 legs, 4-way entry; middle pallet: stopper on both sides; top pallet: stopper on lower side, chequered design on top
  • Structural requirements: complete pallet structure with suitability for palletized ammunition handling
  • Load metrics: specify static load capacity (kgs) and dynamic load capacity (kgs); exact values to be provided by bidder
  • Testing: required test reports from central government/NABL/ILAC accredited labs covering all parameters; copies to be provided on demand
  • Documentation: ensure availability of all certifications and reports at time of supply
  • Delivery and integration: pallet design must integrate with existing 130 mm ammunition handling workflows and storage racks
  • Compliance: emphasize defense packaging standards and traceability to ensure reliability in field conditions

Terms, Conditions & Eligibility

  • Delivery terms: suppliers must comply with orders under the option clause allowing up to 25% quantity variation during contract and extended delivery periods with minimum 30 days added time; delivery starts from the last date of the original delivery order
  • Documentation: provide PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate duly certified by bank
  • EMD/Performance: embed performance considerations and ensure alignment with standard defense procurement risk controls
  • Compliance: ensure adherence to any buyer-specified terms and maintain readiness to supply test reports on demand at the time of delivery
  • Approval: any certification or report required must be current and verifiable against the requested parameters
  • Penalties: conform to standard defense procurement penalty structures for late or non-conforming deliveries

Key Specifications

  • Base pallet: 9 legs, 4-way entry

  • Middle pallet: stopper on both sides

  • Top pallet: stopper on lower side with chequered top surface

  • Total pallet structure ensures compatibility with 130 mm ammunition pallets

  • Static load capacity: to be provided by bidder (kgs)

  • Dynamic load capacity: to be provided by bidder (kgs)

  • Test reports: NABL/ILAC accredited lab coverage for all parameters

Terms & Conditions

  • Delivery quantity may increase up to 25% under option clause

  • Delivery period extends as per extended delivery period calculation

  • Bidder must submit PAN, GSTIN, cancelled cheque, and EFT mandate

Important Clauses

Payment Terms

No explicit payment terms provided; bidders must align with standard defense procurement payment terms and ensure invoicing with compliant documentation.

Delivery Schedule

Delivery starts from the last date of the original delivery order; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days.

Penalties/Liquidated Damages

Penalties applicable for late delivery or non-conformity; exact LD rates not specified in available data.

Bidder Eligibility

  • PAN Card and GSTIN validity

  • EFT mandate and bank certification

  • Capability to supply defense-grade plastic pallets with specified dimensions

  • Ability to furnish NABL/ILAC accredited test reports on demand

Documents 4

GeM-Bidding-8804797.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

HDPE / PE Plastic Pallets (Injection Moulded)

Southern Railway

VELLORE, TAMIL NADU

Posted: 29 January 2025
Closed: 17 February 2025
GEM

HDPE / PE Plastic Pallets (Injection Moulded)

Govt Of India Stationery Office

Posted: 6 January 2025
Closed: 27 January 2025
GEM

HDPE / PE Plastic Pallets (Injection Moulded)

Hindustan Aeronautics Limited (hal)

Posted: 27 November 2024
Closed: 18 December 2024
GEM

HDPE / PE Plastic Pallets (Injection Moulded)

Indian Army

Posted: 17 December 2024
Closed: 19 December 2024
GEM

HDPE / PE Plastic Pallets (Injection Moulded)

Indian Army

Posted: 9 December 2024
Closed: 11 December 2024
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Physical Characteristics Dimension of Base Pallet with 9 legs and 4 way entry 1000x900x197mm (+-10%)
Physical Characteristics Dimension of Middle Pallet with stopper on both sides 1000x900x100mm (+-10%)
Physical Characteristics Dimension of Top pallet with stopper on lower side. Top side to have chequered design 1000x900x100mm (+-10%)
Physical Characteristics Structure of pallet 4 way
Load Capacity Static load capacity (kgs) (Approx) 4000 Or higher
Load Capacity Dynamic load capacity (kgs)(Approx) 1200 Or higher
Test Reports Availability of test report from central govt/ NABL/ILAC accredited lab covering all parameters Yes, No
Test Reports Copies of all certifications and reports to be provided to buyer on demand at time of supplies Yes, No

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque copy

4

EFT Mandate certified by bank

5

Any existing test reports from NABL/ILAC accredited labs

6

Certificates of conformity for pallet dimensions and design

7

Vendor code registration documents

Technical Results

S.No Seller Item Date Status
1ADVENTS EVENTS & RESEARCH   Under PMAMake : NA Model : 130 MM PLASTIC08-01-2026 11:20:46Qualified
2GAURAV ASSOCIATES   Under PMAMake : NA Model : 130 MM PLASTIC08-01-2026 10:46:09Qualified
3M/S RADHA SHYAM ENTERPRISE   Under PMAMake : NA Model : 130 MM PLASTIC08-01-2026 10:56:12Qualified

Financial Results

Rank Seller Price Item
L1GAURAV ASSOCIATES(MII)   Under PMA₹7,14,000Item Categories : Plastic Pallets for Palletized 130 mm Ammunition (Defence)
L2M/S RADHA SHYAM ENTERPRISE (MII)   Under PMA₹7,73,500Item Categories : Plastic Pallets for Palletized 130 mm Ammunition (Defence)
L3ADVENTS EVENTS & RESEARCH (MII)   Under PMA₹8,21,100Item Categories : Plastic Pallets for Palletized 130 mm Ammunition (Defence)

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for plastic pallets tender in Indian Army 2026 defense?

Bidders should submit PAN, GSTIN, cancelled cheque, and EFT mandate with their bid. Ensure NABL/ILAC-lab tested certificates for the pallet dimensions and load capacities. The option clause allows up to 25% quantity variation, with delivery time adjustments as specified.

What test reports are required for 130 mm ammunition pallets?

Provide test reports from central government or NABL/ILAC-accredited labs covering all pallet parameters. Copies must be available on demand at time of supply, validating static/dynamic load ratings, and dimensional compliance.

What are the base/middle/top pallet dimension requirements?

Base: 9 legs with 4-way entry; Middle: stopper on both sides; Top: stopper on lower side with chequered top surface. Ensure overall structural integrity and compatibility with 130 mm ammunition handling systems.

What is the delivery-time framework for quantity variations?

The purchaser may increase quantity by up to 25% and adjust delivery time using (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days for added time.

Which documents must accompany the bid submission?

Submit PAN card copy, GSTIN copy, cancelled cheque, EFT Mandate, plus any available test reports. Ensure conformity with defense procurement requirements and readiness to provide on-demand certifications.

What are the essential eligibility criteria for suppliers?

Eligibility requires valid PAN and GSTIN, EFT mandate proof, capability to supply pallets meeting the described dimensions, and availability of NABL/ILAC test reports for compliance and traceability.

What standards or certifications are demanded for the pallets?

Pallets must be validated by NABL/ILAC-accredited labs; tests should confirm static and dynamic load ratings and dimensional accuracy in line with defense packaging norms.

When is the supply delivery expected after order placement?

Delivery timelines commence from the last date of the original delivery order; extended periods add time per the option clause with minimum 30 days, ensuring readiness for field deployment.